Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Batteries
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Batteries
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable

SSE Partners with Fluence, OCU Energy for UK BESS Project

editor by editor
March 11, 2024
in Renewable
Reading Time: 1 min read
0
OCU Energy
Share on FacebookShare on TwitterShare on Linkedin

SSE Renewables has announced the principal contractor and system supplier for its battery-based energy storage project at Fiddler’s Ferry, Warrington. Fluence has been selected as the supplier of the battery-based energy storage system to SSE. The project will utilise the Gridstack platform, proven for its industry leading safety and reliability.

Furthermore, construction is set to begin at the site in the coming weeks after SSE Renewables took a final investment decision in December 2023. OCU Energy will be the principal contractor at Fiddler’s Ferry. The 150 MW / 300 MWh battery storage project is situated at the site of the former SSE-owned coal-fired power station at Fiddler’s Ferry.

RELATED POSTS

Renewables Resilience: July Data Shows Growth Amidst Anti-Clean Energy Bills

Jakson Group Hosts Sri Lanka and Maldives Officials for Solar Partnership Talks

Reportedly, the power station was decommissioned in March 2020, and the final demolition of its cooling towers came at the end of last year. Once operational, the system will be capable of storing power for release back to the UK National Grid when needed, helping to manage peaks of energy demand.

Tags: BatteryInvestmentpowerRenewablesSSE PartnersStorage System
ShareTweetShare
editor

editor

Related Posts

Renewables

Renewables Resilience: July Data Shows Growth Amidst Anti-Clean Energy Bills

by Palak
September 24, 2025
0

Washington DC – A review by the SUN DAY Campaign of data just released by the U.S. Energy Information Administration (EIA)...

Jakson Plant

Jakson Group Hosts Sri Lanka and Maldives Officials for Solar Partnership Talks

by Palak
September 24, 2025
0

Delhi NCR, India : The Hon’ble (Eng.) Kumara Jayakody, Minister of Energy, Government of Sri Lanka and Mr. Muaviyath Mohamed, Minister...

Ozone

How Ozone Generators Are Transforming Water and Air Purification?

by Palak
September 23, 2025
0

Rising Awareness of Clean Air and Safe Water Air quality concerns and water safety are among the most pressing challenges...

Goldi Solar

Goldi Solar Unveils World’s Largest Solar Module to Commemorate PM Modi’s 75th Birthday

by Palak
September 22, 2025
0

Surat, Gujarat, India - In a grand gesture marking the 75th birthday of the Hon’ble Prime Minister Shri Narendra Modi,...

Servotech Renewable Power System Ltd.

Servotech Renewable Power System Ltd. Bags 1.2 MW Rooftop Solar Project from Northern Railway Moradabad Division

by Palak
September 18, 2025
0

New Delhi : Servotech Renewable Power System Ltd. is proud to announce that it has bagged a 1.2 MW grid-connected...

Next Post
StoreDot

StoreDot Partners with EVE Energy for Fast Charging Batteries

NTPC Green Energy Limited

NTPC Signs MoU with RRVUNL for Renewable Energy and Green Hydrogen Projects

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

BPCL

BPCL Kochi Refinery Celebrates 60 Years, Charts Sustainable Path Forward

September 29, 2025
Montra Electric

Montra Electric Unveils Rhino 5538 EV & New Automated Battery Facility

September 29, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

BPCL Kochi Refinery Celebrates 60 Years, Charts Sustainable Path Forward

Montra Electric Unveils Rhino 5538 EV & New Automated Battery Facility

VinFast Expands into Hyderabad with Dual Showroom Launch

India Can Lead in Semiconductor Innovation, If We Skill Right

Samsung and Videotex Partner to Expand Tizen OS TVs in India

Mitsubishi Electric Launches KEGMIL to Streamline Elevator and Escalator Service Management

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Batteries
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved