Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Tenders

Tender for 20 MW (AC) Solar PV Power Plant (50 MWp DC) with 20 MW / 50 MWh BESS

Urja Daily by Urja Daily
March 8, 2021
in Tenders
Reading Time: 2 mins read
0
Solar PV Power Plant
Share on FacebookShare on TwitterShare on Linkedin

Clarifications regarding Land: Tender for 20 MW (AC) Solar PV Power Plant (50 MWp DC) with 20 MW / 50 MWh BESS at Phyang, Leh, UT of Ladakh, India

Employer: Solar Energy Corporation of India Limited (SECI), New Delhi, India

RELATED POSTS

RECPDCL Floats 3 GW ISTS Transmission Tender in Andhra Pradesh

KPTCL Awards 700 MWh in 1 GWh Battery Storage Tender

Tender title: Design, Engineering, Supply, Construction, Erection, Testing, Commissioning and O&M of 20 MW (AC) Solar PV Power Plant (50 MWp DC) with 20 MW / 50 MWh Battery Energy Storage System having 10 years plant O&M at Phyang, Leh, UT of Ladakh, India

Tender No: SECI/C&P/TD/2020/LEH/20S/20B

Tender Search Code (TSC) for the RfB: SECI-2020-TN0000029

Bidders are required to note that the total land area available for the project is around 313 acres against 217 acres earlier mentioned in the RfS. The entire land area is contiguous and shall be considered as the plot boundary for the scope of works as per the RfS document. Submitted for the clarifications to prospective bidders.

Land Coordinates are attached along with this notification for reference purpose, however the complete details are uploaded at https://www.bharat-electronictender.com

‘Click Here To See Files’

Tags: SECISolar PV Power Planttender
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

RECPDCL

RECPDCL Floats 3 GW ISTS Transmission Tender in Andhra Pradesh

by Palak
May 28, 2025
0

REC Power Development and Consultancy Limited (RECPDCL) has issued a request for proposal to develop an inter-state transmission system (ISTS)...

KPTCL

KPTCL Awards 700 MWh in 1 GWh Battery Storage Tender

by Palak
April 9, 2025
0

Karnataka Power Transmission Corporation Limited (KPTCL) has announced the results of its 500 MW/1 GWh battery energy storage system (BESS)...

TNGECL

TNGECL Issues Tender for 1 GWh BESS with VGF Support

by Palak
March 18, 2025
0

Tamil Nadu Green Energy Corporation Limited (TNGECL) has initiated the bidding process for the development of six standalone battery energy...

NVVN

NVVN Issues Tender for 1,000 MWh BESS Project in Rajasthan

by Palak
March 3, 2025
0

NTPC Vidyut Vyapar Nigam Limited (NVVN) has invited proposals to develop standalone battery energy storage systems (BESS) with a total...

TGGENCO

TGGENCO Launches Tender for 250 MW/500 MWh BESS Project

by Urja Daily
January 27, 2025
0

Telangana Power Generation Corporation (TGGENCO) has issued a tender to develop a pilot project for a standalone battery energy storage...

Next Post
solar power plants

ADB Approved Loan $27 Mn to Establish Kom Ombo Solar Power Plant : Egypt

Electric vehicle changing

Mobilising Electric Vehicle Financing in India

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

EV Adoption Accelerates

Key Growth Drivers of the U.S. Charging-as-a-Service Market

June 27, 2025
Sustain Labs Paris

Sustain Labs Paris Unveils 2025 Climate Leaders Cohort with 47% Indian Representation

June 27, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

Key Growth Drivers of the U.S. Charging-as-a-Service Market

Sustain Labs Paris Unveils 2025 Climate Leaders Cohort with 47% Indian Representation

THDCIL to Supply 184.08 MW Clean Power to Gujarat from Tehri PSP

PLI, EVs, and Skill Development Key to India’s Auto Future: Dr. Qureshi at ASDC Event

AXITEC Energy Strengthens South India Presence with Alphadex Dealership in Karnataka

Top 5 Emerging Opportunities in the LDPE Market

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved