Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

enfinium Skelton Grange waste-to-energy Facility Achieves Financial Close

Urja Daily by Urja Daily
July 8, 2021
in News
Reading Time: 3 mins read
0
enfinium Skelton Grange waste-to-energy Facility Achieves Financial Close

Architect impression of the Skelton Grange waste-to-energy facility post construction

Share on FacebookShare on TwitterShare on Linkedin

enfinium today reached financial close on a new 410,000 tonnes per annum waste-to-energy facility in Leeds, West Yorkshire.

enfinium Skelton Grange is a combined heat and power facility which will process 410,000 tonnes of residual (post-recycled) waste to generate 49MW (gross) of partially renewable, baseload electricity to power the needs of more than 100,000 U.K. homes. enfinium Skelton Grange will create more than 400 jobs during construction and over 45 full-time jobs, once operational, bringing significant economic benefit and investment to the local area.

RELATED POSTS

Ashoka Buildcon Wins Sakoli Substation Project LoI

Agastya Energy to Invest ₹7,800 Crore in 12 GW Ingot-Wafer Expansion

“Today marks a significant milestone for the project and a huge step forward to providing capacity for the safe and reliable treatment of waste that cannot be reduced, reused or recycled in the U.K. I’m incredibly proud of our team and our partners who have worked tirelessly and safely throughout coronavirus to make a difference today to deliver a cleaner tomorrow. We are excited to welcome our fifth facility to our fleet and look forward to working with HZI to commence construction this month,” said Chief Executive Officer Julia Watsford.

Progress to reach financial close follows planning permission by Leeds City Council in March 2020 and the award of an Environmental Permit by the Environment Agency in December 2020. In January, enfinium Skelton Grange signed two long-term waste supply contracts for over 50% of the facility’s annual capacity with SUEZ and Beauparc. Further long-term waste supply contracts were signed with Biffa and B&M Waste in June 2021.  

HZI has been named the Engineering, Procurement and Construction (EPC) contractor for the delivery of enfinium Skelton Grange. enfinium has a long and successful partnership with HZI, following the successful construction of nearby waste-to-energy facilities, enfinium Ferrybridge 1 and 2 at Knottingley, West Yorkshire.

enfinium is the largest pure play waste-to-energy business in the U.K. and is a developer, owner and operator of seven strategically located waste-to-energy facilities in operation or advanced development. enfinium is an integral part of the U.K.’s environmental infrastructure, diverting waste that cannot be reduced, reused or recycled from landfills and export, and providing residents and businesses with local, sustainable waste treatment solutions, converting residual waste into heat and partially renewable power. enfinium continues to progress its other two advanced combined heat and power facilities, including 400,000 tonne per annum Kelvin in West Bromwich and 390,000 tonne per annum Kemsley North in Kent.

“We remain fully committed to supporting and investing in the green recovery in the U.K. and developing regional combined heat and power waste-to-energy capacity – with our team now turning our full attention to reaching financial close on enfinium Kelvin later this year. We look forward to continuing to power green communities and the circular economy,” Julia Watsford said.

Tags: coronavirusenfinium
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Ashoka Buildcon

Ashoka Buildcon Wins Sakoli Substation Project LoI

by Palak
August 17, 2026
0

Ashoka Buildcon Limited has secured a letter of intent (LoI) from REC Power Development and Consultancy Limited (RECPDCL) under the...

Agastya Energy

Agastya Energy to Invest ₹7,800 Crore in 12 GW Ingot-Wafer Expansion

by Palak
August 17, 2026
0

Agastya Green Energy Limited, part of the Anubhav Agarwal Group, has announced an expansion into integrated 12 GW ingot and...

Hinduja Group

Hinduja Group to Invest ₹2,500 Crore in Tamil Nadu

by Palak
August 17, 2026
0

The Hinduja Group has committed Rs 25 billion for investments in Tamil Nadu, spanning renewable energy, electric mobility, financial services,...

Inox Clean Energy

Inox Clean Energy Secures ₹1,500 Crore Investment from Motilal Oswal Group

by Palak
August 17, 2026
0

Inox Clean Energy, the renewable energy platform of the INOXGFL Group, has secured an investment commitment of Rs 15 billion...

N4786D

STMicroelectronics’ new galvanically isolated gate drivers simplify power design with advanced isolation

by Palak
August 14, 2026
0

2026 -- STMicroelectronics has extended the STGAP3S family of gate drivers that feature enhanced galvanic isolation for greater reliability, introducing an efficient and...

Next Post
Tata Power EZ Charge ‘Stands Tall ‘ with the First Rapid Charger

Tata Power EZ Charge ‘Stands Tall ‘ with the First Rapid Charger

Thermoelectric Harvesting Needs a U-Turn, Says IDTechEx

Thermoelectric Harvesting Needs a U-Turn, Says IDTechEx

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Dr. Sunder Raju, Chairman, Atria Group

Agrivoltaics: Building the Future of Farming and Clean Energy Together

August 17, 2026
Powering Electric Vehicles

Off-Grid EV Solar Charger Market: Powering Electric Vehicles Beyond the Grid

August 17, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Agrivoltaics: Building the Future of Farming and Clean Energy Together

Off-Grid EV Solar Charger Market: Powering Electric Vehicles Beyond the Grid

Oswal Pumps Secures 20 MW Rooftop Solar Order

Ashoka Buildcon Wins Sakoli Substation Project LoI

Agastya Energy to Invest ₹7,800 Crore in 12 GW Ingot-Wafer Expansion

TARIL Wins ₹500 Crore APTRANSCO Transformer Order

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved