Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Storage

Vistra Complete Expansion of Battery Energy Storage System

Urja Daily by Urja Daily
August 20, 2021
in Storage
Reading Time: 5 mins read
0
Energy+storage
Share on FacebookShare on TwitterShare on Linkedin

MOSS LANDING, Calif. – Vistra recently completed construction on Phase II of its Moss Landing Energy Storage Facility. The battery system is now storing power and releasing it to California’s grid when it is needed. The 100-megawatt expansion now brings the facility’s total capacity to 400 megawatts/1,600 megawatt-hours, making it the largest of its kind in the world.

“This facility provides a solution California desperately needs and this expansion was able to come online at the right time – as the summer heat intensifies and demand for electricity is at its highest. It is possible because of the partnership between Vistra and the State of California, Pacific Gas and Electric Company, LG Energy Solution, and Burns & McDonnell,” said Curt Morgan, chief executive officer at Vistra. “The state’s laudable immense buildout of intermittent renewable power has both lowered emissions and presented a reliability challenge. California produces an excess amount of renewable power during the day while the sun is up, but often struggles to meet demand as the sun goes down. Our Moss Landing battery system helps to fill that reliability gap, storing the excess daytime power so it doesn’t go to waste and then releasing it to the grid when it’s needed most.”

RELATED POSTS

Sun Drops Energia signs 120 MW/240 MWh BESPA with GUVNL

Ceigall India secures 150 MW standalone BESS projects in Punjab

Announced just 15 months ago with construction starting in September 2020, the Phase II expansion project was completed in July 2021, ahead of schedule despite the many challenges presented by the COVID-19 pandemic. 

Utilizing technology from LG Energy Solution, Vistra’s enormous lithium-ion battery system is co-located on the site of its existing Moss Landing Power Plant in Monterey County, a site that’s been providing electricity to Californians since 1950. Burns & McDonnell provided engineering, procurement, and construction (EPC) expertise for the expansion.

Morgan continued, “What’s great about this particular site is that it has the space to support even further expansion – up to 1,500 MW/6,000 MWh – while responsibly utilizing our existing site infrastructure, including existing transmission lines and grid interconnection. California leads the country in the transition away from fossil fuels and the Moss Landing Energy Storage Facility stands as a model for how batteries can support intermittent renewables to help create a reliable grid of the future.”

The 100-MW/400-MWh Phase II expansion is operating under a 10-year resource adequacy agreement with Pacific Gas and Electric Company (PG&E). The 300-MW/1,200-MWh Phase I project has a similar 20-year resource adequacy agreement with PG&E.

Vistra is a market-leader in battery energy storage and in 2020 announced it would spend approximately $5 billion by 2030 in renewable and battery energy storage, including nearly $1 billion of development projects already underway, rotating its generation fleet towards zero-emission technologies. Moss Landing is the flagship project of the company’s carbon-free Vistra Zero portfolio of generation assets.

Support for Vistra Moss Landing Energy Storage Facility

Congressman Jimmy Panetta: “As California and the Central Coast derive more and more of our energy from renewable resources, storage is key for ensuring that power is available when the sun isn’t shining, and the wind isn’t blowing. The energy storage facility that Vistra is deploying in Moss Landing will help us build a more reliable, low-emission grid, providing zero-emission power to communities far and wide when they need it. As we face the increasing threat of wildfires and disruptions to our grid, this backup power can serve to bolster our grid’s stability and reliability.”

State Senator John Laird: “California has committed itself to a renewable energy future and the Central Coast is the perfect example of how to transition former fossil fuel plants to renewable energy centers.  Vistra’s Moss Landing Energy Storage Facility is a testament to that bright future. Developing battery storage in conjunction with wind and solar energy will ensure reliable, clean energy for decades to come.”

Monterey County Supervisor John M. Phillips: “When people think about Moss Landing energy, they usually envision the landmark power plant and its two tall smokestacks. In fact, Vistra’s Moss Landing Energy Storage Facility is the largest battery storage facility of its kind in the world and is providing a tremendous amount of reliable, clean energy. Vistra continues to be an outstanding community partner and reliable steward of the historic Moss Landing Power Plant.”

Mark Rothleder, senior vice president and chief operating officer, California Independent System Operator: “This facility and others like it will show California and the world what lithium-ion battery storage can accomplish. It will help us keep the lights on this summer and summers to come.”

Jason Glickman, executive vice president of Engineering, Planning & Strategy, Pacific Gas and Electric Company: “Together we are ushering in a new era of electric system reliability and delivering a vision into the future for our customers with the commissioning of the Vistra Moss Landing energy storage facility. We are committed to safely delivering reliable and clean energy in a way that achieves the greatest value for our customers, but we can’t go it alone into this clean energy future. Projects like this require great partners, such as Vistra, and PG&E will continue to seek out and work with the best and brightest to provide breakthrough clean energy solutions for our customers.”

Youngjoon Shin, senior vice president of ESS Business, LG Energy Solution: “As more intermittent resources integrate into power grids, the role of battery energy storage in supplying energy and ensuring grid reliability becomes even more important. On this note, Vistra’s effort towards transitioning to emission-free energy is vital, and LG Energy Solution hopes to make the transition a reality through advanced lithium-ion battery technology. As the world’s largest energy storage facility, Moss Landing is especially meaningful as it shows the dedication of both LG Energy Solution and Vistra to expanding eco-friendly renewable energy sources through energy storage technology.”

Ray Kowalik, chairman and CEO, Burns & McDonnell: “This was truly an amazing project for everyone involved. Designing and building the expansion of the world’s largest battery energy storage facility – particularly during a global pandemic – was very fulfilling. Renewable resources cannot be fully deployed unless we have a massive investment in energy storage like the Moss Landing facility. We are honored to partner with Vistra on such an iconic project that will help provide reliable power to the residents in the region.”

Tags: BatteryCaliforniaEnergy StorageGridpowerVistra
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Sun Drops Energia

Sun Drops Energia signs 120 MW/240 MWh BESPA with GUVNL

by Palak
May 25, 2026
0

Sun Drops Energia Limited, a subsidiary of KPI Green Energy Limited, has signed a battery energy storage purchase agreement (BESPA)...

Ceigall India

Ceigall India secures 150 MW standalone BESS projects in Punjab

by Palak
May 18, 2026
0

Ceigall India Limited has secured two separate orders from Punjab State Power Corporation Limited for development of standalone battery energy...

POWERGRID

POWERGRID Invites Bids for 300 MWh Battery Storage Project

by Palak
May 17, 2026
0

Power Grid Corporation of India Limited (POWERGRID) has invited tender for design, supply, erection, testing and commissioning of a 150...

GE Vernova

GE Vernova secures order for 1.35 GW Upper Sileru pumped storage project

by Palak
May 7, 2026
0

GE Vernova has secured an order from Megha Engineering & Infrastructures Limited (MEIL) to supply nine 150 MW pumped storage...

LPG

India’s LPG Crisis Signals Urgent Energy Infrastructure Push

by Palak
April 28, 2026
0

New Delhi : The ongoing LPG disruption linked to tensions in West Asia has brought renewed attention to India’s energy security,...

Next Post
EcoFlow DELTA

EcoFlow Launche DELTA Max, Two-Day Home Backup Power Station

NHPC Ltd

NHPC Ltd: Tender For 100MW Solar PV Power Plant in Tamilnadu

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Joint solar

Joint Solar sharpens focus on TOPCon and higher-efficiency solar modules

June 3, 2026
Shri V. Packirisamy

V. Packirisamy Appointed Director (Commercial) at Power Finance Corporation Limited

June 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • How proper refurbishment can extend life of pre-owned bikes in India?

    0 shares
    Share 0 Tweet 0
  • ACWA Power Signs Landmark $10 Billion Clean Energy Agreements

    0 shares
    Share 0 Tweet 0

Joint Solar sharpens focus on TOPCon and higher-efficiency solar modules

V. Packirisamy Appointed Director (Commercial) at Power Finance Corporation Limited

Sharika Enterprises Limited Enters SCADA-ADMS Market with Uttarakhand Grid Modernization Project

Cargill Launches Two-Year Livestock Development Initiative to Strengthen Maharashtra’s Dairy Sector

Flip Chip Technology Market Witnesses Rising Demand from Consumer Electronics Sector

Servotech Signs ₹400 Crore MoU for Haryana Manufacturing Expansion

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved