Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Tenders

SECI Issued RfS for Setting up of 1200 MW ISTS-Connected Wind Power projects in India (Tranche-X)

Urja Daily by Urja Daily
December 23, 2020
in Tenders, Wind
Reading Time: 2 mins read
0
Wind Energy
Share on FacebookShare on TwitterShare on Linkedin

The Solar Energy Corporation of India (SECI) has issued a Request for Selection (RfS) for the selection of wind power developers (WPD) for setting up of 1200 MW ISTS-connected wind power projects in India (Tranche-X).

The RfS for 1200 MW ISTS-conencted Wind Power Projects in India (Tranche-X) under Tariff-based competitive bidding has been issued under the Standard Bidding Guidelines.

RELATED POSTS

WestWind Energy Gets Approval for 122 MW Australian Wind Project

Powerica and K.P. Energy Sign PPAs for 100 MW Wind Projects with GUVNL

As per the RfS, already commissioned projects cannot be considered under this RfS. Projects under construction or projects which are not yet commissioned will, however, be considered, in case these projects are not already accepted under any other Central or State Schemes. Enhancement and augmentation of already commissioned Projects, irrespective of their capacities will not be considered as eligible projects under this scheme.

Date of pre-bid meeting (to be conducted online): 8th January, 2021 (2:30 PM IST)

Last date of bid submission: 5th February, 2021 (6:00 PM IST).

Prospective bidders are requested to remain updated for any notices/ amendments/ clarifications etc. to the RfS documents through the websites www.seci.co.in and https://www.bharat-electronictender.com as no separate notification will be issued.

Tender Search Code (TSC) for the RfS in ISN-ETS : SECI-2020-TN000027

Tender ID for the RfS in CPPP : 2020_SECI_578536_1

To Read full document click here

Also the detailed RfS document has been uploaded on https://www.bharat-electronictender.com (Only viewed on Microsoft Internet explorer 10.x or above browser), CPPP Portal https://eprocure.gov.in and under “Tenders” Section on SECI’s Website www.seci.co.in. Prospective bidders are requested to refer to ISN-ETS, CPPP and SECI websites for details.

Tags: 1200 MW ISTS-Connected Wind Power projectsSECI
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

WestWind Energy

WestWind Energy Gets Approval for 122 MW Australian Wind Project

by Palak
August 18, 2026
0

WestWind Energy has received planning approval for the Normanville Energy Park. The park will consist of a 122 MW wind...

KP Energy Limited

Powerica and K.P. Energy Sign PPAs for 100 MW Wind Projects with GUVNL

by Palak
August 6, 2026
0

Powerica Limited and K.P. Energy Limited have signed separate power purchase agreements (PPAs) with Gujarat Urja Vikas Nigam Limited (GUVNL)...

Wind

Vietnam Unveils New Legal Framework for Offshore Wind Development

by Palak
July 24, 2026
0

The Government of Vietnam has issued Decree 272/2026, introducing a new legal framework to support the development of offshore wind...

Wind

Vietnam issues new legal framework for offshore wind development

by Palak
July 23, 2026
0

The Government of Vietnam has issued Decree 272/2026, introducing a new legal framework to support the development of offshore wind...

Eurowind Energy

Eurowind Energy Romania Begins Construction of 138 MW Wind Projects

by Palak
July 22, 2026
0

Eurowind Energy Romania has commenced construction of three wind power projects, following the receipt of setting-up authorisations from the National...

Next Post
Bird Energy

DOE and MoE selected received $7.15 million BIRD Energy program

RENESOLA POWER

ReneSola announced entered securities purchase agreements with several institutional investors

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Offshore Wind

Off-Grid Energy Storage Market to Hit $10.75 Billion by 2033

August 18, 2026
Solar Windows Market

Solar Windows Market Growth Fueled by Renewable Energy Adoption

August 18, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Off-Grid Energy Storage Market to Hit $10.75 Billion by 2033

Solar Windows Market Growth Fueled by Renewable Energy Adoption

WestWind Energy Gets Approval for 122 MW Australian Wind Project

Philippines Begins 41 MWp Solar-53 MWh BESS Project

KPI Green Energy commissions 130 MW solar capacity in Gujarat

Saatvik Solar to establish 3.6 GW solar cell manufacturing facility in Odisha  

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved