Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Hydrogen

MEDA Issues Tender for 130 KTPA Green Hydrogen Facilities

Palak by Palak
May 14, 2025
in Hydrogen
Reading Time: 1 min read
0
MEDA
Share on FacebookShare on TwitterShare on Linkedin

The Maharashtra Energy Development Agency (MEDA) has issued a tender inviting bids for establishing green hydrogen production facilities with a cumulative capacity of 130 kilo tonnes per annum (KTPA) under the Maharashtra Green Hydrogen Policy 2023. 

According to the tender guidelines, the scope of work includes installation, commissioning, and long-term operation of green hydrogen and associated renewable energy facilities. The scope also includes installing approved monitoring systems and regularly submitting compliance and production reports. The bidders must submit a money deposit of Rs 7.5 million per KTPA in the form of a 12-month valid bank guarantee. The tender includes anchor units of up to 100 KTPA and experimental anchor units of 30 KTPA. Furthermore, the bidders are required to submit construction plans, programme evaluation and review technique charts, and evidence of their ability to commission at least 80 per cent of the awarded capacity. Failure to commission 80 per cent of the awarded capacity will lead to disqualification from incentives. Electrolyser underperformance or insufficient renewable energy integration will attract a one per cent penalty on the minimum fixed capital investment. 

RELATED POSTS

AESL Bags ₹85 Billion Transmission Project for Green Hydrogen Supply in Andhra Pradesh

India’s Green Hydrogen Export Push Needs Faster Infrastructure and Market Alignment

Additionally, the modules used must be sourced from the Approved List of Models and Manufacturers mandated by the Ministry of New and Renewable Energy. The deadline for bid submission is July 4, 2025. According to the eligibility criteria, the bidders must demonstrate a net worth of Rs 600 million per KTPA as of financial year 2023–24, comprising Rs 150 million for green hydrogen and Rs 450 million for renewable energy. Additionally, the total capital per bidder is set at Rs 60 billion.

Tags: Green HydrogenKTPaMEDARenewable Energy
ShareTweetShare
Palak

Palak

Related Posts

Hydrogen

AESL Bags ₹85 Billion Transmission Project for Green Hydrogen Supply in Andhra Pradesh

by Palak
July 30, 2026
0

Adani Energy Solutions Limited (AESL) has secured an inter-state transmission project worth approximately Rs 85 billion in Andhra Pradesh. The...

India’s Green Hydrogen Export Push Needs Faster Infrastructure and Market Alignment

by Palak
July 27, 2026
0

India’s abundant renewable resources and large domestic hydrogen market position it as a strong contender in the global green hydrogen race. However, the nation needs coordinated infrastructure development, certification alignment, and...

Hydrogen

France Selects Three Hydrogen Projects for €778 Million Support

by Palak
July 24, 2026
0

The French government has announced Hydrozere, eM-Rhône and FertHySomme as the first three winners of its hydrogen scheme. This 15-year...

Aker Solutions

Aker Solutions Bags 150 MW Hydropower Project in Norway Infra

by Palak
July 1, 2026
0

Aker Solutions has secured a contract from Tussa Energi to supply all electromechanical equipment for the Tussa II hydropower plant....

NHPC and UPPCL

NHPC and UPPCL sign PPA for 260 MW Dulhasti Stage-II hydro project

by Palak
July 1, 2026
0

NHPC Limited and Uttar Pradesh Power Corporation Limited (UPPCL) have signed a power purchase agreement (PPA) for the supply of...

Next Post
BluPine Energy

BluPine Energy Achieves Financial Closure for 100 MW Solar Project in Gujarat

SLP Innovation

SLP and Posterity Institute Launch Program to Boost UAE Market Entry for Innovators

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

August 3, 2026
278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved