Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Storage

Allye Energy secures largest order to date as MAX500 launch expands energy storage range to four systems

Palak by Palak
December 9, 2025
in Storage
Reading Time: 4 mins read
0
Allye Energy
Share on FacebookShare on TwitterShare on Linkedin

●      Five MAX500 units ordered through Vital Power Group for use in construction, systems featuring integrated DC fast charging capability worth in excess of £1m

●      MAX500 (500kWh, 420kW) completes Allye’s product portfolio spanning 300kWh to 1.5MWh systems

RELATED POSTS

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Pace Digitek Wins EPC Contract for 250 MW BESS Project from NLC India

●      First system in Allye’s range with DC fast recharging enables mobile-to-mobile charging and rapid field deployment

●      Contract marks first major success under Allye’s three-year distribution agreement with Vital Group

●      Allye exemplifies the circular economy by repurposing second-use EV battery packs into robust battery energy storage systems.

London : Allye Energy has secured its largest purchase order to date: five MAX500 battery energy storage systems for deployment in the construction industry to address grid constraints.

The MAX500 systems (500kWh, 420kW each) will charge zero-emission construction equipment and vehicles, addressing critical infrastructure challenges where grid constraints and site logistics make traditional fixed charging impractical. The contract represents the first major commercial success under Allye’s recently announced three-year distribution agreement with Vital Group.

Construction sites typically face severe grid constraints, whilst heavy equipment such as excavators cannot be economically transported to distant charging points without eliminating productivity benefits. Allye’s mobile battery systems bring charging infrastructure directly to equipment, maintaining uptime whilst eliminating diesel generator emissions.

Alistair McNeil, COO of Allye Energy, commented:  “This order marks a watershed moment for Allye Energy. The launch of the MAX500 completes our product line-up, giving us four distinct systems addressing everything from power for film and TV production to grid-scale resilience and optimisation. The MAX500 solves one of construction electrification’s most challenging problems: keeping heavy equipment charged and productive across sprawling sites. Our mobile battery systems bring charging infrastructure to the equipment, maintaining productivity whilst eliminating emissions.”

Josh Wright, CEO of Vital Power Group, commented:  “At Vital Power Group, we’re committed to investing in new technologies that provide our customers with reliable, flexible, and sustainable power solutions. The MAX500 systems from Allye represent an exciting step forward, offering mobile, zero-emission energy storage that helps construction sites overcome grid constraints whilst maintaining operational uptime. We’re looking forward to receiving these systems, marking a significant milestone in our partnership with Allye. Once deployed on our customers’ sites, the units will be fully supported by our comprehensive maintenance packages, which includes service level agreements as short as 4-hours, and 24/7/365 emergency support, ensuring maximum reliability and peace of mind.”

Complete product portfolio addresses diverse market sectors

With the addition of the MAX500, Allye Energy now offers four battery energy storage systems covering the full spectrum of customer requirements:

MAX300 (~300kWh, 280kW): Fully mobile, trailer-mounted system weighing under 3.5 tonnes with minimal ADR requirements. Suitable for construction sites, film and TV production, events, and temporary power applications.

MAX500 (~500kWh, 420kW): Optimal balance of capacity, power, and mobility for construction applications, featuring integrated DC fast recharging capability.

MAX1000 (~1MWh, 840kW): High-capacity system for grid-tied EV charging hubs, manufacturing facilities, and construction sites requiring sustained high-power delivery.

MAX1500 (~1.5MWh, 1.25MW): Flagship ‘drop and go’ system deployable in under two minutes using a hook loader. Suitable for on-grid and off-grid applications including data centres, ports, and industrial electrification.

DC fast recharging transforms operational flexibility

The MAX500 is the first system in Allye’s range to feature DC fast recharging, enabling rapid replenishment from 20-80% state of charge in approximately one hour. This capability transforms mobile battery energy storage by enabling systems to recharge from any public DC fast charger or, critically for large-scale projects, to recharge each other in the field.

Jonathan Carrier, Founder & CEO at Allye Energy, commented: “The DC fast recharging capability we’ve developed for the MAX500 represents a fundamental advancement in mobile battery energy storage technology. By enabling our systems to rapidly recharge from DC sources – whether public infrastructure or other battery units – we’ve created a dynamic energy ecosystem that adapts to the complex logistics of large construction sites. This capability will be rolled out across our entire MAX range, transforming how mobile battery energy storage can be deployed and operated.”

The DC fast recharging capability will be progressively rolled out across Allye’s entire MAX range, including the mobile MAX300. This advancement enables systems to function within dynamic energy networks rather than as isolated power sources, creating unprecedented deployment flexibility for applications from construction sites to events, remote operations, and emergency response.

Strategic deployment for zero-emission construction

For complex infrastructure projects, Allye Energy’s mobile battery systems address the dual challenge of providing distributed, high-power charging that moves with the work. The deployment will distribute charging capability across construction sites, bringing power to equipment rather than equipment to power. This approach maintains equipment uptime, eliminates diesel generator emissions, and provides flexibility for dynamic construction environments where work constantly shifts.

The systems incorporate all advanced features of Allye’s established MAX range: smart connectivity, AI-driven load management, sophisticated power control, and grid-forming capabilities that enable seamless synchronisation with the grid and other power sources.

Tags: Allye EnergyEV BatteryEV chargingStorageVital Power
ShareTweetShare
Palak

Palak

Related Posts

Battery Storage

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

by Palak
August 3, 2026
0

Pace Digitek Limited has secured an engineering, procurement, and construction (EPC) contract from NLC India Limited for the development of...

Energy Storage

Pace Digitek Wins EPC Contract for 250 MW BESS Project from NLC India

by Palak
July 31, 2026
0

Pace Digitek Limited has signed an engineering, procurement, and construction (EPC) contract with NLC India Limited for the development of...

Waaree Renewable

Waaree Renewable signs ECI agreement for solar-BESS project in New Zealand

by Palak
July 30, 2026
0

Waaree Renewable Technologies Limited has signed an early contractor involvement (ECI) agreement with the special purpose vehicle of a leading...

Sodium-ion Battery Market

Sodium-ion Battery Market Outlook 2026–2034: Energy Storage Investments Drive Growth

by Palak
July 28, 2026
0

The global sodium-ion battery market is charging toward a new era of affordable, sodium-abundant energy storage — and the numbers...

Cypress Creek Renewables and Google Break

Cypress Creek Renewables and Google Break Ground on 2.5 GW Solar-Plus-Storage Project in the U.S.

by Palak
July 16, 2026
0

Cypress Creek Energy and Google have commenced construction of the first two phases of the Steel River Energy Center in...

Next Post
Solar-Powered EV Charger Market

Solar-Powered EV Charger Market to Hit $7.8B by 2033

CRE733 Wind Farm

The critical role of grid stability in the energy transition

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

August 3, 2026
278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved