Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Hydrogen

MNRE Releases Updated Guidelines for HVICs and Green Hydrogen Hubs

Palak by Palak
July 16, 2025
in Hydrogen
Reading Time: 2 mins read
0
MNRE
Share on FacebookShare on TwitterShare on Linkedin

The Ministry of New and Renewable Energy (MNRE) has released revised guidelines for setting up Hydrogen Valley Innovation Clusters (HVICs) and green hydrogen hubs in India under the National Green Hydrogen Mission (NGHM). These clusters are designed to act as test beds and living labs, supporting business innovation, linking hydrogen producers to off-takers, and building local hydrogen value chains. Four HVICs will be set up with an allocation of Rs 1.72 billion. Each HVIC must arrange for its own land, as no funding is provided for land acquisition. Hydrogen hubs, as larger ecosystems, will require a minimum planned capacity of 100,000 metric tonnes per annum of green hydrogen and will pool resources from central and state governments, local authorities, and industry stakeholders.

The scheme is structured into two components: Component A for HVICs, managed by the Department of Science and Technology (DST) through a nominated scheme implementing agency (SIA), and Component B for green hydrogen hubs, managed by MNRE. Component B is further split into B1, involving the preparation of detailed project reports with an allocation of Rs 280 million, and B2, which allows for recognition of potential hubs without financial support. Central financial assistance (CFA) for HVICs under Component A will be disbursed in three stages: 40 per cent on administrative approval, 40 per cent upon utilisation of 80 per cent of committed funding, and 20 per cent upon production of the first lot of green hydrogen. For detailed project report (DPR) preparation under Component B1, CFA will be released in three stages: 30 per cent on sanction, 40 per cent upon draft DPR submission, and 30 per cent on final acceptance. The funding covers both capital expenditure, such as site preparation and equipment procurement, and operational expenses, including manpower and plant engineering.

RELATED POSTS

AESL Bags ₹85 Billion Transmission Project for Green Hydrogen Supply in Andhra Pradesh

India’s Green Hydrogen Export Push Needs Faster Infrastructure and Market Alignment

Mandatory activities under HVICs include production through methods like electrolysis and bio-routes, storage and transportation using compressed and pressurised systems, and utilisation in applications such as ammonia production and direct reduction of iron. HVICs will also focus on research, innovation, capacity building, and long-term sustainability by scaling production, reducing hydrogen costs, and establishing new partnerships. Selection of HVICs and green hydrogen hubs will follow merit-based evaluation, with monitoring handled by separate steering committees and project appraisal committees under the DST and MNRE, respectively. Intellectual property rights generated under the scheme will be governed by consortium agreements and specific guidelines issued by the DST and SIA.

Tags: HVIHydrogenMNRESIAStorage
ShareTweetShare
Palak

Palak

Related Posts

Hydrogen

AESL Bags ₹85 Billion Transmission Project for Green Hydrogen Supply in Andhra Pradesh

by Palak
July 30, 2026
0

Adani Energy Solutions Limited (AESL) has secured an inter-state transmission project worth approximately Rs 85 billion in Andhra Pradesh. The...

India’s Green Hydrogen Export Push Needs Faster Infrastructure and Market Alignment

by Palak
July 27, 2026
0

India’s abundant renewable resources and large domestic hydrogen market position it as a strong contender in the global green hydrogen race. However, the nation needs coordinated infrastructure development, certification alignment, and...

Hydrogen

France Selects Three Hydrogen Projects for €778 Million Support

by Palak
July 24, 2026
0

The French government has announced Hydrozere, eM-Rhône and FertHySomme as the first three winners of its hydrogen scheme. This 15-year...

Aker Solutions

Aker Solutions Bags 150 MW Hydropower Project in Norway Infra

by Palak
July 1, 2026
0

Aker Solutions has secured a contract from Tussa Energi to supply all electromechanical equipment for the Tussa II hydropower plant....

NHPC and UPPCL

NHPC and UPPCL sign PPA for 260 MW Dulhasti Stage-II hydro project

by Palak
July 1, 2026
0

NHPC Limited and Uttar Pradesh Power Corporation Limited (UPPCL) have signed a power purchase agreement (PPA) for the supply of...

Next Post
Non-Fossil Fuel Power

India Hits 50% Non-Fossil Fuel Power Capacity Milestone

Shakti Pumps

Shakti Pumps Invests ₹120 Million to Boost Solar Manufacturing Operations

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

August 3, 2026
278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved