Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

According to ICRA Overall Electricity Demand Nearly at pre-Covid Levels

Urja Daily by Urja Daily
September 3, 2020
in News
Reading Time: 3 mins read
0
According to ICRA Overall Electricity Demand Nearly at pre-Covid Levels
Share on FacebookShare on TwitterShare on Linkedin

As per an ICRA note, the electricity demand recovery on all India level has largely been led by Northern and Eastern states with a year-on-year (Y-o-Y) increase of 6 percent – 13 percent in demand in July 2020. This was mainly driven by rural consumption, while the demand in large industrial states witnessed a 6 percent – 15 percent decline in July 2020 on a Y-o-Y basis, on back of slower recovery in industrial activity. Also, the recovery in the all India demand in August 2020 is on a lower base, considering the demand decline witnessed on a Y-o-Y basis in August 2019.

Girishkumar Kadam, Sector Head & VP, Corporate ratings at ICRA said, “the imposition of lockdown to control the Covid-19 pandemic led to a decline in the all India electricity demand by 13.1 percent in the first four months of FY2021. While the monthly demand recovered from 85 billion units (BUs) in April 2020 to 112 BUs in July 2020, it remained lower on a Y-o-Y basis.

RELATED POSTS

BL Agro Goes Global; Aims To Invest ₹7,000 Crore in Tanzania Across Edible Oil, Dairy, Agriculture and Manufacturing

Transformerless Solar Central Inverter Market to Reach USD 8.4 Billion by 2034

“Also, while the peak demand recovered from 133 GW in April 2020 to 171 GW in July 2020, it remained lower by 3.3 percent compared to July 2019. This was also because of the re-imposition of lockdown restrictions in many parts across the country, due to rise in Covid-19 infections. Given the energy demand trends so far across the key states, ICRA continues to maintain its outlook for about 5-6 percent decline in the all India electricity demand in FY2021 over FY2020. The decline in demand is expected to suppress the thermal PLF on an all India level to about 50-51 percent in FY2021 against 56.0 percent in FY2020.”

The note goes on to add that the decline in demand has adversely impacted revenues and cash collections for the power distribution utilities (Discoms), especially given that the bulk of the consumption decline has come from high tariff paying industrial and commercial consumers. The consequent revenue gap for the Discoms at all India level is estimated to increase by about Rs 420-450 billion in FY2021.

In the context of the large build-up of receivables from Discoms to power generating companies and the adverse impact of the lockdown on the Discom finances, the Government of India has announced a liquidity support scheme of Rs 90,000 crore for the state Discoms, discoms, in the form of loans against receivables, from the Power Financial Corporation (PFC) and the Rural Electrification Corporation (REC). PFC and REC have so far sanctioned Rs 68,000 crore under the.

scheme to clear payments to power generating companies in lieu of dues pending from the state Discoms.

“This is a positive development for the Central power utilities and IPPs impacted by the delays in receiving payments from the Discoms. For ICRA’s sample set of power generating companies, which together constitute for ~65 percent of the pending payments from discoms as of March 2020, the recovery of overdue payments from Discoms till March 2020 is estimated to lower the interest costs by ~9-10 percent on an annualised basis, assuming the payments realised under this scheme are primarily used to reduce the debt. Nonetheless, the discoms’ ability to make timely payments in a sustained manner towards the generating companies continues to remain a key monitorable, which would be dependent on the demand recovery from industrial and commercial consumers in the near term, besides the efforts to address the structural issues confronting the distribution segment.” adds Vikram V, Associate Head & Assistant VP, ICRA Ratings.

The note concludes by stating that thus, proactive efforts are required on the part of the state governments and Discoms for achieving a sustainable improvement in Discoms finances. These include timely filing of tariff petitions by Discoms to enable timely issuance of tariff orders by the regulators along with adequate tariff revisions, timely and adequate subsidy payments by the state governments and improvement in operating efficiency through a reduction in AT&C loss levels.

Tags: electricity demandElectricity Demand pre-Covid LevelICRAIndiamarket researchpower demand
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

BL Agro

BL Agro Goes Global; Aims To Invest ₹7,000 Crore in Tanzania Across Edible Oil, Dairy, Agriculture and Manufacturing

by Urja Daily
October 23, 2026
0

New Delhi/Bareilly : BL Agro announced its entry into the global market with a strategic investment of ₹7000 crore in...

Solar wind

Transformerless Solar Central Inverter Market to Reach USD 8.4 Billion by 2034

by Urja Daily
October 23, 2026
0

According to latest research by Growth Market Reports, the Transformerless Solar Central Inverter market size reached USD 4.1 billion in...

Yash Highvoltage

Yash Highvoltage® Delivers Robust H1 FY27 Growth with Revenue Up 95%, EBITDA Up 136% and PAT Up 165% YoY

by Urja Daily
October 22, 2026
0

Vadodara : Yash Highvoltage Limited a leading manufacturer of condenser-graded high voltage and high current transformer bushings, has announced its unaudited...

Comau

Comau Partners with NVIDIA to Advance Physical AI in Industrial Robotics

by Urja Daily
October 21, 2026
0

Comau is integrating NVIDIA Physical AI simulation libraries and accelerated computing into its products and system design processes to accelerate...

EcoCortec

EcoCortec® Lab Earns Prestigious ISO/IEC 17025 Accreditation, Solidifying Global Trust in VpCI® Quality

by Urja Daily
October 21, 2026
0

EcoCortec has been granted HRN EN ISO/IEC 17025:2017 accreditation. Effective October 5th for a five-year period, the EcoCortec® Testing Laboratory...

Next Post
Western Railway Announced to Give 3 Crore Rs for Solar Power

Western Railway Announced to Give 3 Crore Rs for Solar Power

Sungrow Sign MoU with Shanghai Electric to 1500V turnkey Solution

Sungrow Sign MoU with Shanghai Electric to 1500V turnkey Solution

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Rahul Das, AVP

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

October 23, 2026
Emmvee

Emmvee unveils India’s first Quarter-Cut Module with 4 Cut TOPCon Cell, delivering up to 30W higher power output 

October 23, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0

Why Should Large Industrial Entities Invest in BESS When They Have Already Invested in Solar?

Emmvee unveils India’s first Quarter-Cut Module with 4 Cut TOPCon Cell, delivering up to 30W higher power output 

BL Agro Goes Global; Aims To Invest ₹7,000 Crore in Tanzania Across Edible Oil, Dairy, Agriculture and Manufacturing

Transformerless Solar Central Inverter Market to Reach USD 8.4 Billion by 2034

Fujiyama Power Systems Limited clarifying the potential impact of China’s proposed export restrictions on solar cell manufacturing technology and machinery

Yash Highvoltage® Delivers Robust H1 FY27 Growth with Revenue Up 95%, EBITDA Up 136% and PAT Up 165% YoY

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved