Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

Sembcorp Wins 150 MW Solar Project with 300 MWh Battery Storage

Palak by Palak
May 31, 2025
in Solar, Storage
Reading Time: 1 min read
0
Sembcorp
Share on FacebookShare on TwitterShare on Linkedin

Sembcorp Industries, through its subsidiary Sembcorp Green Infra Private Limited (SGIPL), has been awarded a 150 MW solar power project integrated with a 300 MWh battery energy storage system (BESS) by SJVN Limited. The project will be developed on a build-own-operate basis, and is expected to begin commercial operations within 24 months of signing the 25-year power purchase agreement. Funding for the project will reportedly be arranged through a combination of internal resources and debt. 

The company secured the project in a competitive auction conducted by SJVN, at a tariff of Rs 3.32 per kWh. The project was part of a 1,200 MW solar project and 600 MW/2,400 MWh BESS project tender floated in September 2024. 

RELATED POSTS

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

NIRL Secures LoI for 900 MW Solar Project from GUVNL

With the addition of this project, Sembcorp’s total renewable energy portfolio in India has reached a capacity of 6.3 GW. Moreover, the company’s global renewables portfolio, including acquisitions pending completion, now totals 17.7 GW.

Tags: Battery StorageBESSRenewable EnergySembcorpsolar
ShareTweetShare
Palak

Palak

Related Posts

Battery Storage

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

by Palak
August 3, 2026
0

Pace Digitek Limited has secured an engineering, procurement, and construction (EPC) contract from NLC India Limited for the development of...

GUVNL

NIRL Secures LoI for 900 MW Solar Project from GUVNL

by Palak
August 3, 2026
0

NLC India Renewables Limited (NIRL), a wholly-owned subsidiary of NLC India Limited, has received a letter of intent (LoI) from...

NLC India

NLC India Renewables Wins 900 MW Solar Project from GUVNL

by Palak
August 3, 2026
0

NLC India Renewables Limited, a wholly owned subsidiary of NLC India Limited, has received a letter of intent (LoI) from...

Energy Storage

Pace Digitek Wins EPC Contract for 250 MW BESS Project from NLC India

by Palak
July 31, 2026
0

Pace Digitek Limited has signed an engineering, procurement, and construction (EPC) contract with NLC India Limited for the development of...

Waaree Renewable

Waaree Renewable signs ECI agreement for solar-BESS project in New Zealand

by Palak
July 30, 2026
0

Waaree Renewable Technologies Limited has signed an early contractor involvement (ECI) agreement with the special purpose vehicle of a leading...

Next Post
Delta Electronics

Delta Inks Strategic Renewable Energy Deal to Fast-Track Net-Zero Goals

Minakshi Baranwal, Senior Sales Co-ordinator, AXITEC Energy India Pvt. Ltd

Synergizing Solar Energy with Battery Storage to Tackle Summer Peak Demand of Energy Consumption

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

August 3, 2026
278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved