Stakeholders Consultation Meeting: Tender for the Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 5 MW(AC) grid connected saffron based Agro-Solar PV Power Plant with 10 years O&M at Pampore, Pulwama, J&K, India.

SECI is organizing a Stakeholders Consultation Meeting regarding its upcoming project for the Tender for the Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 5 MW(AC) grid connected saffron based Agro-Solar PV Power Plant with 10 years O&M at Pampore, Pulwama, J&K, India. The meeting shall be conducted online as per the details mentioned below:

please join the meeting at 11.03.2022, 1200 Hours, India Standard Time (UTC+5:30), by clicking on this link:

https://teams.microsoft.com/l/meetup-join/19%3a3qD7IeFHfxf79PYzJLvKHscDZemoujQ5OVR8i6TQEL01%40thread.tacv2/1646893269280?context=%7b%22Tid%22%3a%22a24b3e19-3a1f-4c61-9f1e-cace38462ab7%22%2c%22Oid%22%3a%225164b124-35cd-46f3-97d9-6f9cc331e98c%22%7d

The purpose of the conversation is to inform the various stakeholders about the Solar Project and the innovation associated with it. Prospective bidders are kindly requested to make themselves available online for the said meeting as per the above-mentioned schedule. Maximum 02 (Two) persons from the respective Bidder company are allowed to attend the Meeting.

Prospective bidders are required to send in their confirmation mail at umesh.patidar@seci.co.in & priyank.j@seci.co.in to attend the Stakeholders Consultation Meeting latest by today.

Bidders are required to kindly be updated through SECIs website www.seci.co.in for any further updates regarding this Stakeholders meeting.

Previous articleTender for the Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 100 MW (AC) Floating Solar PV Project having 10 years plant O&M at Getalsud Dam, Ranchi, Jharkhand, India
Next articleEV ecosystem platform startup Pi Beam Electric raises $1.7mn

LEAVE A REPLY

Please enter your comment!
Please enter your name here