Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Tenders

East Central Railway Issues Tender for 10 MW Solar Projects

editor by editor
June 15, 2024
in Tenders
Reading Time: 1 min read
0
East Central Railway
Share on FacebookShare on TwitterShare on Linkedin

East Central Railway of Samastipur division has issued a request for proposals for the installation of 10 MW ground-mounted solar projects. To be located at various locations, the projects will be developed on the basis of build, own, operate, and transfer model. The projects will be developed in two capacity ranges: range 1, spanning from above 500 kW to 1 MW, and range 2, covering above 1 MW up to 5 MW. The bidders have the option to bid for one or both capacities.

According to the tender guidelines, the bidders are required to submit Rs 1.07 million per MW of quoted capacity as an earnest money deposit. Within 30 days of signing the power purchase agreement (PPA), the developers are required to furnish Rs 1.6 million per MW as a performance security. The developer will be responsible for operations and maintenance for a period of 25 years. The bid submission deadline is July 18, 2024.

RELATED POSTS

RECPDCL Floats Tender for Maharashtra Substation Project

Italy Launches €15.9 Million Tender to Boost Solar Energy Deployment

After receiving the letter of award, the developer and the railways will enter into a 25 year PPA. The projects must be completed within 240 days of work order issuance. To be eligible, bidders must have experience in installation of grid-connected ground-mounted solar projects, with capacity of at least total 500 kW. Furthermore, only indigenously manufactured solar modules listed in the Approved List of Models and Manufacturers must be used in the projects.

Tags: East Central RailwayPPAsolar
ShareTweetShare
editor

editor

Related Posts

RECPDCL

RECPDCL Floats Tender for Maharashtra Substation Project

by Palak
September 3, 2025
0

REC Power Development and Consultancy Limited (RECPDCL) has floated a tender to set up a 400/132 kV AIS substation in...

Solar Energy

Italy Launches €15.9 Million Tender to Boost Solar Energy Deployment

by Palak
August 8, 2025
0

Pavia Acque Scarl, the integrated water service company of Pavia city, has launched a €15.89 million tender for solar photovoltaic...

RECPDCL

RECPDCL Floats 3 GW ISTS Transmission Tender in Andhra Pradesh

by Palak
May 28, 2025
0

REC Power Development and Consultancy Limited (RECPDCL) has issued a request for proposal to develop an inter-state transmission system (ISTS)...

KPTCL

KPTCL Awards 700 MWh in 1 GWh Battery Storage Tender

by Palak
April 9, 2025
0

Karnataka Power Transmission Corporation Limited (KPTCL) has announced the results of its 500 MW/1 GWh battery energy storage system (BESS)...

TNGECL

TNGECL Issues Tender for 1 GWh BESS with VGF Support

by Palak
March 18, 2025
0

Tamil Nadu Green Energy Corporation Limited (TNGECL) has initiated the bidding process for the development of six standalone battery energy...

Next Post
BluPine Energy

BluPine Energy Signs PPA for 46.87 MWp Solar Project

NTPC Tenders

NTPC Issues Tender for 500 MWh Battery Energy Storage System

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Mr. Raman Bhatia with Jerry Nie Sino Zhuhai Piwin New Energy Co., Ltd

Servotech Renewable Power Partners with Zhuhai Piwin New Energy in Exclusive Deal

September 8, 2025
Vikram Solar

Vikram Solar Bags 336 MW Module Supply Order from L&T for Khavda Project

September 8, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

Servotech Renewable Power Partners with Zhuhai Piwin New Energy in Exclusive Deal

Vikram Solar Bags 336 MW Module Supply Order from L&T for Khavda Project

What Are the Latest Technological Innovations in Fuel Cell Vehicles?

Shweta Solar set to unveil 1.2 GW Advanced Solar Module Manufacturing Facility in NCR

Transmission Lines: Myths, Facts, and Why They Matter for Powering India’s Future

UAE Energy Undersecretary Visits Tellus Power Globe Holding’s Hong Kong Office

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved