Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Tenders

Extension of Bid Submission Deadline: Tender for 50 MW (AC) Solar PV Project at Tamilnadu

Urja Daily by Urja Daily
September 25, 2021
in Tenders
Reading Time: 2 mins read
0
SECI
Share on FacebookShare on TwitterShare on Linkedin

Extension of Bid submission Deadline: Tender for 50 MW (AC) Solar PV Project with Land having 10 years plant O&M at Tamilnadu, India

Employer: Solar Energy Corporation of India Limited (SECI), New Delhi, India

RELATED POSTS

RECPDCL Floats Tender for Maharashtra Substation Project

Italy Launches €15.9 Million Tender to Boost Solar Energy Deployment

Tender title: Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 50 MW (AC) Solar PV Project with Land having 10 years plant O&M at Tamilnadu, India

Tender No: SECI/C&P/TD/2020/TN/50

Tender Search Code (TSC): SECI-2021-TN000001

Extension of Bid submission Deadline: 

Existing Date & Time of Bid Submission: 22.09.2021 till 1400 HRS

Existing Date & Time of Bid Opening: 22.09.2021 at 1600 HRS

Revised Date & Time of Bid Submission: 22.10.2021 till 1400 HRS

Revised Date & Time of Bid Opening: 22.10.2021 at 1600 HRS

Prospective Bidders are requested to remain updated for any notices wrt the Bidding documents through the websites www.seci.co.in as no separate notification will be issued in this regard.

‘Click Here To See Files’

Tags: 50 MWDesignengineeringSECISolar PV project
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

RECPDCL

RECPDCL Floats Tender for Maharashtra Substation Project

by Palak
September 3, 2025
0

REC Power Development and Consultancy Limited (RECPDCL) has floated a tender to set up a 400/132 kV AIS substation in...

Solar Energy

Italy Launches €15.9 Million Tender to Boost Solar Energy Deployment

by Palak
August 8, 2025
0

Pavia Acque Scarl, the integrated water service company of Pavia city, has launched a €15.89 million tender for solar photovoltaic...

RECPDCL

RECPDCL Floats 3 GW ISTS Transmission Tender in Andhra Pradesh

by Palak
May 28, 2025
0

REC Power Development and Consultancy Limited (RECPDCL) has issued a request for proposal to develop an inter-state transmission system (ISTS)...

KPTCL

KPTCL Awards 700 MWh in 1 GWh Battery Storage Tender

by Palak
April 9, 2025
0

Karnataka Power Transmission Corporation Limited (KPTCL) has announced the results of its 500 MW/1 GWh battery energy storage system (BESS)...

TNGECL

TNGECL Issues Tender for 1 GWh BESS with VGF Support

by Palak
March 18, 2025
0

Tamil Nadu Green Energy Corporation Limited (TNGECL) has initiated the bidding process for the development of six standalone battery energy...

Next Post
SECI

15 MW Grid Connected Floating Solar PV Power Plant at Nangal Pond, Himachal Pradesh: SECI

solar-cell

Solar Cells and The Trends Shaping the Solar Sector

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Shweta Solar

Shweta Solar set to unveil 1.2 GW Advanced Solar Module Manufacturing Facility in NCR

September 5, 2025
Powering India's Future

Transmission Lines: Myths, Facts, and Why They Matter for Powering India’s Future

September 5, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

Shweta Solar set to unveil 1.2 GW Advanced Solar Module Manufacturing Facility in NCR

Transmission Lines: Myths, Facts, and Why They Matter for Powering India’s Future

UAE Energy Undersecretary Visits Tellus Power Globe Holding’s Hong Kong Office

The Hype Studio Partners with Kaydence Media Ventures to Boost Advocacy and PR Leadership

What’s Holding Back the EV Battery Revolution?

Zaggle and Standard Chartered Partner to Revolutionize Corporate Spend Management

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved