Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable

GEDA Releases Guidelines for Off-Grid Renewable Energy Projects

Urja Daily by Urja Daily
February 3, 2025
in Renewable
Reading Time: 1 min read
0
GEDA
Share on FacebookShare on TwitterShare on Linkedin

The Gujarat Energy Development Agency (GEDA) has introduced detailed procedures for setting up offgrid solar, wind, and wind-solar hybrid power projects. These guidelines aim to support entities in meeting renewable purchase obligation requirements, expand renewable energy in offgrid areas, and enhance energy security and sustainability.

Developers must apply online via GEDA’s renewable energy portal, with provisional registration fees of Rs 50,000 plus GST for wind and hybrid projects and Rs 10,000 plus GST for solar projects. A no objection certificate (NOC) from discom/getco is mandatory to confirm the project is offgrid. Wind and hybrid project developers must also verify turbine locations, paying Rs 1,000 plus GST per site.

RELATED POSTS

Shweta Solar set to unveil 1.2 GW Advanced Solar Module Manufacturing Facility in NCR

IGL and RVUNL Forge Joint Venture for Rajasthan Solar Farms

Registration fees vary by project size, from Rs 300,000 for wind and hybrid projects up to 25 MW to Rs 1,800,000 for projects exceeding 100 MW. Solar projects under 1 MW require Rs 13,000, while those above 1 MW require Rs 26,000. Moreover, projects must comply with the Ministry of New and Renewable Energy’s “Guidelines for Development of Onshore Wind Power Projects”. In case of disputes, Gujarat’s Energy and Petrochemicals Department will have the final authority and the decision will be binding on all stakeholders.

Tags: GEDAGujarat EnergyRenewable EnergyWind
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Shweta Solar

Shweta Solar set to unveil 1.2 GW Advanced Solar Module Manufacturing Facility in NCR

by Palak
September 5, 2025
0

New Delhi : Shweta Solar Pvt. Ltd. (Shweta Solar) is all set to launch a new 1.2 GW solar module manufacturing...

IGL and RVUNL

IGL and RVUNL Forge Joint Venture for Rajasthan Solar Farms

by Palak
September 3, 2025
0

Indraprastha Gas Limited (IGL) and Rajasthan Rajya Vidyut Utpadan Nigam Limited (RVUNL) have inked a joint venture (JV) agreement to...

Renewable

Renewable Sources Projected to Exceed 40% of Total Generating Capacity by 2027

by Palak
September 3, 2025
0

Washington DC – A review by the SUN DAY Campaign of data just released by the Federal Energy Regulatory Commission (FERC)...

Serentica Renewables

Serentica Renewables, Shanghai Gotion to Develop 200 MWh BESS in Rajasthan

by Palak
September 2, 2025
0

Serentica Renewables has partnered with Shanghai Gotion Digital Energy Tech Company to set up a 50 MW/200.6 MWh battery energy...

Premier Energies

Premier Energies Bags ₹27.03 Billion Orders for Solar Modules and Cells

by Palak
September 2, 2025
0

Premier Energies Limited has secured orders worth Rs 27.03 billion for the supply of solar photovoltaic modules and cells with...

Next Post
SRK

SRK Sets New Benchmark in Sustainability by Achieving Reduction in GHG Emissions

Renny Strips Powers Ahead with 22MW Solar Energy Initiative

Renny Strips Powers Ahead with 22MW Solar Energy Initiative

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Shweta Solar

Shweta Solar set to unveil 1.2 GW Advanced Solar Module Manufacturing Facility in NCR

September 5, 2025
Powering India's Future

Transmission Lines: Myths, Facts, and Why They Matter for Powering India’s Future

September 5, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

Shweta Solar set to unveil 1.2 GW Advanced Solar Module Manufacturing Facility in NCR

Transmission Lines: Myths, Facts, and Why They Matter for Powering India’s Future

UAE Energy Undersecretary Visits Tellus Power Globe Holding’s Hong Kong Office

The Hype Studio Partners with Kaydence Media Ventures to Boost Advocacy and PR Leadership

What’s Holding Back the EV Battery Revolution?

Zaggle and Standard Chartered Partner to Revolutionize Corporate Spend Management

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved