Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

HyperloopTT Moves to Italy

Urja Daily by Urja Daily
February 23, 2024
in News
Reading Time: 3 mins read
0
HyperloopTT
Share on FacebookShare on TwitterShare on Linkedin

Hyperloop Transportation Technologies “HyperloopTT” the world’s leading company in developing the next generation of sustainable high-speed travel, announced today a company move from the research and development center in Toulouse, France to Italy. Toulouse laid the groundwork for what was ultimately HyperloopTT’s winning bid for the Italian tender in 2023. In January 2024 the contract for Hyper Transfer was signed, officially starting the project.

HyperloopTT will open new offices outside Venice with additional operations at HyperloopTT’s longtime research partner the Polytechnic of Turin and alongside Hyperloop Italia’s office in Puglia. The capsules, vacuum pumps, control center and levitation and propulsion systems will all be transported to Italy. HyperloopTT personnel local to Toulouse will continue to work on Hyper Transfer and other projects.

RELATED POSTS

VinFast’s Rapid EV Expansion in Tamil Nadu Highlights Bold Growth Ambitions

South Eastern Railway Uses IsoMat Tech to Beat Heat on Tonbridge–Hastings Line

Since opening the Toulouse facility at the Francazal airport in 2017, HyperloopTT has contributed millions of dollars to the local Toulouse economy, hosted global transportation leaders from the US Department of Transportation, European Commission, and Italy’s Hyper Transfer Consortium, and achieved a multitude of critical testing milestones including:

  • 320-meter test track with full-scale tubes and pylons manufactured and assembled
  • Depressurization of track to pressure lower than 0,1 mbar (10 Pa)
  • Repressurization systems with electropneumatic valves on tube
  • Tube air leakage and energy measurement to adjust and maintain the low pressure
  • Propulsion control test using small-scale embedded magnets with a full-scale Linear Synchronous Motor (LSM) and associated power electronics
  • Magnetic Levitation tests
  • Linear Motor Heat dissipation test in vacuum test bench
  • Development of an Operations Control Center (OCC) with Human-Machine Interfaces (HMIs) to control tests directly linked to a safety-certified controller, for integration with partner systems
  • Integration of Traffic Management System developed in partnership with Hitachi Rail

All these milestones were achieved working with over twenty local and regional companies, universities, and other organizations.

Andrés de León, HyperloopTT CEO said:

“We want to thank the mayor, authorities, and community of Toulouse for their support over the past few years. While our progress has not always been consistent, it has always been forward. It became clear to us a few years into our development that the land required to take the next steps with hyperloop certification could not be met at Francazal and so we began searching for a bigger test site that could support the tens of kilometers needed to achieve our goals. We would not be where we are today, including signing the world’s first commercial hyperloop system contract with Italy, without the important groundwork we achieved in Toulouse.”

HyperloopTT began the dismantling of the company’s first track in Toulouse in February and expects to complete the move to Italy within the next six months.

Tags: HyperloopHyperloopTTTransportation Technologies
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

VinFast Swift

VinFast’s Rapid EV Expansion in Tamil Nadu Highlights Bold Growth Ambitions

by Palak
August 18, 2025
0

Gurgaon, Haryana, India - India wants millions of electric vehicles on its roads by the end of the decade. That...

IsoMat

South Eastern Railway Uses IsoMat Tech to Beat Heat on Tonbridge–Hastings Line

by Palak
August 18, 2025
0

The South Eastern Railway has partnered with UK green tech start-up Flint Engineering to combat excessive heat in railway signalling cabinets that...

Watershed Organisation Trust

WOTR’s FarmPrecise App Hits 1 Lakh+ Downloads, Cuts Costs by 20%

by Palak
August 13, 2025
0

Pune : The Watershed Organisation Trust (WOTR) has achieved a significant milestone with its digital advisory platform, FarmPrecise. The app has...

Walplast

Walplast Launches “Nova 125” Premium Gypsum Plaster for Superior Coverage and Performance

by Palak
August 13, 2025
0

Mumbai : Walplast Products Pvt. Ltd., has officially entered the premium gypsum category with the launch of Nova 125 - Premium Gypsum...

Stellantis India

Stellantis India Unveils Dual-Brand Retail Outlet in Ahmedabad to Expand Gujarat Presence

by Palak
August 12, 2025
0

Second Stellantis Brand House in Gujarat, following the Surat launch Full portfolio of both brands available, supported by advanced diagnostics...

Next Post
ReVision Energy

ReVision Energy Starts Construction on NH's First Utility-Owned Solar Project

Yara for green ammonia

Clearway Energy Completes 1.1M Panel Solar Project in Texas

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

VinFast

VinFast EV Plant Anchors Tamil Nadu’s Fourth Auto Cluster

August 18, 2025
ITM Power

ITM Power Signs Agreement for Hydrogen Project in the UK

August 18, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

VinFast EV Plant Anchors Tamil Nadu’s Fourth Auto Cluster

ITM Power Signs Agreement for Hydrogen Project in the UK

SWERL Wins EPC Contract from NTPC REL for 245 MW Solar Project

EV Adhesives Market Enabling Safer, Faster, and Smarter Electric Mobility

Offshore Wind Turbine Efficiency Market Projected to Hit $18.7 Billion by 2033

Innovations Driving Growth in the Fire Pump Market

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved