Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

MNRE has issued Guidelines for Procuring Power From Solar Projects

Urja Daily by Urja Daily
October 8, 2020
in News
Reading Time: 2 mins read
0
MNRE has issued Guidelines for Procuring Power From Solar Projects
Share on FacebookShare on TwitterShare on Linkedin

MNRE has issued amendments to the guidelines for the tariff-based bidding process for the procurement of power from grid-tied solar projects.

The Ministry of New and Renewable Energy (MNRE), in a gazette notification, has issued amendments to the guidelines for ‘Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected Solar PV Power Projects

RELATED POSTS

WOTR’s FarmPrecise App Hits 1 Lakh+ Downloads, Cuts Costs by 20%

Walplast Launches “Nova 125” Premium Gypsum Plaster for Superior Coverage and Performance

The successful bidder, if being a single company or consortium, shall ensure that its/ their shareholding in the SPV/project company executing the PPA shall not fall below 51 percent at any time prior to 1 year from the COD [earlier 3 years], except with the prior approval of the Procurer. Further, the successful bidder shall ensure that its promoters shall not cede control2 of the bidding company/ consortium till 1 year [earlier 3 years] from the COD, except with the prior approval of the Procurer. In this case, it shall also be essential that the successful bidder shall provide the information about its promoters and their shareholding to the Procurer before signing of the PPA with the Procurer.

Quantum of Earnest Money Deposit (EMD)

Quantum of the EMD in the form of a bank guarantee/ letter of undertaking to pay/ payment of order instrument, [earlier only bank guarantee] to be furnished by the bidders. The EMD shall stand forfeited in the event of failure of the Solar Power Generator to execute the PPA within the stipulated time period.

Guarantees

The Solar Power Generator shall provide the following guarantees to the Procurer in terms of the RfS and the PPA:

Earnest Money Deposit (EMD), to be fixed by the Procurer, [but not to be more than 2 percent of the estimated capital cost of the solar PV power project cost, as determined by CERC, if any, for the financial year in which the bids are invited or the estimated project cost], to be submitted

In its new amendments, the Ministry has mentioned that “these Letter(s) will have the same effect as that of a Bank Guarantee issued by any public sector bank. Such “Payment on Order instrument” would have terms and conditions similar to that of any Bank Guarantee given by any public sector bank and would promise to pay the Procurer on-demand within the stipulated time. Solar power generators can seek such Letters(s) by offering due security to the above mentioned three non-banking financial institutions mentioned above (IREDA, PFC & REC). Procurer(s) shall not accept the instrument of ‘Letter of Undertaking’ as described above or in any other form, from any other non-banking financial institutions or bank, except IREDA, PFC & REC.”

These letter(s) will also be accepted as Performance Bank Guarantee(s). And hence, the ministry has stated that Performance Bank Guarantee (PBG) wherever mentioned in the bidding process guidelines shall be referred to as Performance Guarantee (PG) in the form of Bank Guarantee or alternatives provided thereto as per these Guidelines.

Tags: Bank Guaranteebidding processEMDGuidelinesIndiaMNREMNRE Guidelines Solar PowerSolar EnergySolar Power
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Watershed Organisation Trust

WOTR’s FarmPrecise App Hits 1 Lakh+ Downloads, Cuts Costs by 20%

by Palak
August 13, 2025
0

Pune : The Watershed Organisation Trust (WOTR) has achieved a significant milestone with its digital advisory platform, FarmPrecise. The app has...

Walplast

Walplast Launches “Nova 125” Premium Gypsum Plaster for Superior Coverage and Performance

by Palak
August 13, 2025
0

Mumbai : Walplast Products Pvt. Ltd., has officially entered the premium gypsum category with the launch of Nova 125 - Premium Gypsum...

Stellantis India

Stellantis India Unveils Dual-Brand Retail Outlet in Ahmedabad to Expand Gujarat Presence

by Palak
August 12, 2025
0

Second Stellantis Brand House in Gujarat, following the Surat launch Full portfolio of both brands available, supported by advanced diagnostics...

Rajasthan Govt

Rajasthan Govt Approves Land Allocation for 765 kV Substation in Jaisalmer

by Palak
August 11, 2025
0

The Rajasthan government has approved land allocation for a 765 kV power substation to be developed at Phusasar village in...

Reliance Infrastructure

Reliance Infrastructure’s Discoms to Recover $2.44 Billion in Pending Dues

by Palak
August 11, 2025
0

Reportedly, Reliance Infrastructure Limited’s power distribution companies are set to recover USD2.44 billion in dues as the Supreme Court of...

Next Post
Tata-Steel-to-Collaborate-with-CSIR-to-Deploy-Decarbonization-Technologies

Tata Steel to Collaborate with CSIR to Deploy Decarbonization Technologies

Floating-Solar-in-Hydropower-Projects-Could-Generate-7.6-TW-of-Energy-Annually

Floating Solar in Hydropower Projects Could Generate 7.6 TW of Energy Annually

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Montra Electric

Montra Electric Opens e-SCV Dealership in Coimbatore in Partnership with TVS Vehicle Mobility Solution

August 14, 2025
Watershed Organisation Trust

WOTR’s FarmPrecise App Hits 1 Lakh+ Downloads, Cuts Costs by 20%

August 13, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

Montra Electric Opens e-SCV Dealership in Coimbatore in Partnership with TVS Vehicle Mobility Solution

WOTR’s FarmPrecise App Hits 1 Lakh+ Downloads, Cuts Costs by 20%

Decarbonization Targets Driving Transformation in the Iron Ore Pellets Market

Euler Motors and Magenta Mobility clock 2 Crore EV kilometres, cut 1,700+ tons of CO₂ emissions

Walplast Launches “Nova 125” Premium Gypsum Plaster for Superior Coverage and Performance

Walplast’s HomeSure MasterTouch WaterLock Sees Strong First-Year Growth

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved