Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Power

NTPC Successfully Converts Captured Carbon Dioxide to Methanol at Power Plant

Urja Daily by Urja Daily
November 11, 2024
in Power
Reading Time: 1 min read
0
Carbon Dioxide to Methanol at Power Plant
Share on FacebookShare on TwitterShare on Linkedin

NTPC has announced that it has been successful in the synthesis of carbon dioxide captured from flue gas with hydrogen produced from a PEM electrolyser. This was then converted into methanol at NTPC’s Vindhyachal plant. This is a big achievement in carbon management and sustainable fuel production as both the carbon dioxide capture plant and the carbon dioxide-to-methanol plant are the first of their kind in the world.

Additionally, NTPC is also working on Gen-4 ethanol, green urea, and sustainable aviation fuel. The company has also developed and tested ‘first indigenous catalyst’ for Methanol Synthesis and made substantial progress with hydrogen, carbon capture, and other innovative technologies.

RELATED POSTS

Delta Electronics Inks 12-Year Wind Power PPA with TANGEDCO in Tamil Nadu

Torrent Power signs long-term LNG SPA with BP Singapore

In November 2024, NTPC announced that, through its research and development wing NETRA, will be setting up a green hydrogen production plant. The plant will utilise plasma oxy gasification of municipal solid waste (MSW) and agri-waste technology.

In October 2024, NTPC declared the results of its 1.2 GW interstate transmission system (ISTS)-connected solar projects auction. SEAL, Rays Power, and Refex Green secured a capacity of 300 MW, 100 MW, and 100 MW, respectively. They all had the same tariff of Rs 2.50 per kWh. On the other hand, ReNew Solar and Illuminate Hybren were awarded 300 MW and 176 MW at a tariff of Rs 2.51 per kWh. NTPC had allocated only 976 MW as of then.

Tags: carbon dioxideHydrogenNTPCTechnology
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Delta Electronics

Delta Electronics Inks 12-Year Wind Power PPA with TANGEDCO in Tamil Nadu

by Palak
June 5, 2025
0

Delta Electronics India has signed a 12-year power purchase agreement (PPA) to procure 9.6 million units of wind energy annually...

Torrent Power Limited

Torrent Power signs long-term LNG SPA with BP Singapore

by Palak
June 5, 2025
0

Torrent Power Limited has signed a long-term sales and purchase agreement (SPA) with BP Singapore Pte. Limited, a subsidiary of...

Syria

Syria Signs USD 7 Billion Power Deal with UCC Holding Consortium

by Palak
June 2, 2025
0

Syria has signed a memorandum of understanding (MoU) with a consortium of international companies led by Qatar’s UCC Holding to...

IMFA

IMFA Signs PPA with AMPIN for 40 MW Hybrid Power Project

by Palak
May 31, 2025
0

Indian Metals & Ferro Alloys Limited (IMFA) has signed a 25-year power purchase agreement (PPA) with AMPIN Energy Utility One...

Comau Powers

Comau Powers Li Auto’s Next-Gen Range Extender with Innovative Automation Technology

by Palak
May 30, 2025
0

Shanghai –  Comau has designed and developed cutting-edge automation technology for Li Auto’s next-generation range extender line, allowing the Chinese EV...

Next Post
Hexa Climate

Hexa Climate, ACME Solar, and Avaada Energy Secure 1,200 MW FDRE Project from NTPC

Haryana Solar

Haryana Awards Contracts for 17,458 Solar Pumps

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Recyclekaro Plant

Recyclekaro Group Brings Recycling to the Doorstep with Its New D2C Platform

June 7, 2025
Servotech

Errol Musk Wraps Up 6-Day India Tour, Applauds Green Tech and Rich Culture

June 7, 2025
  • 643 Followers
  • 23.9k Followers

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

Recyclekaro Group Brings Recycling to the Doorstep with Its New D2C Platform

Errol Musk Wraps Up 6-Day India Tour, Applauds Green Tech and Rich Culture

HyperloopTT’s Italian Project Begins Operations

World Environment Day 2025

AI and Machine Learning Driving Innovation in ADAS Market

Comau Showcases E-Drive and Stator Tech at CWIEME 2025

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved