Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Storage

Pace Digitek Wins EPC Contract for 250 MW BESS Project from NLC India

Palak by Palak
July 31, 2026
in Storage
Reading Time: 1 min read
0
Energy Storage
Share on FacebookShare on TwitterShare on Linkedin

Pace Digitek Limited has signed an engineering, procurement, and construction (EPC) contract with NLC India Limited for the development of 250 MW/500 MWh standalone battery energy storage system (BESS) projects across three locations in Tamil Nadu. The contract also includes operations and maintenance services for a period of 12 years.

In June 2026, Pace Digitek announced the signing of a power purchase agreement between TRANSGREENX, the asset-holding arm of Pace Group, and Bangalore Electricity Supply Company Limited for the development of a 250 MW solar project integrated with a 250 MW/1,100 MWh BESS at Pavagada solar park in Karnataka.

RELATED POSTS

CEA and DEA publish technology catalogues on energy storage and green fuels

HKSTP Unveils Its First-Ever Strategic Analysis Report on Battery and Energy Storage

In May 2026, Pace Digitek secured a contract worth Rs 7.10 billion from NLC India Renewables Limited for the development of a 250 MW/500 MWh BESS in Tamil Nadu. The project will be implemented across the Ottapidaram, Annupankulam, and Kayathar substations in the state.

Tags: BESSElectricityNLC IndiaPace Digitek
ShareTweetShare
Palak

Palak

Related Posts

Battery & Energy Storage

CEA and DEA publish technology catalogues on energy storage and green fuels

by Urja Daily
November 12, 2026
0

The Central Electricity Authority (CEA) and the Danish Energy Agency (DEA) have jointly published the first editions of the Indian...

HKSTP

HKSTP Unveils Its First-Ever Strategic Analysis Report on Battery and Energy Storage

by Urja Daily
October 30, 2026
0

Responding to Global Energy Transition Demands: Energy security, renewable energy grid integration, accelerating electrification, and surging power demand from AI...

Battery Energy Storage

CTUIL sets BESS discharge requirements for ISTS connectivity

by Urja Daily
October 27, 2026
0

Central Transmission Utility of India Limited (CTUIL) has set minimum discharge durations for battery energy storage systems (BESS) seeking connectivity...

Battery storage

Himachal Pradesh Launches Spiti Valley’s First Solar Plant with Battery Storage

by Urja Daily
October 21, 2026
0

The 2 MW plant is paired with a 1 MWh battery energy storage system (BESS) and was built at a...

Premier Energies

Premier Energies Subsidiary Signs JV Agreement for 12 GWh BESS Manufacturing

by Urja Daily
October 20, 2026
0

Premier Energies Limited’s wholly owned subsidiary, Premier Battery Technologies Private Limited (PBTPL), has executed a share allotment cum shareholders agreement...

Next Post
Inox Wind

Inox Wind Secures 200 MW Wind Project Order from NLC India

Tata Power

Tata Power begins construction of 800 MW renewable energy project in Andhra Pradesh

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

November 12, 2026
Mr.Vinkesh Gulati

Automotive Workforce Readiness in an Era of EVs AI and Automation

November 12, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • How VpCI® Packaging Cuts Plant Energy Use and Carbon Emissions?

    0 shares
    Share 0 Tweet 0

Understanding Self-Exclusion Programs and How They Support Problem Gamblers Heal

Automotive Workforce Readiness in an Era of EVs AI and Automation

Sub-Millisecond Battery Converter Gives 800 VDC AI Data Centers More Compute from the Same Grid Connection 

CEA and DEA publish technology catalogues on energy storage and green fuels

Telangana approves 7,300 MW renewable energy procurement with 8,000 MWh energy storage

TNB and IOI partner for 500 MW solar project in Malaysia

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved