Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

Schneider Electric Releases Compact 3-Phase UPS: Galaxy VL

Urja Daily by Urja Daily
April 14, 2021
in News
Reading Time: 3 mins read
0
schneider electic
Share on FacebookShare on TwitterShare on Linkedin

Schneider Electric, the leader in digital transformation of energy management and automation, today announced the global launch of the Galaxy VL 200-500 kW (400V/480V) 3-phase uninterruptible power supply (UPS), the newest addition to the Galaxy family.

Available worldwide, this highly efficient, compact UPS offers up to 99-percent efficiency in ECOnversion™ mode for a full return on investment within two years (model dependent) for medium and large data centres and commercial and industrial facilities. A live, virtual “hands-on” event for data centre professionals and partners will take place May 4 to demonstrate Galaxy VL’s capabilities and features from Schneider Electric’s Innovation Executive Briefing Centre.

RELATED POSTS

WIKA India to Showcase Intelligent Instrumentation and IIoT Solutions at Automation Expo 2026 Mumbai, Maharashtra

KP Green Engineering Limited Secures ₹2.39 Billion Orders Across Multiple Business Segments

With data centre floor space at a premium, the compact design of the Galaxy VL is half the size of the industry average at .8 m2. Its modular and scalable architecture enables data centre professionals to scale power incrementally, from 200 kW to 500 kW with 50 kW power modules, providing flexibility to grow as their business demands.

With Galaxy VL, Schneider Electric introduces Live Swap, a pioneering feature which delivers a touch-safe design throughout the process of adding or replacing the power modules while the UPS is online and fully operational, offering enhanced business continuity and no unscheduled downtime. Additionally, Live Swap‘s touch safe design offers increased protection for employees who no longer have to transfer the UPS to maintenance bypass or battery operation during the insertion or removal of the power modules.

“The new, energy-efficient Galaxy VL sets a very high standard for UPS innovation and is designed to help our customers grow while minimizing footprint and cost of ownership,” said Mustafa Demirkol, VP, 3-Phase Global Offer Management for Schneider Electric. “It is in keeping of our focus on the future requirements for data centres and meeting the demands for adaptability, resiliency, efficiency, and sustainability. The newest addition to the Galaxy family is a Green Premium product that delivers top performance, supports sustainability objectives, and fills a previous gap in the market for the midrange power segment.”

Key Benefits of the new Galaxy VL:· Maximize space to enable future growth: Galaxy VL is the most compact in its class, 50-percent more compact than the industry average at.8 m2, freeing up valuable data centre real estate and IT space. Additionally, Galaxy Lithium-ion Battery Cabinets deliver total space savings of up to 70 percent compared with VRLA battery solutions.1

  • Save money: Galaxy VL’s modular, scalable platform enables you to pay-as-you-grow, reducing CapEx investment, operating costs, energy consumption, and TCO. Scale power instantly in 50 kW increments from 200 to 500 kW with no extra footprint.
  • Reach sustainability goals: Up to 99-percent efficient in ECOnversion mode for a full return on investment within two years in energy savings (26,280 EUR annual electricity savings).2 A Schneider Electric Green Premium product, it includes the option for long-lasting Lithium-ion batteries.
  • Increased Reliability through EcoStruxure3: By connecting Galaxy VL to EcoStruxure—Schneider Electric’s open, interoperable, IoT-enabled system architecture and platform—data centre operators can benefit from EcoStruxure™ IT software and services. These EcoStruxure offerings enable customers to monitor, manage, and model their IT infrastructure and get service support 24/7 anywhere, anytime.

The Galaxy VL is available worldwide and can be purchased direct from Schneider Electric. Visit this web page for details.

1 SE calculation based on available market product information. See Galaxy VL brochure for details.

2 Based on a market electricity price: €0.11/kWh. The annual electricity savings are done in comparison with a 94% efficiency standard UPS.

3 Country dependent. Contact your local representative for availability. Subject to terms and conditions.

Register for May 4 Galaxy VL virtual event

To provide a live, up close, “hands-on” experience, Schneider Electric will be hosting a virtual event open to end users, partners, and press from the Schneider Electric Innovation Executive Briefing Centre. Experts will demonstrate the Galaxy VL’s features and discuss its benefits and how data centre operators can prepare themselves for future growth.

Tags: Galaxy VLSchneider Electric
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Automation Expo 2026 Invite

WIKA India to Showcase Intelligent Instrumentation and IIoT Solutions at Automation Expo 2026 Mumbai, Maharashtra

by Palak
July 14, 2026
0

Mumbai : WIKA India will showcase its latest intelligent instrumentation and Industrial Internet of Things (IIoT) technologies at Automation Expo 2026,...

KPI Green

KP Green Engineering Limited Secures ₹2.39 Billion Orders Across Multiple Business Segments

by Palak
July 14, 2026
0

KP Green Engineering Limited has secured orders worth Rs 2.39 billion from multiple clients across its transmission, solar and infrastructure...

Thailand

Thailand Approves $1.99 Billion Investment in AI, Data Centres and Clean Energy

by Palak
July 14, 2026
0

Thailand’s Board of Investment (BOI) has approved USD1.99 billion (THB66.3 billion) in new investments, primarily targeting artificial intelligence (AI), advanced...

HCC and Konstelec Engineers

Hindustan Construction Company Limited and Konstelec Engineers Limited Form JV for Nuclear Infrastructure Projects

by Palak
July 10, 2026
0

Hindustan Construction Company (HCC) and Konstelec Engineers Limited have entered into a joint venture (JV) to jointly bid for and...

Dr Ian Cambell

Breathe Battery Technologies’ Dr Ian Campbell Presented with Princess Royal Silver Medal

by Palak
July 10, 2026
0

London – Dr Ian Campbell, co-founder of Breathe Battery Technologies, was presented with The Princess Royal Silver Medal last night by HRH...

Next Post
Kabira Mobility Launches Hermes 75, High-speed Commercial Delivery E-Scooter

Kabira Mobility Launches Hermes 75, High-speed Commercial Delivery E-Scooter

EVLOMO and OR launch First DC Fast charging station

EVLOMO and OR Launch First DC Fast Charging Station

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Automation Expo 2026 Invite

WIKA India to Showcase Intelligent Instrumentation and IIoT Solutions at Automation Expo 2026 Mumbai, Maharashtra

July 14, 2026
POWERGRID

POWERGRID secures LoI for ISTS augmentation project under TBCB

July 14, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0

WIKA India to Showcase Intelligent Instrumentation and IIoT Solutions at Automation Expo 2026 Mumbai, Maharashtra

POWERGRID secures LoI for ISTS augmentation project under TBCB

JSW Energy arm bags Rs 4.4 billion BESS order from Bondada Engineering

KP Green Engineering Limited Secures ₹2.39 Billion Orders Across Multiple Business Segments

SAEL bags solar module supply order from NTPC REL

Thailand Approves $1.99 Billion Investment in AI, Data Centres and Clean Energy

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved