Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Power

Torrent Power to Develop 50 MW Solar Project for ARS Steels

editor by editor
July 10, 2024
in Power
Reading Time: 1 min read
0
Torrent Power
Share on FacebookShare on TwitterShare on Linkedin

Torrent Urja 14 (TU14), a subsidiary of Torrent Power will establish solar projects up to 50 MW to deliver clean energy to ARS Steels & Alloy International (ARS). Torrent Power, ARS, and TU14 have signed the subscription and shareholders’ agreement to supply power by developing solar power projects of up to 50 MWp in Tamil Nadu. This power will be provided through open access from TU14’s project to ARS’s production units. As per the agreement, ARS will also hold an equity stake in TU14.

In April 2024, by quoting Rs 3.65 per kWh, Torrent Power bagged the auction to procure power from 300 MW of wind-solar hybrid projects, with a greenshoe option of up to 150 MW from its own distribution unit, Torrent Power Distribution.

RELATED POSTS

U.S. Renewable Electricity Generation Surges 10%, Exceeds 30% Share

EODev and Baudouin partner on high-efficiency, distributed power generation

In March 2024, Torrent Power issued the letter of intent by PFC Consulting for the development of an inter-state transmission system (ISTS) to facilitate the power evacuation from 1,500 MW clean energy projects located in Solapur, Maharashtra.

Tags: ARS SteelssolarTorrent Power
ShareTweetShare
editor

editor

Related Posts

Renewable Energy

U.S. Renewable Electricity Generation Surges 10%, Exceeds 30% Share

by Palak
July 24, 2026
0

Washington DC – New data just released by the U.S. Energy Information Administration (EIA), and reviewed by the SUN DAY Campaign, reveal...

EODev and Baudouin

EODev and Baudouin partner on high-efficiency, distributed power generation

by Palak
July 22, 2026
0

The partnership will introduce solid oxide fuel cell (SOFC) technology to EODev's portfolio of clean, distributed and reliable power solutions,...

Tata Power

Tata Power Secures LoA for 324 MW Pumped Storage Project from SECI

by Palak
July 22, 2026
0

Tata Power Company Limited has received a letter of award (LoA) from the Solar Energy Corporation of India Limited (SECI)...

Rajesh Power

Rajesh Power Bags ₹343.7 Million Orders from PGVCL & RVPNL

by Palak
July 22, 2026
0

Rajesh Power Services Limited has secured orders worth Rs 343.7 million, including taxes, from Paschim Gujarat Vij Company Limited (PGVCL)...

Joint Solar

Joint Solar targets wider market opportunities as India’s power demand heads towards 300 GW

by Palak
July 20, 2026
0

New Delhi : India’s electricity requirements are increasing at a fast pace and the major year-on-year rise in demand cannot...

Next Post
Godrej Electricals

Godrej Electricals Successfully Launches 12.5 MWp Rooftop Solar Project

Inox Wind Secures 200 MW Contract for 3 MW Wind Turbines

Inox Wind Secures 200 MW Contract for 3 MW Wind Turbines

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

August 3, 2026
278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved