Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Wind

Nordex Group Received Orders for 33 MW from RWE

Urja Daily by Urja Daily
March 11, 2021
in Wind
Reading Time: 1 min read
0
wind farm
Share on FacebookShare on TwitterShare on Linkedin

Hamburg, The Nordex Group has again received orders from France. The French subsidiary from RWE, RWE Renouvelables France, has ordered ten N117 turbines for two wind farms with a total capacity of 33 MW. Both projects in the north of France are part from the sale of Nordex Group’s European wind and solar project development business to RWE in November 2020.

The Nordex Group is supplying six N117/3000 turbines on tubular steel towers with hub heights of 76 metres for the 18 MW onshore wind farm “Les Hauts Bouleaux” in the Oise Department. The 15 MW “Martinpuich” wind farm in the Pas-de-Calais department will be equipped with four N117/3600 turbines with hub height of 91 metres, which are delivered in the operation mode of 3.675 MW. Installation of the turbines will start in the current year and the commissioning of the turbines in both wind farms is scheduled for early 2022.

RELATED POSTS

Powerica and K.P. Energy Sign PPAs for 100 MW Wind Projects with GUVNL

Vietnam Unveils New Legal Framework for Offshore Wind Development

The orders also include a premium service contract of the turbines. Due to the location of the wind farms, the Nordex Group benefits from the already strong network of service points in the north of France.

ShareTweetShare
Urja Daily

Urja Daily

Related Posts

KP Energy Limited

Powerica and K.P. Energy Sign PPAs for 100 MW Wind Projects with GUVNL

by Palak
August 6, 2026
0

Powerica Limited and K.P. Energy Limited have signed separate power purchase agreements (PPAs) with Gujarat Urja Vikas Nigam Limited (GUVNL)...

Wind

Vietnam Unveils New Legal Framework for Offshore Wind Development

by Palak
July 24, 2026
0

The Government of Vietnam has issued Decree 272/2026, introducing a new legal framework to support the development of offshore wind...

Wind

Vietnam issues new legal framework for offshore wind development

by Palak
July 23, 2026
0

The Government of Vietnam has issued Decree 272/2026, introducing a new legal framework to support the development of offshore wind...

Eurowind Energy

Eurowind Energy Romania Begins Construction of 138 MW Wind Projects

by Palak
July 22, 2026
0

Eurowind Energy Romania has commenced construction of three wind power projects, following the receipt of setting-up authorisations from the National...

SECI

SECI floats tender for 45.6 MW wind project in Andhra Pradesh

by Palak
July 20, 2026
0

The Solar Energy Corporation of India Limited (SECI) has invited bids for the design, engineering, supply, and construction of a...

Next Post
LG Energy Solution

LG Energy Solution Expand $4.5 Bn in U.S. Battery Business by 2025

GE wind farm

GE Plans to Open New Offshore Wind Blade Manufacturing Plant in Teesside, UK

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

CGSSC

CGSSC and Tata Consulting Engineers Launch Project UTKARSH to Build Manufacturing Industry-Ready Workforce

August 6, 2026

From Rising Power Costs to Energy Independence: Why Companies Are Accelerating Solar Adoption

August 6, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

CGSSC and Tata Consulting Engineers Launch Project UTKARSH to Build Manufacturing Industry-Ready Workforce

From Rising Power Costs to Energy Independence: Why Companies Are Accelerating Solar Adoption

Walplast Products Receives GreenPro Ecolabel Certification for Five HomeSure GypEx Gypsum Products

Bluebird Solar secures 278 MW solar module supply order for SJVN projects

CEFC Commits $100 Million for Renewables

Ola Electric signs battery storage agreement with Axis Energy

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved