Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

LONGi Hydrogen wins in the Sinopec Green Hydrogen Demonstration Project

Urja Daily by Urja Daily
May 12, 2022
in News
Reading Time: 2 mins read
0
Longi hydrogen
Share on FacebookShare on TwitterShare on Linkedin

XI’AN, China – LONGi Hydrogen wins in the Sinopec Green Hydrogen Demonstration Project, to supply world leading large scale ALK electrolysis equipment. The project is China’s first >10,000 ton green hydrogen project and the world’s largest green hydrogen project so far.

With a total investment up to RMB 3 billion, this project will build a new 300MW photovoltaic power plant and an electrolytic water hydrogen production plant to generation 618 million kWh green electricity and 20,000 tons green hydrogen per year.

RELATED POSTS

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

The project is anticipated to be completed and put into operation in June 2023, which will reduce 485,000 tons of CO₂ emission per year to help the China Oil & Gas industry to achieve the emissions and decarbonize target.

LONGi Hydrogen was recognized for its pioneering technology

LONGi Hydrogen will provide world leading large scale water electrolysis equipment with 4 to 1 electrolyzer – Gas-liquid separation devices system to achieve 4000Nm³/h hydrogen production. The system is designed and proven to achieve leading performance of high current density, low power consumption, small footprint, which will help to reduce the cost effectively. The load response of the system is at millisecond level, and the equipment is compatible with IGBT power supplies, adapting optimally to large-scale hydrogen production using renewable energy source.

Li Zhenguo, founder and president of LONGi said that LONGi Hydrogen electrolysis equipment is proven to be reliable, safe and cost-efficient in hydrogen production. The company will continue to increase investment in R&D to drive technology and product innovation. With the construction of digital and intelligent factories, the capacity of LONGi ALK electrolyzer will reach 1.5 GW by the end of 2022 and 5 GW by the end of 2025.

Tags: ALK electrolysis equipmentGreen HydrogenLONGi Hydrogen
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

by Palak
August 3, 2026
0

HONG KONG - Driven by the rapid iteration of global artificial intelligence (AI) large models, the continuous surge in computing demand...

ASDC CEO Prasanna Pahade

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

by Palak
August 3, 2026
0

New Delhi: The Automotive Skills Development Council (ASDC), India's apex skill development body for the automotive sector, today announced the appointment...

Ather Energy

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

by Palak
August 3, 2026
0

National : Ather Energy reported a strong EBITDA improvement of 1,650 basis points (bps) year-on-year (YoY).The company delivered 83,173 units...

PVV Infra

PVV Infra secures land mark sites from NHLML for developing wayside amenities

by Palak
August 3, 2026
0

Hyderabad : PVV Infra Limited has received two prestigious Letters of Award (LOAs) from National Highways Logistics Management Limited (NHLML), a...

Inox Wind

Inox Wind Secures 200 MW Wind Project Order from NLC India

by Palak
July 31, 2026
0

Inox Wind Limited has secured a repeat 200 MW turnkey order from NLC India Limited. The order covers end-to-end project...

Next Post
National Grid Projects

Jacobs and Morrison Secure National Grid Projects

Hanwha Solutions

Hanwha invests $320M in cell and module manufacturing

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

August 3, 2026
278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved