Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

IOCL Tenders for 2.75 MW Solar Plant in Trichy

Urja Daily by Urja Daily
September 11, 2020
in News
Reading Time: 2 mins read
0
IOCL Tenders for 2.75 MW Solar Plant in Trichy
Share on FacebookShare on TwitterShare on Linkedin

The Indian Oil Corporation (IOCL) has issued a tender, inviting bids from eligible bidders for setting up of 2.75 MW ground-mounted solar power project at the firms’ LPG bottling plant in Trichy, Tamil Nadu.

IOCL proposes to set up the 2.75 MWp solar project for captive consumption at multiple IOCL locations across Tamil Nadu through the Open Access Agreement and Energy Wheeling Agreement. The project will be done through an EPC Contractor on LSTK basis.

RELATED POSTS

PwC India Opens Sixth NCR Office with New Gurugram Facility

Is the World Ready for Driverless Cars? Consumer Sentiment and Self-Driving Cars Market Potential

The scope of work for the selected bidders will include the engineering, procurement and construction (EPC) work on the grid-connected solar project. Which will be followed by 5 years of comprehensive operation and maintenance services for the plant, from the date of successful commissioning.

The commissioning of the full capacity of the project must be completed within nine months from the date of the site handing over.

The last date for bid submission is September 22, 2020, and the techno-commercial buds will be opened on September 23, 2020. A pre-bid meeting has been scheduled for September 15, 2020, to address the concerns raised by the prospective bidders. All bidders will be required to submit an Earnest Money Deposit of Rs 9.6 lakh along with their bids, and there is no MSME preference under this tender.

Further, the manufacturer’s warranty for all bought out items shall be made available to the Owner and shall be valid for the entire defect liability period. And, the Manufacturer’s/Contractor’s warranty, for any replaced item shall also be made available to the Owner and shall be kept valid for the original warranty period.

The Photovoltaic modules shall have a product warranty of a minimum of 10 years and a performance warranty of 25 years from the date of commissioning and the inverters / PCUs shall be warranted for 5 years from the date of commissioning and the Supervisory Control and Data Acquisition (SCADA) System shall be warranted for minimum 5 years.

Tags: IndiaIndian OilIndian Oil Solar Plant in TrichySolar PlantTamil NaduTrichy
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

PwC India

PwC India Opens Sixth NCR Office with New Gurugram Facility

by Palak
July 24, 2025
0

Tuesday – PwC India today announced the opening of its new office in DLF Downtown 4, Gurugram - its sixth facility in...

Self-driving Cars Market

Is the World Ready for Driverless Cars? Consumer Sentiment and Self-Driving Cars Market Potential

by Palak
July 24, 2025
0

The concept of self-driving cars has long fascinated the world, and in the last decade, this once-futuristic vision has begun...

STMicroelectronics

STMicroelectronics Reports 2025 Second Quarter Financial Results

by Palak
July 24, 2025
0

Q2 net revenues $2.77 billion; gross margin 33.5%; operating loss of $133 million, including $190 million related to impairment, restructuring...

Sharika Enterprises

Sharika Enterprises to Automate BMM Ispat Power with SCADA

by Palak
July 22, 2025
0

New Delhi : Sharika Enterprises Limited has secured a landmark SCADA automation contract from QMeasure Technologies for the Hosapete (Danapur)...

PackPlus 2025

PackPlus 2025 to Showcase India’s Packaging Strength in Delhi

by Palak
July 18, 2025
0

New Delhi - The 19th edition of PackPlus, India’s leading packaging industry event, is slated to take place from July 31...

Next Post
The IPO beginning of a new chapter Access To Capital Markets

The IPO beginning of a new chapter Access To Capital Markets

ISA announced Implementing Agency for ‘One Sun One World One Grid’ Initiative

ISA announced Implementing Agency for ‘One Sun One World One Grid’ Initiative

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Wastewater treatment plants

Turn Up the Heat Next Winter with Better Biogas Production!

July 24, 2025
PwC India

PwC India Opens Sixth NCR Office with New Gurugram Facility

July 24, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

Turn Up the Heat Next Winter with Better Biogas Production!

PwC India Opens Sixth NCR Office with New Gurugram Facility

Is the World Ready for Driverless Cars? Consumer Sentiment and Self-Driving Cars Market Potential

STMicroelectronics Reports 2025 Second Quarter Financial Results

Key Hurdles Slowing Electric Cargo Bike Adoption

Sharika Enterprises to Automate BMM Ispat Power with SCADA

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved