Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

LONGi Released at SNEC 2021 the Industry’s First “Lifecycle Quality” Standard

Urja Daily by Urja Daily
June 4, 2021
in News
Reading Time: 2 mins read
0
Longi Lifecycle Quality
Share on FacebookShare on TwitterShare on Linkedin

XI’AN, China – LONGi released at SNEC 2021 the industry’s first “Lifecycle Quality” standard. Based on the concept of “customer value first”, “LONGi Lifecycle Quality” will ensure that LONGi products will perform reliably throughout the lifespan and help our customers realize the high returns on investment throughout the entire lifecycle of their PV power plants.

Under its brand concept of “Steadfast and Reliable, Technology Leadership”, LONGi is committed to helping customers secure the value of their power plant throughout its lifecycle through technology and product quality. During SNEC 2021, LONGi demonstrated its technology, management and customer values are above and beyond industrial baseline standards. Customers will be able to access to the quality guarantee and reliable services throughout the lifecycle of their PV power plants.

RELATED POSTS

PwC India Opens Sixth NCR Office with New Gurugram Facility

Is the World Ready for Driverless Cars? Consumer Sentiment and Self-Driving Cars Market Potential

In terms of technical standards, LONGi is consolidating its leading role through multi-dimension technical benchmarking. On managerial standards, LONGi’s standard BOM and stringent reliability monitoring will cover the entire lifecycle management of its products. LONGi is the forerunner in applying wind tunnel testing to validate module design. Maximum wind speed of 60m/s has been tested on LONGi modules, equivalent to a Category 17 hurricane. In the hail test, LONGi even enlarged the test size of the pallets to more than 35mm to validate the high reliability of the module design. LONGi guarantees the quality of its products throughout the entire lifecycle of our customer’s PV power plants.

During the design stage of PV power plants, customers are mostly focused on reducing system costs and improving system electricity generation capacity and safety performance. LONGi can offer customers high-efficiency products that can be adapted to various condition and provide a comprehensive analysis of the optimal module selection for different applications, so as to maximize investment income from the PV power plants.

When the power plants enter the construction phase, LONGi’s global module production capacity of more than 50GW can eliminate customer concerns regarding product delivery. In addition, LONGi’s product quality standard system – which leads the industrial baseline requirements – will fully guarantee the reliability of the product for efficient and stable electricity generation.

In the operation phase of the power plants, customers shift their focus to product quality assurance, stable income stream from the electricity generation, system O & M and power plant optimization. As an important outdoor operational asset with 30-year warranty, the robustness and reliability of PV power plants throughout the entire lifecycle are vital to customers.

From the launch of Hi-MO N to the first release of “LONGi Lifecycle Quality” standard for power plants in solar industry, LONGi has once again won the world’s attention for its commitment of “Customer value first” and its efforts in propelling the global energy transition.

Tags: Lifecycle QualityLONGiPV power plantsSNEC 2021
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

PwC India

PwC India Opens Sixth NCR Office with New Gurugram Facility

by Palak
July 24, 2025
0

Tuesday – PwC India today announced the opening of its new office in DLF Downtown 4, Gurugram - its sixth facility in...

Self-driving Cars Market

Is the World Ready for Driverless Cars? Consumer Sentiment and Self-Driving Cars Market Potential

by Palak
July 24, 2025
0

The concept of self-driving cars has long fascinated the world, and in the last decade, this once-futuristic vision has begun...

STMicroelectronics

STMicroelectronics Reports 2025 Second Quarter Financial Results

by Palak
July 24, 2025
0

Q2 net revenues $2.77 billion; gross margin 33.5%; operating loss of $133 million, including $190 million related to impairment, restructuring...

Sharika Enterprises

Sharika Enterprises to Automate BMM Ispat Power with SCADA

by Palak
July 22, 2025
0

New Delhi : Sharika Enterprises Limited has secured a landmark SCADA automation contract from QMeasure Technologies for the Hosapete (Danapur)...

PackPlus 2025

PackPlus 2025 to Showcase India’s Packaging Strength in Delhi

by Palak
July 18, 2025
0

New Delhi - The 19th edition of PackPlus, India’s leading packaging industry event, is slated to take place from July 31...

Next Post
TEMSA

TEMSA Keeps Expanding Its EV Fleet

Huawei

Huawei Launched Comprehensive Off-Grid Fuel Removal Power Solution

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Wastewater treatment plants

Turn Up the Heat Next Winter with Better Biogas Production!

July 24, 2025
PwC India

PwC India Opens Sixth NCR Office with New Gurugram Facility

July 24, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

Turn Up the Heat Next Winter with Better Biogas Production!

PwC India Opens Sixth NCR Office with New Gurugram Facility

Is the World Ready for Driverless Cars? Consumer Sentiment and Self-Driving Cars Market Potential

STMicroelectronics Reports 2025 Second Quarter Financial Results

Key Hurdles Slowing Electric Cargo Bike Adoption

Sharika Enterprises to Automate BMM Ispat Power with SCADA

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved