Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Power

Delhi Commission Releases Draft GEOA Regulations

editor by editor
June 17, 2024
in Power
Reading Time: 2 mins read
0
Delhi Electricity Regulatory Commission
Share on FacebookShare on TwitterShare on Linkedin

The Delhi Electricity Regulatory Commission (DERC) has announced the Draft Delhi Electricity Regulatory Commission (Terms and Conditions for Green Energy Open Access) Regulations, 2024. These regulations are designed to ensure non-discriminatory green energy open access (GEOA) through the intra-state transmission systems (InSTS) and the distribution networks of state licensees, including those related to inter-state electricity transmission. The draft specifies the method for calculating open access charges and banking charges for green energy consumers.

To be eligible, consumers must have a contracted demand or sanctioned load of minimum 100 kW. There are no capacity limitations for establishing renewable energy projects for captive use. The regulations mandate that consumers install suitable energy meters for energy accounting and ensure they have no outstanding dues with the relevant licensees.

RELATED POSTS

U.S. Renewable Electricity Generation Surges 10%, Exceeds 30% Share

EODev and Baudouin partner on high-efficiency, distributed power generation

The duration of the consumer’s usage of the InSTS and/or distribution system determines the category of consumers requesting open access. This includes (long-term – between 7 years and 25 years, medium-term – between three months to five years, short-term – for a month). Long-term access will be provided based on the transmission planning criteria and distribution planning code specified in the state grid code. While, requests for short- and medium-term access shall be granted if they can be met by making use of power flow variations, spare transmission and distribution system capacity, and inherent design margins intended for future load expansion.

Installing ABT-compliant meters at both the generator and consumer ends is required for customers requesting open access for 1 MW and higher. Those with demands below 1 MW are required to use special energy meters that can record energy in 15-minute time block.

With respect to banking, GEOA customers can bank minimum 30 per cent of their entire consumption of power during the billing period. Banking charges will be set at 8 per cent of the banked energy, deducted in kind. The energy banking will be allowed on a 15-minute time-block basis duration will span one month, after which any remaining unused energy will lapse. However, the renewable energy generating station will still be eligible to receive renewable energy certificates for this unused energy.

Additional charges encompass transmission and wheeling fees, cross-subsidy surcharges, additional surcharges, standby charges, and fees related to scheduling, deviation settlement, and meter reading. To ensure the payment of these charges, payment security mechanisms such as letters of credit or bank guarantees must be established.

Tags: Delhi CommissionDERCGEOAInSTS
ShareTweetShare
editor

editor

Related Posts

Renewable Energy

U.S. Renewable Electricity Generation Surges 10%, Exceeds 30% Share

by Palak
July 24, 2026
0

Washington DC – New data just released by the U.S. Energy Information Administration (EIA), and reviewed by the SUN DAY Campaign, reveal...

EODev and Baudouin

EODev and Baudouin partner on high-efficiency, distributed power generation

by Palak
July 22, 2026
0

The partnership will introduce solid oxide fuel cell (SOFC) technology to EODev's portfolio of clean, distributed and reliable power solutions,...

Tata Power

Tata Power Secures LoA for 324 MW Pumped Storage Project from SECI

by Palak
July 22, 2026
0

Tata Power Company Limited has received a letter of award (LoA) from the Solar Energy Corporation of India Limited (SECI)...

Rajesh Power

Rajesh Power Bags ₹343.7 Million Orders from PGVCL & RVPNL

by Palak
July 22, 2026
0

Rajesh Power Services Limited has secured orders worth Rs 343.7 million, including taxes, from Paschim Gujarat Vij Company Limited (PGVCL)...

Joint Solar

Joint Solar targets wider market opportunities as India’s power demand heads towards 300 GW

by Palak
July 20, 2026
0

New Delhi : India’s electricity requirements are increasing at a fast pace and the major year-on-year rise in demand cannot...

Next Post
UHV AC Line

SGCC Advances 1,000 kV Sichuan–Chongqing UHV AC Line Project

Solarpack

Solarpack Inks PPA with SJVNL for 482 MW Ganeko Hybrid Project

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

August 3, 2026
278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved