Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Storage

Waaree Renewable signs ECI agreement for solar-BESS project in New Zealand

Palak by Palak
July 30, 2026
in Storage
Reading Time: 1 min read
0
Waaree Renewable
Share on FacebookShare on TwitterShare on Linkedin

Waaree Renewable Technologies Limited has signed an early contractor involvement (ECI) agreement with the special purpose vehicle of a leading global independent power producer for the development of a utility-scale solar photovoltaic project integrated with a battery energy storage system (BESS) in New Zealand. The project will be developed in consortium with two local companies. This marks the company’s entry into the Australia-New Zealand renewable energy market.

The ECI agreement covers preliminary project development activities and will remain valid for about four months. Upon successful completion of this phase, the project developer may award the engineering, procurement and construction contract to the consortium. If awarded, the project is expected to be executed over a period of 24 months.

RELATED POSTS

METSTO Enhances Warehouse Storage Systems with Advanced Racking Solutions

Premier Energies and RCT India Partner to Develop 12 GWh BESS Facility in Telangana

Tags: BESSRenewable EnergysolarWaaree Renewable
ShareTweetShare
Palak

Palak

Related Posts

METSTO Enhances Warehouse Storage Systems with Advanced Racking Solutions

by Urja Daily
September 23, 2026
0

Bangalore, Karnataka, India - Most warehouse problems don't start on the floor. They start with a storage setup that was...

Premier Energies

Premier Energies and RCT India Partner to Develop 12 GWh BESS Facility in Telangana

by Urja Daily
September 14, 2026
0

Premier Energies Limited and RCT India, part of RCT Group, Germany, have signed a binding term sheet to form a...

Inox Clean Energy

Inox Clean Energy completes Rs 60 billion acquisition of Vena Energy India

by Palak
August 20, 2026
0

Inox Clean Energy Limited, part of the INOXGFL Group, has completed the acquisition of Vena Energy India Holdings Pte Ltd,...

Philippines

Philippines Begins 41 MWp Solar-53 MWh BESS Project

by Palak
August 18, 2026
0

Citicore Renewable Energy Corporation and Pampanga I Electric Cooperative have broken ground on an integrated solar photovoltaic (PV) and battery...

Jupiter Wagons

Jupiter Wagons secures 100 MW BESS projects in West Bengal 

by Palak
August 12, 2026
0

Jupiter Wagons Limited, through e-reverse auctions conducted under tariff-based competitive bidding, has secured two standalone battery energy storage system (BESS)...

Next Post
Hiffin

Hiffin hosts Creator Walk for the photographers and content creators

Ather Energy

Ather Energy Rolls Out Pothole+ Alerts, Built on Connected Fleet Intelligence

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

KPI Green

KPI Green Wins Rs 20.25 Billion Solar EPC Contract from NACOF Oorja

September 30, 2026
POWERGRID

Vietnam’s PTC2 begins construction of third circuit of 220 kV Dong Ha–Hue line

September 30, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0

KPI Green Wins Rs 20.25 Billion Solar EPC Contract from NACOF Oorja

Vietnam’s PTC2 begins construction of third circuit of 220 kV Dong Ha–Hue line

Replacing Hazardous Nitrogen Blanketing with Waterborne VpCI® Fogging for Equipment Preservation

Tomoshia Holdings, Fujitsu Begin Major “TO-One” Core System Transformation

Servotech Unveils Next-Generation Solar Inverters at ‘Navaarambh 2026’, Celebrates Growing Channel Network

JSW Energy places orders for two 800 MW turbine generators for Salboni Phase II

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved