Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

NHPC Issues Tender for 7.6 MW Rooftop Solar Project

Urja Daily by Urja Daily
September 26, 2024
in Solar
Reading Time: 1 min read
0
NHPC Solar
Share on FacebookShare on TwitterShare on Linkedin

NHPC Limited has floated a tender for the development of 7.68 MW grid-connected rooftop solar power systems. This project is being conducted under the PM Surya Ghar: Muft Bijli Yojana. The last date for submission of bids is October 29, 2024. The projects will be implemented in four different zones with different capacities. The allocated zones are Zone 1: Jammu and Kashmir (4,102 Kw); zone 2: Himachal Pradesh (1,710 Kw); zone 3: Uttar Pradesh and Uttarakhand (774 kW); and zone 4: Sikkim, West Bengal, and Manipur (1,098 Kw).

According to the tender guidelines, bidders have to pay Rs 5,000 as document fee in Jammu and Kashmir and Rs 1,500 in the other zones. They must submit an earnest money deposit as a bid security of Rs Rs 4 million for Zone 1, Rs 1.78 million for Zone 2, Rs 805,000 for Zone 3, and Rs 1.14 million for Zone 4. The bidders should have a minimum turnover of Rs 81.2 million for zone 1, Rs 33.8 million for zone 2, Rs 15.3 million for zone 3 and Rs 21.7 million for zone 4. The working capital requirements are Rs 45.1 million, 18.8 million, 8.5 million and 12.1 million for zone 1, 2, 3 and 4 respectively.

RELATED POSTS

NIRL Secures LoI for 900 MW Solar Project from GUVNL

NLC India Renewables Wins 900 MW Solar Project from GUVNL

Furthermore, the projects have to be completed within nine months of Notification of Award. The winning bidder will also have to perform the operation and maintenance of the project for five years.

Recently in September 2024, NHPC floated a tender for 1.2 GW Inter-State Transmission System (ISTS)-connected solar power projects with a 600 MW/12,000 MWh energy storage system (ESS). It was also accorded with the Navratna status in the same month. In July 2024, Jakson Green inked a power purchase agreement with NHPC for a 400 MW solar project.

Tags: ESSISTSNHPC Solarpower
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

GUVNL

NIRL Secures LoI for 900 MW Solar Project from GUVNL

by Palak
August 3, 2026
0

NLC India Renewables Limited (NIRL), a wholly-owned subsidiary of NLC India Limited, has received a letter of intent (LoI) from...

NLC India

NLC India Renewables Wins 900 MW Solar Project from GUVNL

by Palak
August 3, 2026
0

NLC India Renewables Limited, a wholly owned subsidiary of NLC India Limited, has received a letter of intent (LoI) from...

SECI

SECI Announces Winners of 4.455 MW Rooftop Solar Auction

by Palak
July 30, 2026
0

The Solar Energy Corporation of India Limited (SECI) has announced the winners for grid-connected rooftop solar project under the renewable...

LNK Energy

LNK Energy Secures Funding for Phase 1 of 6 GW Solar Manufacturing Facility

by Palak
July 30, 2026
0

LNK Energy has secured financial closure for phase 1 of its 6 GW integrated solar manufacturing facility in Maharashtra through...

Shweta Solar

Shweta Solar champions dependable after-sales support in rooftop solar

by Palak
July 27, 2026
0

New Delhi : Installing a rooftop solar system is only the beginning of a much longer journey. As more households...

Next Post
MERC

MERC Approves 5,991 MW Solar Procurement to Strengthen Renewable Energy in Maharashtra

Apraava Energy

Apraava Energy Secures ISTS Project via TBCB in Rajasthan

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

August 3, 2026
278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved