Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable

EWEC Announces 4.6 GW Clean Energy Projects in Abu Dhabi

Urja Daily by Urja Daily
December 30, 2024
in Renewable
Reading Time: 1 min read
0
EWEC
Share on FacebookShare on TwitterShare on Linkedin

EWEC (Emirates Water and Electricity Company) has announced approval for the allocation of four new sites for renewable energy projects in Abu Dhabi. These sites span approximately 75 square km and are designated for the development of advanced solar photovoltaic (PV) and wind energy facilities. 

Furthermore, these four sites will have three new solar photovoltaic (PV) plants in Al Faya, Al Khazna, and Al Zarraf, along with a wind farm in Sila. These projects are expected to deliver an additional 4.5 GW of solar PV capacity and up to 140 MW of wind capacity for Abu Dhabi. Additionally, the solar PV developments will contribute to EWEC’s goal of achieving 10 GW of installed solar PV capacity by 2030 and 18 GW by 2035

RELATED POSTS

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

NIRL Secures LoI for 900 MW Solar Project from GUVNL

In April 2024, EWEC in collaboration with Masdar chose EDF Renewables and Korea Western Power Company (KOWEPO) to develop the 1.5 GW Al Ajban Solar PV Independent Power Project.

Tags: Clean EnergyElectricityEWECpowerRenewable Energy
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

by Palak
August 3, 2026
0

Bluebird Solar has announced a significant milestone by securing a 278 MW solar PV module supply order from Bridge &...

GUVNL

NIRL Secures LoI for 900 MW Solar Project from GUVNL

by Palak
August 3, 2026
0

NLC India Renewables Limited (NIRL), a wholly-owned subsidiary of NLC India Limited, has received a letter of intent (LoI) from...

Brookfield

Brookfield Launches Renewable Energy Platform Lumara

by Palak
August 3, 2026
0

Brookfield has launched Lumara, a new renewable energy platform focused on accelerating the development and construction of renewable energy projects....

NLC India

NLC India Renewables Wins 900 MW Solar Project from GUVNL

by Palak
August 3, 2026
0

NLC India Renewables Limited, a wholly owned subsidiary of NLC India Limited, has received a letter of intent (LoI) from...

Tata Power

Tata Power begins construction of 800 MW renewable energy project in Andhra Pradesh

by Palak
August 3, 2026
0

Tata Power Renewable Energy Limited (TPREL), a subsidiary of Tata Power, has conducted the groundbreaking ceremony for its 800 MW...

Next Post
Gensol Engineering

Gensol Engineering Bags Rs 8.97 Billion Contract for 225 MW Solar Project

Hero Future Energies

HFE Commissions 29 MWp Open-Access Solar Project in Karnataka

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

August 3, 2026
278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved