Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

Ceigall India Secures Completion Certificate for ₹1,659.84 Crore Delhi–Saharanpur Highway Project

Completion Certificate received for the 16.85-km, six-lane, access-controlled stretch of NH-709B from the Delhi/UP Border to the Eastern Peripheral Expressway (EPE) Junction The project, with a revised estimated cost of ₹1,659.84 crore, forms part of the Economic Corridor under Phase I of Bharatmala Pariyojana The highway was declared fit for entry into operation with effect from September 12, 2024 Ceigall India will undertake Operation & Maintenance of the stretch at ₹2.88 crore per annum, plus escalation

Urja Daily by Urja Daily
October 14, 2026
in News
Reading Time: 2 mins read
0
Ceigall India
Share on FacebookShare on TwitterShare on Linkedin

National : Ceigall India Limited has received the Completion Certificate from the Authority’s Engineer for a key stretch of the Delhi–Saharanpur Highway in Uttar Pradesh, executed jointly with Gayatri Projects Limited. The certificate, dated October 12, 2026, is a key contractual milestone and formally certifies the completion of all highway works.

The project involves the development of a six-lane, access-controlled section of National Highway 709B for the National Highways Authority of India (NHAI), from the Delhi/UP Border to the EPE Junction (Chainage 14.750 km to 31.600 km). With a revised estimated project cost of ₹1,659.84 crore, the stretch forms part of the Economic Corridor being developed under Phase I of Bharatmala Pariyojana, the Government of India’s flagship programme to improve highway connectivity across the country.

RELATED POSTS

Yash Highvoltage Expands US Representation Network from 22 to 27 States

STMicroelectronics delivers advanced context-aware sensors in ST Sustainable Technology framework

The Completion Certificate confirms that all works forming part of the Project Highway have been completed. The Authority’s Engineer had declared the highway fit for entry into operation with effect from September 12, 2024, within the 30-day cure period following the extended completion date of August 15, 2024.

Commenting on the development, Ramneek Sehgal, Chairman & Managing Director, Ceigall India Limited, said, “The Completion Certificate for the Delhi–Saharanpur Highway is an important milestone for Ceigall. Access-controlled corridors such as this are critical to regional connectivity and to the faster movement of people and goods into the National Capital Region. The project adds to our track record of delivering large and complex highway works, and we will continue to serve the stretch through its operation and maintenance. We remain committed to building infrastructure that supports India’s long-term growth.”

The project was awarded on April 16, 2022, with a scheduled completion date of November 7, 2023, which was subsequently extended to August 15, 2024. The certificate adds to Ceigall’s record of completed highway projects as the Company continues to execute projects across roads, metro, renewable energy and power transmission.

Tags: Ceigall IndiaNHAIpowerRenewable Energy
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Yash Highvoltage

Yash Highvoltage Expands US Representation Network from 22 to 27 States

by Urja Daily
October 14, 2026
0

Vadodara: Yash Highvoltage Limited announced that its subsidiary, YASH HV USA INC., has entered into a 36-month Representation Agreement with EHV...

STMicroelectronics

STMicroelectronics delivers advanced context-aware sensors in ST Sustainable Technology framework

by Urja Daily
October 13, 2026
0

STMicroelectronics’ newest miniature motion sensors feature enhanced precision for accurate event reconstruction while meeting the most stringent sustainable-materials standards.  The...

electrical power substation with transformers and insulators

Tips for Better Seasonal Layup/Startup of Boilers and Cooling Water Systems

by Urja Daily
October 12, 2026
0

 No matter which side of the equator your boiler or cooling water system finds itself on, corrosion protection is an...

VinFast

VinFast India Signs Letters of Intent with First 50+ E-Motorcycle Dealers, Expanding Network To 15 States and 34 Cities

by Urja Daily
October 12, 2026
0

Hai Phong, Vietnam - VinFast officially signs Letters of Intent (LOIs) with its first 50+ e-motorcycle dealer partners across 15 states...

MG Windsor Indulge

MG Windsor Indulge Edition: Experience Luxury Like Never Before!

by Urja Daily
October 9, 2026
0

Gurugram : JSW MG Motor India has teased the first glimpse of the MG Windsor Indulge Edition, adding exclusivity to...

Next Post
BESS

5 BESS and Power Conversion Products Supporting India’s Renewable Energy Expansion

Yash Highvoltage

Yash Highvoltage Expands US Representation Network from 22 to 27 States

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Mr. Madhvendra Singh

Embedded Technology: The Intelligence Behind Electronics and the Careers of Tomorrow

October 14, 2026
Comau

Comau and InteCells Showcase Plasma-Based Battery Cell Manufacturing at The Battery ShowNorth America

October 14, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0

Embedded Technology: The Intelligence Behind Electronics and the Careers of Tomorrow

Comau and InteCells Showcase Plasma-Based Battery Cell Manufacturing at The Battery ShowNorth America

India’s Energy Transition: RE: DIALOGUES 2026 to Examine Future Energy Demand, Grid Readiness & Financing Needs

Eicher Trucks & Buses launches Uptime NXT Services powered by AI enabled Uptime Centre

Yash Highvoltage Expands US Representation Network from 22 to 27 States

5 BESS and Power Conversion Products Supporting India’s Renewable Energy Expansion

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved