Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Wind

Vestas secures order for 319 MW wind farm in Mexico

editor by editor
March 18, 2024
in Wind
Reading Time: 1 min read
0
vestas wind farm
Share on FacebookShare on TwitterShare on Linkedin

Sempra Infrastructure has placed a turbine order with Vestas for the development of the 319 MW Cimarron wind farm in Mexico. The Energia Sierra Juarez Wind Complex, which will have a 582 MW installed capacity overall, is currently in its third phase. The deal covers the delivery and deployment of 46 V163-4.5 MW turbines and 18 V162-6.2 MW turbines.

Furthermore, Vestas will also supply a 10-year service agreement (AOM 5000) at the end of the project, optimising energy production while ensuring long-term business case certainty for wind farm operations. Turbine delivery is scheduled for the fourth quarter of 2024, with commissioning expected in the fourth quarter of 2025.

RELATED POSTS

NTPC REL floats tender for the supply and installation of WTGs for 813 MW wind project

Terra Clean Floats Tender for 100 MW Wind Project in Gujarat

Earlier this month, Vestas confirmed a conditional agreement to provide turbines for Equinor’s 810 MW Empire Wind 1 project. This project was successfully rebid in New York’s fourth offshore wind auction in February 2024 and announced a conditional winner by the New York State Energy Research and Development Authority.

Tags: EnergyMexicoVestasWind
ShareTweetShare
editor

editor

Related Posts

NTPC Renewable Energy

NTPC REL floats tender for the supply and installation of WTGs for 813 MW wind project

by Palak
April 10, 2026
0

NTPC Renewable Energy Limited (NTPC REL) has issued a tender for the supply and installation of wind turbine generators (WTGs)...

Terra Clean

Terra Clean Floats Tender for 100 MW Wind Project in Gujarat

by Palak
March 25, 2026
0

According to the tender guidelines, the scope of work includes the development of the InSTS project and ten years of...

ACEN India

ACEN India raises Rs 7.52 billion for 100 MW wind project in Karnataka

by Palak
March 25, 2026
0

ACEN India, has raised Rs 7.52 billion from Mitsubishi UFJ Financial Group and Sumitomo Mitsui Banking Corporation. The financing has...

Suzlon Energy

Suzlon Energy Wins 100 MW Wind Project Order from GAIL India Limited

by Palak
March 25, 2026
0

Suzlon Group has secured an order for a 100 MW wind energy project from Gas Authority of India Limited (GAIL)....

KPI Green

KPI Green Raises ₹9.79 Billion for 150 MW Wind Project

by Palak
March 23, 2026
0

KPI Green Energy Limited has secured a financing sanction of Rs 9.79 billion from Canara Bank for development of its...

Next Post
Dr Abhilasha Gaur

Navigating a Career in ESDM: Tips for New Grads

Aviation

Aviation Lubricants Market Analysis

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Joint solar

Joint Solar sharpens focus on TOPCon and higher-efficiency solar modules

June 3, 2026
Shri V. Packirisamy

V. Packirisamy Appointed Director (Commercial) at Power Finance Corporation Limited

June 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • How proper refurbishment can extend life of pre-owned bikes in India?

    0 shares
    Share 0 Tweet 0
  • ACWA Power Signs Landmark $10 Billion Clean Energy Agreements

    0 shares
    Share 0 Tweet 0

Joint Solar sharpens focus on TOPCon and higher-efficiency solar modules

V. Packirisamy Appointed Director (Commercial) at Power Finance Corporation Limited

Sharika Enterprises Limited Enters SCADA-ADMS Market with Uttarakhand Grid Modernization Project

Cargill Launches Two-Year Livestock Development Initiative to Strengthen Maharashtra’s Dairy Sector

Flip Chip Technology Market Witnesses Rising Demand from Consumer Electronics Sector

Servotech Signs ₹400 Crore MoU for Haryana Manufacturing Expansion

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved