Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable

KPI Green Energy secures order for a 300 MWac renewable power project

Palak by Palak
February 11, 2026
in Renewable
Reading Time: 1 min read
0
KPI Green Energy
Share on FacebookShare on TwitterShare on Linkedin

KPI Green Energy Limited has secured orders from entities of the Adani Group, namely Adani Green Energy and Adani Green Energy Six. The orders are for the execution of electrical, civil, and allied work for a 300 MWac/405 MWdc project at the Khavda hybrid renewable power project at the Khavda renewable energy park, Gujarat.

According to the order specifications, the scope of work includes electrical AC-DC works and civil works such as pile foundations, installation of stubs, and erection of module mounting structures and modules. It also covers robotic cleaning system structures, IDT stations, and the supply of electrical DC/AC and HT equipment, excluding the main equipment.

RELATED POSTS

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

NIRL Secures LoI for 900 MW Solar Project from GUVNL

Earlier in January 2026, KPI Green Energy Limited began generating and supplying power from its 200 MWac/240 MWdc grid-connected solar power project in Khavda.

Furthermore, in December 2025, KPI Green Energy Limited secured a work order worth approximately Rs 4.89 billion from Gujarat State Electricity Corporation for the engineering, procurement, and construction of a 142 MWp/110 MWac floating solar photovoltaic project.

Tags: Adani Green EnergyKPI Green Energypowerrenewable
ShareTweetShare
Palak

Palak

Related Posts

278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

by Palak
August 3, 2026
0

Bluebird Solar has announced a significant milestone by securing a 278 MW solar PV module supply order from Bridge &...

GUVNL

NIRL Secures LoI for 900 MW Solar Project from GUVNL

by Palak
August 3, 2026
0

NLC India Renewables Limited (NIRL), a wholly-owned subsidiary of NLC India Limited, has received a letter of intent (LoI) from...

Brookfield

Brookfield Launches Renewable Energy Platform Lumara

by Palak
August 3, 2026
0

Brookfield has launched Lumara, a new renewable energy platform focused on accelerating the development and construction of renewable energy projects....

NLC India

NLC India Renewables Wins 900 MW Solar Project from GUVNL

by Palak
August 3, 2026
0

NLC India Renewables Limited, a wholly owned subsidiary of NLC India Limited, has received a letter of intent (LoI) from...

Tata Power

Tata Power begins construction of 800 MW renewable energy project in Andhra Pradesh

by Palak
August 3, 2026
0

Tata Power Renewable Energy Limited (TPREL), a subsidiary of Tata Power, has conducted the groundbreaking ceremony for its 800 MW...

Next Post
Zelestra

Zelestra Bags €130 Million to Advance Renewables

Ceigall Infra

Ceigall Infra Wins ₹2,160 Crore Highway Project in Bihar

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

August 3, 2026
278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved