Alternergy Holdings Corporation has partnered with China Energy Engineering Group Guangdong Electric Power Design Institute Company Limited (GEDI) and GEDI Construction Development Corporation (GCDC), a subsidiary of GEDI for the engineering, procurement, and construction (EPC) of its 163 MW Alabat and Tanay wind power projects in the Philippines.
The contract scope includes design, engineering, procurement of civil and electrical works materials, equipment transport, construction and installation of both wind farms.