Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

MNRE has issued Guidelines for Procuring Power From Solar Projects

Urja Daily by Urja Daily
October 8, 2020
in News
Reading Time: 2 mins read
0
MNRE has issued Guidelines for Procuring Power From Solar Projects
Share on FacebookShare on TwitterShare on Linkedin

MNRE has issued amendments to the guidelines for the tariff-based bidding process for the procurement of power from grid-tied solar projects.

The Ministry of New and Renewable Energy (MNRE), in a gazette notification, has issued amendments to the guidelines for ‘Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected Solar PV Power Projects

RELATED POSTS

PwC India Opens Sixth NCR Office with New Gurugram Facility

Is the World Ready for Driverless Cars? Consumer Sentiment and Self-Driving Cars Market Potential

The successful bidder, if being a single company or consortium, shall ensure that its/ their shareholding in the SPV/project company executing the PPA shall not fall below 51 percent at any time prior to 1 year from the COD [earlier 3 years], except with the prior approval of the Procurer. Further, the successful bidder shall ensure that its promoters shall not cede control2 of the bidding company/ consortium till 1 year [earlier 3 years] from the COD, except with the prior approval of the Procurer. In this case, it shall also be essential that the successful bidder shall provide the information about its promoters and their shareholding to the Procurer before signing of the PPA with the Procurer.

Quantum of Earnest Money Deposit (EMD)

Quantum of the EMD in the form of a bank guarantee/ letter of undertaking to pay/ payment of order instrument, [earlier only bank guarantee] to be furnished by the bidders. The EMD shall stand forfeited in the event of failure of the Solar Power Generator to execute the PPA within the stipulated time period.

Guarantees

The Solar Power Generator shall provide the following guarantees to the Procurer in terms of the RfS and the PPA:

Earnest Money Deposit (EMD), to be fixed by the Procurer, [but not to be more than 2 percent of the estimated capital cost of the solar PV power project cost, as determined by CERC, if any, for the financial year in which the bids are invited or the estimated project cost], to be submitted

In its new amendments, the Ministry has mentioned that “these Letter(s) will have the same effect as that of a Bank Guarantee issued by any public sector bank. Such “Payment on Order instrument” would have terms and conditions similar to that of any Bank Guarantee given by any public sector bank and would promise to pay the Procurer on-demand within the stipulated time. Solar power generators can seek such Letters(s) by offering due security to the above mentioned three non-banking financial institutions mentioned above (IREDA, PFC & REC). Procurer(s) shall not accept the instrument of ‘Letter of Undertaking’ as described above or in any other form, from any other non-banking financial institutions or bank, except IREDA, PFC & REC.”

These letter(s) will also be accepted as Performance Bank Guarantee(s). And hence, the ministry has stated that Performance Bank Guarantee (PBG) wherever mentioned in the bidding process guidelines shall be referred to as Performance Guarantee (PG) in the form of Bank Guarantee or alternatives provided thereto as per these Guidelines.

Tags: Bank Guaranteebidding processEMDGuidelinesIndiaMNREMNRE Guidelines Solar PowerSolar EnergySolar Power
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

PwC India

PwC India Opens Sixth NCR Office with New Gurugram Facility

by Palak
July 24, 2025
0

Tuesday – PwC India today announced the opening of its new office in DLF Downtown 4, Gurugram - its sixth facility in...

Self-driving Cars Market

Is the World Ready for Driverless Cars? Consumer Sentiment and Self-Driving Cars Market Potential

by Palak
July 24, 2025
0

The concept of self-driving cars has long fascinated the world, and in the last decade, this once-futuristic vision has begun...

STMicroelectronics

STMicroelectronics Reports 2025 Second Quarter Financial Results

by Palak
July 24, 2025
0

Q2 net revenues $2.77 billion; gross margin 33.5%; operating loss of $133 million, including $190 million related to impairment, restructuring...

Sharika Enterprises

Sharika Enterprises to Automate BMM Ispat Power with SCADA

by Palak
July 22, 2025
0

New Delhi : Sharika Enterprises Limited has secured a landmark SCADA automation contract from QMeasure Technologies for the Hosapete (Danapur)...

PackPlus 2025

PackPlus 2025 to Showcase India’s Packaging Strength in Delhi

by Palak
July 18, 2025
0

New Delhi - The 19th edition of PackPlus, India’s leading packaging industry event, is slated to take place from July 31...

Next Post
Tata-Steel-to-Collaborate-with-CSIR-to-Deploy-Decarbonization-Technologies

Tata Steel to Collaborate with CSIR to Deploy Decarbonization Technologies

Floating-Solar-in-Hydropower-Projects-Could-Generate-7.6-TW-of-Energy-Annually

Floating Solar in Hydropower Projects Could Generate 7.6 TW of Energy Annually

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Wastewater treatment plants

Turn Up the Heat Next Winter with Better Biogas Production!

July 24, 2025
PwC India

PwC India Opens Sixth NCR Office with New Gurugram Facility

July 24, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

Turn Up the Heat Next Winter with Better Biogas Production!

PwC India Opens Sixth NCR Office with New Gurugram Facility

Is the World Ready for Driverless Cars? Consumer Sentiment and Self-Driving Cars Market Potential

STMicroelectronics Reports 2025 Second Quarter Financial Results

Key Hurdles Slowing Electric Cargo Bike Adoption

Sharika Enterprises to Automate BMM Ispat Power with SCADA

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved