Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Storage

Goa issues tender for solar plus storage project

Palak by Palak
February 17, 2026
in Storage
Reading Time: 1 min read
0
Enlight Renewable Energy Limited
Share on FacebookShare on TwitterShare on Linkedin

Goa Energy Development Agency (GEDA) has floated a tender for the development of 300 MW of solar projects integrated with a 150 MW/900 MWh battery energy storage system (BESS).

According to the tender guidelines, the scope of work covers the design, engineering, supply, erection, testing, and commissioning of the solar and storage systems, along with the evacuation infrastructure. The evacuation infrastructure includes a 220 kV double-circuit transmission line, pooling substations, bay extensions, and upgrades to existing substations. Furthermore, the solar plus storage will be connected to the state transmission utility (STU) network at the nearest 220 kV STU or GEDA substation. The delivery point will be located on the 220 kV side of the 33/220 kV GEDA STU grid substation.

RELATED POSTS

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Pace Digitek Wins EPC Contract for 250 MW BESS Project from NLC India

The bidders are required to submit an earnest money deposit of Rs 50 million. Additionally, the successful bidder is required to submit a performance bank guarantee of Rs 150 million. The bid submission deadline is March 6, 2026.

Tags: BESSGEDAsolarStorage
ShareTweetShare
Palak

Palak

Related Posts

Battery Storage

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

by Palak
August 3, 2026
0

Pace Digitek Limited has secured an engineering, procurement, and construction (EPC) contract from NLC India Limited for the development of...

Energy Storage

Pace Digitek Wins EPC Contract for 250 MW BESS Project from NLC India

by Palak
July 31, 2026
0

Pace Digitek Limited has signed an engineering, procurement, and construction (EPC) contract with NLC India Limited for the development of...

Waaree Renewable

Waaree Renewable signs ECI agreement for solar-BESS project in New Zealand

by Palak
July 30, 2026
0

Waaree Renewable Technologies Limited has signed an early contractor involvement (ECI) agreement with the special purpose vehicle of a leading...

Sodium-ion Battery Market

Sodium-ion Battery Market Outlook 2026–2034: Energy Storage Investments Drive Growth

by Palak
July 28, 2026
0

The global sodium-ion battery market is charging toward a new era of affordable, sodium-abundant energy storage — and the numbers...

Cypress Creek Renewables and Google Break

Cypress Creek Renewables and Google Break Ground on 2.5 GW Solar-Plus-Storage Project in the U.S.

by Palak
July 16, 2026
0

Cypress Creek Energy and Google have commenced construction of the first two phases of the Steel River Energy Center in...

Next Post
Torrent Power Limited

Torrent Power to acquire Nabha Power from L&T for Rs 68.89 billion

V Sriram Kumar, CEO ELCIA

ELCIA Names New Leadership to Strengthen Semiconductor Ecosystem

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

August 3, 2026
278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved