Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Rooftop

Gujarat Waives Technical Feasibility for Rooftop Solar Systems Under 10 kW

editor by editor
May 28, 2024
in Rooftop, Solar
Reading Time: 1 min read
0
Gujarat Waives
Share on FacebookShare on TwitterShare on Linkedin

The Gujarat Electricity Regulatory Commission (GERC) has released the Draft Gujarat Electricity Regulatory Commission (Net Metering Rooftop Solar PV Grid Interactive Systems) (Fourth Amendment) Regulations, 2024. In an effort to improve the integration of higher solar capacities into the grid while maintaining fair cost distribution, the draft introduces specific requirements for low- and high-tension customers installing rooftop solar systems.

The regulator has waived the requirement for a technical feasibility study for rooftop systems with a maximum capacity of 10 kW. The distribution company will manage any increase in the permitted load for the consumer. Distribution licensees are required under the new amendment to update the capacity of their transformers to connect rooftop solar systems on an annual basis. To guarantee openness and effective grid capacity management, this information must be given to the commission. A significant modification included in the amendment concerns charges related to strengthening the distribution network in order to facilitate rooftop solar installations.

RELATED POSTS

Eastman Unveils SolarLink Grid-Tie Inverter Range to Boost Energy Independence

CREC Gets PHP 4.4B Funding for 125 MW Solar Project in Philippines

Tags: GERCGujarat WaivesRooftop Solar
ShareTweetShare
editor

editor

Related Posts

Eastman Auto & Power Limited

Eastman Unveils SolarLink Grid-Tie Inverter Range to Boost Energy Independence

by Palak
August 18, 2025
0

New Delhi, Delhi, India - Eastman Auto & Power Limited (EAPL), a leading name in innovative and sustainable energy solutions,...

CREC

CREC Gets PHP 4.4B Funding for 125 MW Solar Project in Philippines

by Palak
August 11, 2025
0

Citicore Renewable Energy Corporation (CREC) has secured a PHP 4.4 billion loan facility for a 125 MWp solar project in...

AGEL

AGEL Commissions Solar-Wind Hybrid Project in Khavda

by Palak
August 11, 2025
0

Adani Green Energy Limited’s (AGEL) subsidiary, Adani Renewable Energy Three Limited, has commissioned a 50 MW solar-wind hybrid power project...

SCC Infrastructure

SCC Infrastructure, InSolare Secure Wins in SECI Green Ammonia Auction

by Palak
August 11, 2025
0

The consortium of SCC Infrastructure and InSolare has won the Solar Energy Corporation of India’s (SECI) auction to supply 70,000...

KPI Green

KPI Green Bags Solar BoS Order from ABRL

by Palak
August 8, 2025
0

KPI Green Energy Limited (KPI Green), a subsidiary of KPIG Energia Private Limited, has received a letter of award from...

Next Post
Karnataka government

Karnataka Issues Guidelines to Boost Rooftop Solar Installations

RWE Wind Farms

RWE Plans 1.6 GW Offshore Wind Farms

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Fire Pump Market

Innovations Driving Growth in the Fire Pump Market

August 18, 2025
VinFast Swift

VinFast’s Rapid EV Expansion in Tamil Nadu Highlights Bold Growth Ambitions

August 18, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

Innovations Driving Growth in the Fire Pump Market

VinFast’s Rapid EV Expansion in Tamil Nadu Highlights Bold Growth Ambitions

Eastman Unveils SolarLink Grid-Tie Inverter Range to Boost Energy Independence

RenewSys Secures 700 MW POE Encapsulant Supply Deal with Kosol Energie

South Eastern Railway Uses IsoMat Tech to Beat Heat on Tonbridge–Hastings Line

Montra Electric Opens e-SCV Dealership in Coimbatore in Partnership with TVS Vehicle Mobility Solution

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved