Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

CtrlS Builds Building Integrated Vertical Solar PV system from WAAREE

Urja Daily by Urja Daily
August 14, 2020
in News
Reading Time: 2 mins read
0
Waaree Solar PV System
Share on FacebookShare on TwitterShare on Linkedin

MUMBAI, India, Aug. 14, 2020 – CtrlS Datacenters Asia’s Largest Rated-4 Hyperscale Datacenter and managed services provider, has deployed building integrated vertical solar PV system from WAAREE at its Mumbai datacenter facility. The system, with a capacity of about 1 MW, has been installed by integrating solar panels on all four walls of the facility, covering over 5,000 square feet of facade area. It is estimated that solar power system will help provide a CO2 emissions reduction equivalent to almost 7,000 trees per year.

WAAREE BIPV modules were installed on the Rated-4 Hyperscale Datacenter built by CtrlS where Custom designed aluminium rails were used as module mounting structure. Frameless WAAREE BIPV panels were deployed on the facade. Each WAAREE BIPV solar panel was installed with power optimizers to increase energy output from PV systems by constantly tracking the maximum power point (MPPT) of each module individually. They have the capability to monitor the performance of each module.

RELATED POSTS

PwC India Opens Sixth NCR Office with New Gurugram Facility

Is the World Ready for Driverless Cars? Consumer Sentiment and Self-Driving Cars Market Potential

Mr. Sridhar Pinnapureddy, Founder and CEO, CtrlS Datacenters Ltd, said, “The combustion of fossil fuels has led to dramatic rise in carbon dioxide emissions globally, and it is my belief that as a responsible business it is prudent to embrace clean energy. We are delighted to have partnered with WAAREE to take a major step in deployment of solar energy at our Mumbai Rated-4 Hyperscale datacenter. We chose to install the solar panels on all the four sides of the building instead of roof top solar as it provides large space for absorption of sunlight. We therefore replaced the conventional glass in our data center facility, with solar panels thereby generate higher power through clean energy and thereby reducing carbon footprint. Besides, the WAAREE BIPV panels act as a thermal insulation by blocking the sun and thus also reducing the power consumption of the air conditioning system, thus saving on electricity bills considerably.” He further added, “We are delighted to have found a suitable partner in WAAREE, who have played a key role in supporting our innovation in deploying clean energy.”

Speaking on this achievement Dr. Hitesh Doshi, CMD WAAREE Energies Ltd, said, “We are happy to be part of such a innovative BIPV project and we are thankful to Ctrl S for not only giving us opportunity but implementing such great idea and making India’s first largest BIPV project. WAAREE BIPV technology can be adapted to any building that requires a glass facade, including but not limited to skyscrapers, malls, apartments, modern homes, datacentres and many more existing Buildings, or the ones that are in design stage. The challenge of not only the space to mount Solar Panels is addressed by WAAREE BIPV solutions but also the aesthetics and beauty of building is enhanced by replacing normal glass to solar panels. WAAREE will continue to design and develop products to increase use of solar energy.”

For further information, please visit: https://www.waaree.com/

Tags: building integratedCtrlS DatacentersMumbai datacentersolar PV systemWAAREE
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

PwC India

PwC India Opens Sixth NCR Office with New Gurugram Facility

by Palak
July 24, 2025
0

Tuesday – PwC India today announced the opening of its new office in DLF Downtown 4, Gurugram - its sixth facility in...

Self-driving Cars Market

Is the World Ready for Driverless Cars? Consumer Sentiment and Self-Driving Cars Market Potential

by Palak
July 24, 2025
0

The concept of self-driving cars has long fascinated the world, and in the last decade, this once-futuristic vision has begun...

STMicroelectronics

STMicroelectronics Reports 2025 Second Quarter Financial Results

by Palak
July 24, 2025
0

Q2 net revenues $2.77 billion; gross margin 33.5%; operating loss of $133 million, including $190 million related to impairment, restructuring...

Sharika Enterprises

Sharika Enterprises to Automate BMM Ispat Power with SCADA

by Palak
July 22, 2025
0

New Delhi : Sharika Enterprises Limited has secured a landmark SCADA automation contract from QMeasure Technologies for the Hosapete (Danapur)...

PackPlus 2025

PackPlus 2025 to Showcase India’s Packaging Strength in Delhi

by Palak
July 18, 2025
0

New Delhi - The 19th edition of PackPlus, India’s leading packaging industry event, is slated to take place from July 31...

Next Post
BEL Solar Power Class rooms

BEL Provides Solar Power Classrooms to 122 Schools in Karnataka

Electric vehicle

To Push Electric Mobility, India Allows Sale of EV Without Batteries

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Wastewater treatment plants

Turn Up the Heat Next Winter with Better Biogas Production!

July 24, 2025
PwC India

PwC India Opens Sixth NCR Office with New Gurugram Facility

July 24, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

Turn Up the Heat Next Winter with Better Biogas Production!

PwC India Opens Sixth NCR Office with New Gurugram Facility

Is the World Ready for Driverless Cars? Consumer Sentiment and Self-Driving Cars Market Potential

STMicroelectronics Reports 2025 Second Quarter Financial Results

Key Hurdles Slowing Electric Cargo Bike Adoption

Sharika Enterprises to Automate BMM Ispat Power with SCADA

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved