Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

Ellume secures LoA for 100 MW solar project

editor by editor
March 19, 2024
in Solar
Reading Time: 1 min read
0
Ellume
Share on FacebookShare on TwitterShare on Linkedin

Ellume Solar has been granted a letter of award by Maharashtra State Power Generation Company to construct 100 MW grid-connected solar power projects in Aurangabad.

By quoting a tariff of Rs 2.97 per kWh, Ellume secured the project to deliver electricity to agricultural feeders on a public-private partnership model as a part of Mukhyamantri Saur Krishi Vahini Yojna. Ellume Solar is required to provide the confirmed locations for establishing the project by March 23, 2024. Before signing the power purchase agreement, the company is required to furnish Rs 500,000 per MW as a performance bank guarantee.

RELATED POSTS

Solex Energy Unveils Two Next-Gen High-Efficiency Solar Solutions

Delhi Government Issues Amendments to Solar Energy Policy 2023

The tender was issued in August 2022 for the development of 600 MW (100 MW x 6) solar projects across Nagpur, Amravati, Aurangabad, Konkan, Nashik, and Pune. The uncertified land for the projects, which may be either owned or leased, should be located in close proximity to the 11 kV substation of Maharashtra State Electricity Distribution Company (MSEDCL). Ellume is responsible for verifying and evaluating the capacity and grid connectivity of the substation. The company is also required to build and install a complete evacuation line, including availability-based tariff meters, connecting the switchyard of the solar power project to the nearest MSEDCL substation. The meters will be positioned at the MSEDCL substation.

Tags: ElectricityEllumeMSEDCLpowersolar
ShareTweetShare
editor

editor

Related Posts

Solar Energy

Solex Energy Unveils Two Next-Gen High-Efficiency Solar Solutions

by Palak
July 22, 2025
0

This marks Solex’s focused expansion in Rajasthan, bringing robust, efficient & climate-resilient solar technology to support the region’s growing renewable...

Delhi Government

Delhi Government Issues Amendments to Solar Energy Policy 2023

by Palak
July 21, 2025
0

The Delhi Government has notified the first amendment to its Delhi Solar Energy Policy 2023, raising the subsidy for residential...

Sol Systems

Sol Systems Secures $675 Million for US Solar and Storage Portfolio

by Palak
July 21, 2025
0

Sol Systems has secured $675 million revolving construction finance facility for its solar and storage projects portfolio. The facility will...

MNRE

MNRE Unveils 435 MW Gorbea Solar Power Project in Rajasthan

by Palak
July 21, 2025
0

Ministry of New and Renewable Energy (MNRE) inaugurated the 435 MW Gorbea solar power project as developed by Zelestra India...

WattPower Solar

WattPower, First Solar Host ‘Solar Connect’ to Promote Agri-Solar in Telangana

by Palak
July 18, 2025
0

New Delhi – WattPower hosted a high-level industry roundtable, ‘Solar Connect’, at Vivanta, Hyderabad. The event brought together policy influencers, clean energy...

Next Post
Octopus Energy

Octopus Energy Acquires 50% Stake in Lintas Green Energy

green hydrogen hubs

MNRE issues guidelines to set up green hydrogen hubs in India

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Sharika Enterprises

Sharika Enterprises to Automate BMM Ispat Power with SCADA

July 22, 2025
Solar Energy

Solex Energy Unveils Two Next-Gen High-Efficiency Solar Solutions

July 22, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

Sharika Enterprises to Automate BMM Ispat Power with SCADA

Solex Energy Unveils Two Next-Gen High-Efficiency Solar Solutions

Pedal Power Surge: Bicycle Industry Poised for Rapid Expansion

Cabinet Grants Investment Exemption to NLCIL for Boosting Renewable Energy Expansion

HPDCAPL Earns Carbon Credits for 3 MW Zemithang Hydro Project

Delhi Government Issues Amendments to Solar Energy Policy 2023

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved