Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Tenders

THDC issues tender for 600 to 2,000 MW PSPs

editor by editor
May 16, 2024
in Tenders
Reading Time: 2 mins read
0
THDC issue Tenders
Share on FacebookShare on TwitterShare on Linkedin

THDC India has issued a request for proposals to set up 600 to 2,000 MW on stream or off-stream pumped storage projects (PSPs). To be developed on the basis of engineering, procurement, and construction model across various states of India, the projects will involve comprehensive operations and maintenance for a period of 15 years.

The tasks involved encompass site selection, conducting comprehensive studies and investigations, and preparing both preliminary feasibility reports and detailed project reports (DPR). The work also entail securing necessary regulatory approvals, establishing connections to the grid, and ensuring the efficient evacuation of power up to the pooling point. Furthermore, fundamental and comprehensive engineering, preparation of drawings, and obtaining approval, all guided by a design lifespan of 40 years with daily storage lasting 6 hours are also included in the work scope. The bidders are required to submit Rs 100 million as an earnest money deposit. The bidders can propose a minimum and maximum bid size of 600 MW and 2,000 MW, respectively. The bid submission deadline is May 13, 2024.

RELATED POSTS

RECPDCL floats tender for development of ISTS to evacuate 2 GW of solar power

Sembcorp Wins 150 MW FDRE Allocation in SJVN’s 6,000 MWh Tender

The projects are anticipated to be operational within five years from the issuance of the letter of award. This timeframe encompasses around 1.5 to 2 years for activities such as DPR preparation, land acquisition, studies, and comprehensive engineering. The projected duration for construction is estimated to be between 3 to 3.5 years.

Furthermore, the bidders have the option to qualify through one of three routes: Route 1 necessitates that the bidder be a developer of hydroelectric power plants or PSPs, with a combined minimum installed capacity of 200 MW. This must include minimum one project with a capacity of at least 50 MW, which should have been commissioned prior to the bid submission deadline. Route 2 requires that the bidder has provided, installed, and overseen designated electro-mechanical components for a hydroelectric or PSP within the past ten years. Route 3 stipulates that the bidder has either directly undertaken or had subcontractors carry out particular civil works for projects of this nature or other infrastructure projects within the past ten financial years.

Tags: electro-mechanicalPumped Storage ProjectstenderTHDC
ShareTweetShare
editor

editor

Related Posts

RECPDCL

RECPDCL floats tender for development of ISTS to evacuate 2 GW of solar power

by Palak
March 16, 2026
0

REC Power Development and Consultancy (RECPDCL) has issued a request for proposal (RfP) for the development of an intrastate transmission...

Sembcorp

Sembcorp Wins 150 MW FDRE Allocation in SJVN’s 6,000 MWh Tender

by Palak
November 12, 2025
0

Sembcorp Industries, through its subsidiary Sembcorp Green Infra, has secured a 150 MW firm and dispatchable renewable energy (FDRE) project...

RECPDCL

RECPDCL Floats Tender for Maharashtra Substation Project

by Palak
September 3, 2025
0

REC Power Development and Consultancy Limited (RECPDCL) has floated a tender to set up a 400/132 kV AIS substation in...

Solar Energy

Italy Launches €15.9 Million Tender to Boost Solar Energy Deployment

by Palak
August 8, 2025
0

Pavia Acque Scarl, the integrated water service company of Pavia city, has launched a €15.89 million tender for solar photovoltaic...

RECPDCL

RECPDCL Floats 3 GW ISTS Transmission Tender in Andhra Pradesh

by Palak
May 28, 2025
0

REC Power Development and Consultancy Limited (RECPDCL) has issued a request for proposal to develop an inter-state transmission system (ISTS)...

Next Post
ATUL PAI

Atul Pai Appointed as Managing Director of Honeywell Automation India Limited

Digital Last-Mile Platform Market

Digital Last-Mile Platform Market to Hit USD 21.7 Billion by 2031

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

August 3, 2026
278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved