Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Wind

Indigena Capital Update on Pe-na-koam on-Reserve Wind Project

Urja Daily by Urja Daily
October 5, 2021
in Wind
Reading Time: 2 mins read
0
wind turbine project
Share on FacebookShare on TwitterShare on Linkedin

STANDOFF, AB – In 2016, the Kainai/Blood Tribe through their Kainaiwa Resources (“KRI”) development entity, partnered with Indigena Capital, LP (“Indigena”), to advance the on-Reserve Pe-na-koam wind project.  This 200 to 300 megawatt (“MW”) project will be the first industrial scale electricity generation wind farm of its kind on-Reserve in Alberta and will provide companies searching for power purchase agreements and/or renewable energy credits an option that also enables them to maximize their social impact.

“There are currently over 40 wind projects operating or underway in the Traditional Territory of the Blood Tribe in Alberta, but a noticeable absence of generation scale on-Reserve wind energy projects,” said Chief Roy Fox of the Kainai/Blood Tribe.  “In 2016 we set out to rectify this and began to re-evaluate the wind project opportunities on our lands.  With the help of our financial partner, Indigena Capital, we worked out a model to take an active role, instead of simply leasing out our lands to others to develop a project, something we are regularly approached by industry to do.  Indigena was able to provide the equity capital necessary for us to move this project forward to the stage where we could attract the right industry developer to partner with us in Pe-na-koam.”

RELATED POSTS

Powerica and K.P. Energy Sign PPAs for 100 MW Wind Projects with GUVNL

Vietnam Unveils New Legal Framework for Offshore Wind Development

“We are pleased to welcome a large-scale developer to the Pe-na-koam project on the Kainai/Blood Reserve,” said Christine Robertson, President, Indigena Capital.  “Key to any commercial opportunity of this scale that we progress with our partner Nations is to target qualified development partners.  Indigenous Communities look to successful commercial developments to provide for their socio-economic wellbeing for generations, so it is important to Indigena to ensure that each project undertaken can be best in class to achieve long-lasting benefits for the Nation, while achieving sector returns for investors.  We are honoured to have been chosen to partner with the Kainai/Blood Tribe in their renewable energy opportunity.”

The Pe-na-koam project is located on a site at the north end of the Kainai/Blood Tribe Reserve and comprises contiguous lands and ready access to transmission infrastructure, also located on the Kainai/Blood Tribe Reserve.  The Kainai/Blood Tribe’s economic participation in the partnership is designed to provide long-term stable commercial revenues, as well as jobs, and land rents that will benefit the Nation. 

In 2020 two new meteorological tower installations began monitoring conditions to optimize design of the project.  Expected at between 200 and 300 MW, Pe-na-koam Wind is ideally suited for Commercial and Industrial off-takers desiring to contract for power purchase and/or for renewable energy credits.  Companies searching to secure power purchase agreements and/or renewable energy credits, while also maximizing social impact are welcome to open discussions.

Tags: ElectricityIndigena CapitalPe-na-koampowerRenewable Energywind farmWind Project
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

KP Energy Limited

Powerica and K.P. Energy Sign PPAs for 100 MW Wind Projects with GUVNL

by Palak
August 6, 2026
0

Powerica Limited and K.P. Energy Limited have signed separate power purchase agreements (PPAs) with Gujarat Urja Vikas Nigam Limited (GUVNL)...

Wind

Vietnam Unveils New Legal Framework for Offshore Wind Development

by Palak
July 24, 2026
0

The Government of Vietnam has issued Decree 272/2026, introducing a new legal framework to support the development of offshore wind...

Wind

Vietnam issues new legal framework for offshore wind development

by Palak
July 23, 2026
0

The Government of Vietnam has issued Decree 272/2026, introducing a new legal framework to support the development of offshore wind...

Eurowind Energy

Eurowind Energy Romania Begins Construction of 138 MW Wind Projects

by Palak
July 22, 2026
0

Eurowind Energy Romania has commenced construction of three wind power projects, following the receipt of setting-up authorisations from the National...

SECI

SECI floats tender for 45.6 MW wind project in Andhra Pradesh

by Palak
July 20, 2026
0

The Solar Energy Corporation of India Limited (SECI) has invited bids for the design, engineering, supply, and construction of a...

Next Post
ALYI

ALYI Expects To Launch Electricity Production To EV Growth

Solar PV and Wind Turbine

Distributed Generation Market Size worth $ 182.96 Billion

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Protium

Protium secures approval for Scottish green hydrogen project

August 7, 2026
Adiabatic Technologies

Adiabatic Technologies Raises ₹83 Million for Advanced Battery Systems

August 7, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Protium secures approval for Scottish green hydrogen project

Adiabatic Technologies Raises ₹83 Million for Advanced Battery Systems

Serentica Renewables commissions 200 MWh BESS in Rajasthan

PFCCL transfers two inter-state transmission SPVs to POWERGRID and Apraava Energy

SECI Invites EoI for Green Urea and Methanol Carbon Sources

CGSSC and Tata Consulting Engineers Launch Project UTKARSH to Build Manufacturing Industry-Ready Workforce

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved