Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home E-Mobility

ISGF Study Report on ‘EV Charging Infrastructure Planning and Rollout for Bengaluru City’

Urja Daily by Urja Daily
September 22, 2021
in E-Mobility
Reading Time: 2 mins read
0
India-Smart-Grid-Forum
Share on FacebookShare on TwitterShare on Linkedin

NEW DELHI – Bengaluru Electricity Supply Company Ltd (BESCOM) is the State Nodal Agency for setting up EV charging infrastructure in Karnataka. BESCOM distributes electricity to over 12 million customers in Bengaluru City and adjacent districts of Kolar, Tumakur, Ramanagara, Chikkaballapur, Chitradurga and Davanagere covering an area of 41,092 sq km. BESCOM, the state-owned electricity distribution company has always been a front runner in adoption of new technologies. Karnataka Government issued an Electric Vehicles and Energy Storage Policy in 2017 with the objective of making Bengaluru the EV capital of India. Accordingly, BESCOM has already installed 136 charging stations at 74 locations (32 DC fast-chargers at 15 locations and 104 AC chargers at 74 locations) in Bengaluru City and pursuing the plan to install 1000 charging stations on fast track. With the experience of running 136 charging stations, BESCOM realized the need for assessing the capacity of the distribution grid to accommodate the EV load. In many locations, the grid may require upgrade for accommodating the EV load. This upgrade requires detailed modelling studies.

BESCOM availed the professional services of India Smart Grid Forum (ISGF) to undertake detailed modelling studies to prepare the plan for the deployment of EV charging infrastructure and associated grid upgrades. This study was undertaken by ISGF with  support from Shakti Sustainable Energy Foundation (SSEF). This study report on EV Charging Infrastructure Planning and Rollout for Bengaluru City was released on 18th September 2021 in Bengaluru by Honorable Minister for Energy, Government of Karnataka, Mr V Sunill Kumar at the Karnataka Electric Mobility Workshop organized by BESCOM and ISGF. The workshop was attended by over 400 participants (in-person and online) including EV and Charging Station manufacturers, EV fleet operators, residential welfare association office bearers and other stakeholders. The workshop was addressed by Mr G Kumar Naik, Additional Chief Secretary, Energy, GoK; Mr Rajendra Cholan, MD, BESCOM; Mr Reji Kumar Pillai, President, ISGF; Mr Chetan Maini, Co-founder, Sun Mobility; Mr Mahesh Babu, CEO, Switch Mobility India and COO, Switch Mobility Global; Mr Girish Ghatikar from Electric Power Research Institute, USA; Mr Shashi Verma, Director and Chief Technology Officer at Transport for London; and other domain experts.

RELATED POSTS

Tunwal E-Motors Accelerates Nationwide Expansion, Targets 1,000+ Dealer Network by FY27

Introducing the Kvaser PCIe 4xLIN for next-level LIN connectivity

Modelling studies were conducted on twelve 11 kV feeders on which EV charging stations are already connected. Detailed studies were conducted for different scenarios of EV load and solar rooftop PV penetration on these feeders in the years 2020, 2022 and 2025. Based on the results of the study recommendations for distribution grid upgradations to accommodate EV loads in different scenarios have been prepared. Also, identification of ideal locations in Bengaluru City for establishing EV Charging Stations is included in the report. Evaluation of the business models for EV charging business as well as recommendations on the software platforms for managing the EV charging stations are part of this report.

Tags: BESCOMelectric vehicleElectricityEnergy StorageEV chargingTechnologies
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Tunwal E-Motors

Tunwal E-Motors Accelerates Nationwide Expansion, Targets 1,000+ Dealer Network by FY27

by Palak
June 29, 2026
0

Pune: Tunwal E-Motors Limited a publicly listed electric mobility company specializing in electric bikes, has announced plans to expand its dealership...

Introducing the Kvaser PCIe 4xLIN for next-level LIN connectivity

by Palak
June 29, 2026
0

Mölndal, Sweden - Kvaser introduces the PCIe 4xLIN, a compact four-channel LIN interface built for deterministic communication, precise timing analysis,...

EV Charging

Servotech Secures BEE 5-star Rating for 60 kW & 120 kW DC EV Chargers

by Palak
June 25, 2026
0

New Delhi : Servotech Renewable Power System Ltd. secured the 5-Star rating from the Bureau of Energy Efficiency (BEE) for...

EV Mines

VNT Strengthens Focus on High-Power EV Charging for Fleet Electrification

by Palak
June 19, 2026
0

Gurgaon, India – As rising fuel costs, sustainability goals, and government-led electrification initiatives continue to reshape the transportation sector, the demand...

Robotaxi

What a Southeast Asian Robotaxi Deal Reveals About Mobility’s Future

by Palak
June 18, 2026
0

Hanoi, Vietnam - A new robotaxi partnership involving VinFast highlights four major shifts transforming the automotive industry, from software-defined vehicles...

Next Post
Zypp2

How Data Is Enabling New EV Last-Mile Delivery Business Models

Azelio Energy Storage TES.POD

Azelio Started The Production of Its Energy Storage TES.POD

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Automation Expo 2026 Invite

WIKA India to Showcase Intelligent Instrumentation and IIoT Solutions at Automation Expo 2026 Mumbai, Maharashtra

July 14, 2026
POWERGRID

POWERGRID secures LoI for ISTS augmentation project under TBCB

July 14, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0

WIKA India to Showcase Intelligent Instrumentation and IIoT Solutions at Automation Expo 2026 Mumbai, Maharashtra

POWERGRID secures LoI for ISTS augmentation project under TBCB

JSW Energy arm bags Rs 4.4 billion BESS order from Bondada Engineering

KP Green Engineering Limited Secures ₹2.39 Billion Orders Across Multiple Business Segments

SAEL bags solar module supply order from NTPC REL

Thailand Approves $1.99 Billion Investment in AI, Data Centres and Clean Energy

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved