Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

Huawei Smart PV Solution Highlights Role In World’s Largest PV Plant

Urja Daily by Urja Daily
October 12, 2020
in News
Reading Time: 2 mins read
0
solar-park
Share on FacebookShare on TwitterShare on Linkedin

Chinese state-owned utility Huanghe Hydropower Development (“Huanghe Hydropower”) successfully connected its 2.2 GW PV plant to the power grid in Hainan Prefecture, northwestern China’s Qinghai Province. With this, the 2.2 GW project became the world’s first ultra-high voltage power line that delivers 100% renewable energy over long distances and also the world’s largest single-site renewable energy project built in the shortest construction time.

For Huanghe, the milestone project was  a prestigious project not just in terms of size, but device selection, construction standards, and technologies. The firm, which works with multiple partners to support and build a strong ecosystem for research and innovation, the partnership with Huawei was always going to be crucial, considering Huawei’s leadership in the inverter, and especially the string inverter space.

RELATED POSTS

Sustain Labs Paris Unveils 2025 Climate Leaders Cohort with 47% Indian Representation

THDCIL to Supply 184.08 MW Clean Power to Gujarat from Tehri PSP

The grid-connected 2.2 GW PV plant is located in Qinghai Province at an average altitude of over 3000 m. Built in five phases, it consists of 672 PV arrays with over 7 million PV modules. Three 330 kV booster stations were constructed and string inverters were installed. The cold, dry desert like conditions were considered ideal or solar power generation.

Huawei  claims to have provided 1.6 GW inverters for this project, making it the single largest supplier. As the world’s first ultra-high voltage power line that delivers 100% renewable energy over long distances, the project requires inverters with high voltage ride-through (HVRT) capability to ensure the safety and stability of the power grid. Being the first to pass the GB/T 37408-2019 technical requirements for photovoltaic grid-connected inverter, Huawei’s claims that its smart string inverter supports short circuit ratio (SCR) as low as 1.5, without power derating during HVRT. It can also connect to weak grids and offers fault ride-through capability, guaranteeing stable operation in various grid environments.

Besides cutting-edge inverters, this project also draws on the benefits of several intelligent technologies, such as MBUS power carriers, Smart I-V Curve Diagnosis 4.0, smart electro-luminescence (EL) detection, integrated application of trackers, bifacial PV modules, and smart inverters, and smart PV plant management. These significantly optimize O&M efficiency, facilitate accurate fault prediction, and minimize the levelized cost of electricity (LCOE). Through joint innovation, Huanghe Hydropower and Huawei developed the industry-leading smart I-V diagnosis technology for global PV O&M, which has been widely adopted worldwide.

The Huanghe project, and several other joint projects, have had a significant impact on the testing, development, and demonstration of both home grown and global technologies in China. The scale of this project, and the learnings from it could easily influence global best practices for some time to come.

Tags: 2.2 gw solar plantHuanghe HydroHuanghe solar plantHuawei fusion inverterHuawei Smart PVworld’s largest solar plant
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Sustain Labs Paris

Sustain Labs Paris Unveils 2025 Climate Leaders Cohort with 47% Indian Representation

by Palak
June 27, 2025
0

Delhi : Sustain Labs Paris (SLP), the world’s largest sustainability-focused venture builder, has unveiled the 2025 cohort of its prestigious Climate...

THDCIL

THDCIL to Supply 184.08 MW Clean Power to Gujarat from Tehri PSP

by Palak
June 27, 2025
0

For the supply of 184.08 MW clean power from India’s first Variable Speed Tehri PSP in Uttarakhand The agreement is...

Automotive Skills Development Council

PLI, EVs, and Skill Development Key to India’s Auto Future: Dr. Qureshi at ASDC Event

by Palak
June 25, 2025
0

New Delhi : Automotive Skills Development Council (ASDC) successfully hosted its Annual Partners Forum 2025 at The Grand Hotel, New Delhi,...

AXITEC Energy

AXITEC Energy Strengthens South India Presence with Alphadex Dealership in Karnataka

by Palak
June 25, 2025
0

New Delhi : German solar module manufacturer AXITEC Energy has appointed Alphadex Power Ventures LLP as its authorized dealer in Karnataka,...

COMAU

COMAU Unveils MYCO Collaborative Robots at Automatica 2025

by Palak
June 25, 2025
0

Combining collaborative safety features with ergonomic benefits, MyCo enables humans and robots to work side-by-side, improving employee well-being, optimizing floorspace,...

Next Post
Solar Energy

India set to add 56-58 GW of solar capacity to forecast 2023

crest-solar-chandigarh-265x171

Chandigarh Administration UT Target of generating 69 MW of solar energy by 2022.

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Sustain Labs Paris

Sustain Labs Paris Unveils 2025 Climate Leaders Cohort with 47% Indian Representation

June 27, 2025
THDCIL

THDCIL to Supply 184.08 MW Clean Power to Gujarat from Tehri PSP

June 27, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

Sustain Labs Paris Unveils 2025 Climate Leaders Cohort with 47% Indian Representation

THDCIL to Supply 184.08 MW Clean Power to Gujarat from Tehri PSP

PLI, EVs, and Skill Development Key to India’s Auto Future: Dr. Qureshi at ASDC Event

AXITEC Energy Strengthens South India Presence with Alphadex Dealership in Karnataka

Top 5 Emerging Opportunities in the LDPE Market

COMAU Unveils MYCO Collaborative Robots at Automatica 2025

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved