Eurus Energy Holdings Corporation has commenced construction of the 33.6 MW Fukui Kunimi Wind Farm in Fukui City, Fukui Prefecture, Japan. Construction. The project is being developed by Fukui Kunimi Wind LLC, a joint venture between Eurus Energy and Tohoku Electric Power Company.
The wind farm will comprise nine wind turbines supplied by Vestas Wind Systems A/S, each with a capacity of 4.2 MW. The project is expected to begin commercial operations in March 2029 and generate enough electricity to meet the annual demand of around 24,000 households.








