The Ministry of Power (MoP) has circulated a revised draft of the Electricity (Rights of Consumers) Amendment Rules, 2026, proposing to bring the amendments into effect from April 1, 2027. The energy storage requirement for prosumers would take effect from April 1, 2028. The amendments follow deliberations on the financial viability of discoms and challenges arising from higher renewable energy integration.
The proposed changes empower State Electricity Regulatory Commissions (SERCs) to determine net metering limits and associated charges based on state-specific conditions. Prosumers may also install renewable energy capacity beyond their sanctioned load, subject to prescribed limits. Installations exceeding the specified threshold may require energy storage equivalent to at least 20 per cent of daily generation, or another proportion determined by the SERC. In the absence of a state-specific threshold, this requirement would apply to systems exceeding 10 kW. Other changes include revised timelines for electricity connections, a minimum two-level consumer grievance redressal mechanism, revised time-of-day tariff implementation timelines, safeguards against abnormal billing variations and provisions enabling SERCs to establish demand response frameworks.









