Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Tenders

NTPC issues tender for supply of modules for 1.2 GW solar project

editor by editor
January 27, 2024
in Tenders
Reading Time: 1 min read
0
NTPC Solar
Share on FacebookShare on TwitterShare on Linkedin

RELATED POSTS

Italy Launches €15.9 Million Tender to Boost Solar Energy Deployment

RECPDCL Floats 3 GW ISTS Transmission Tender in Andhra Pradesh

NTPC Renewable Energy Limited has issued a request for proposals to supply bifacial solar modules, of cumulative DC capacity of 1,515 MWp, (comprising four blocks, each with a capacity of 378.75 MWp) having wattage output of at least 540 Wp each, for 1,200 MW Khavda solar project, north block. The project will be located in Gujarat.

According to the tender guidelines, the scope of work under the project includes the production, provision, packaging, forwarding, and transportation of crystalline solar modules falling under the open category. NTPC REL plans to fund the project using its internal resources or by obtaining loans. The bid submission deadline is March 5, 2024.

To be eligible, the prospective bidders are required to possess a track record of delivering solar photovoltaic modules or cells with a cumulative capacity of 40 MW or above. Additionally, at least one of these supply orders must have been for a capacity exceeding 10 MW. This qualification criterion must be satisfied prior to the bid opening date. To showcase adherence to the technical qualification criteria, the bidder is required to provide a purchase order along with a client certificate confirming the successful fulfillment of the supply order. Alternatively, the bid submission should incorporate any other pertinent document that validates the satisfaction of the technical qualification criteria.

Tags: crystalline solarNTPCphotovoltaic modulesRenewable Energysolar
ShareTweetShare
editor

editor

Related Posts

Solar Energy

Italy Launches €15.9 Million Tender to Boost Solar Energy Deployment

by Palak
August 8, 2025
0

Pavia Acque Scarl, the integrated water service company of Pavia city, has launched a €15.89 million tender for solar photovoltaic...

RECPDCL

RECPDCL Floats 3 GW ISTS Transmission Tender in Andhra Pradesh

by Palak
May 28, 2025
0

REC Power Development and Consultancy Limited (RECPDCL) has issued a request for proposal to develop an inter-state transmission system (ISTS)...

KPTCL

KPTCL Awards 700 MWh in 1 GWh Battery Storage Tender

by Palak
April 9, 2025
0

Karnataka Power Transmission Corporation Limited (KPTCL) has announced the results of its 500 MW/1 GWh battery energy storage system (BESS)...

TNGECL

TNGECL Issues Tender for 1 GWh BESS with VGF Support

by Palak
March 18, 2025
0

Tamil Nadu Green Energy Corporation Limited (TNGECL) has initiated the bidding process for the development of six standalone battery energy...

NVVN

NVVN Issues Tender for 1,000 MWh BESS Project in Rajasthan

by Palak
March 3, 2025
0

NTPC Vidyut Vyapar Nigam Limited (NVVN) has invited proposals to develop standalone battery energy storage systems (BESS) with a total...

Next Post
CapitaLand India Trust

CapitaLand India Trust sets up captive solar power plant in TN

MNRE

MNRE introduces amended guidelines for implementation of PM-KUSUM scheme

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

VinFast

VinFast EV Plant Anchors Tamil Nadu’s Fourth Auto Cluster

August 18, 2025
ITM Power

ITM Power Signs Agreement for Hydrogen Project in the UK

August 18, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

VinFast EV Plant Anchors Tamil Nadu’s Fourth Auto Cluster

ITM Power Signs Agreement for Hydrogen Project in the UK

SWERL Wins EPC Contract from NTPC REL for 245 MW Solar Project

EV Adhesives Market Enabling Safer, Faster, and Smarter Electric Mobility

Offshore Wind Turbine Efficiency Market Projected to Hit $18.7 Billion by 2033

Innovations Driving Growth in the Fire Pump Market

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved