Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

Wind Project in Maharashtra Gets Extended for Due to COVID 19

Urja Daily by Urja Daily
September 18, 2020
in News
Reading Time: 4 mins read
0
Wind-Project-in-Maharashtra-Gets-Extension-for-Disruptions-Due-to-COVID-Lockdown
Share on FacebookShare on TwitterShare on Linkedin

The Maharashtra Electricity Regulatory Commission (MERC) extended the commissioning date of the 76.5 MW wind project being developed by Clean Wind Power (Bhavnagar) Private Limited on the grounds of force majeure events.

The regulatory body extended the commissioning date by five months from June 23, 2020, to November 23, 2020.

RELATED POSTS

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

The Commission directed Clean Wind Power to submit a new performance bank guarantee (PBG) with a validity of six months beyond the extended date of commissioning to the Maharashtra State Electricity Distribution Company Limited (MSEDCL) within a month.

Earlier, Clean Wind Power had filed a petition seeking the extension of the commissioning date on account of force majeure events for the outbreak of the COVID-19 pandemic, which prevented it from fulfilling its obligations under the power purchase agreement (PPA).

Clean Wind Power is a special purpose vehicle of Hero Wind Energy Private Limited to develop a wind power project of 75.6 MW capacity at Anjanandi in the Aurangabad district of Maharashtra.

Hero took part in the bidding process and was declared the successful bidder for the project. Clean Wind Power and MSEDCL executed the power purchase agreement (PPA) on July 17, 2018, at a tariff of ₹2.86 (~$0.04)/kWh.  Clean Wind Power had appointed Suzlon Energy Limited as its engineering, procurement, and construction (EPC) contractor.

The developer could not meet the criteria for achieving financial closure due to force majeure events, including the delay in getting approval from MSEDCL to obtain grid connectivity from Maharashtra Energy Development Agency (MEDA) and delay in acquiring land for setting up the project.

In its order dated January 20, 2020, the Commission considered the delay in obtaining grid connectivity a force majeure event and allowed the extension of time to achieve commissioning by June 23, 2020.

Clean Wind Power, through Suzlon, had procured 15 parcels of land for the project. However, despite the extension granted by the Commission, Suzlon was unable to make progress in the procurement of land due to the lockdown.

MSEDCL, in its submission, stated that any relaxation in terms of PPA could only be provided by the provision made under the force majeure clause of the PPA. The state DISCOM said that Clean Wind Power was not entitled to any benefits as the Ministry of Home Affairs (MHA), in its order on April 15, 2020, had made it clear that the construction of renewable energy projects would be allowed. MSEDCL added that other reasons cited by Clean Wind Power for failure to achieve scheduled operation date (SCOD), such as delay in receipt of wind turbine generator components, delay in availability of connectivity, delay in procurement of land, and non-availability of workforce fall under force majeure exclusions clause of PPA. So, any reliefs sought on these grounds are not tenable.

On the other hand, Clean Wind Power said that Aurangabad district had been declared as a hotspot, and MHA’s order dated April 15, 2020, was not applicable in the case.

The wind developer further added that as on March 31, 2020, it had cumulatively incurred an amount of approximately ₹297.2 million (~$4.04 million) toward interest on all the loans availed by it for implementing the project.

The Commission, in its earlier order, had accepted the delay in grid connectivity as a force majeure event and extended the SCOD by 158 days.

Further, the Commission noted that to claim relief under the force majeure clause, the affected party must give notice within seven days from the date of the commencement of the force majeure event, and Clean Wind Power had complied with it.

The state regulator said that Clean Wind Power had submitted various documents to establish that even after relaxation in lockdown, Aurangabad being a hotspot area, restrictions on the movement of the public continued.

Accordingly, the Commission directed MSEDCL to extend the commissioning date of the project by five months from June 23, 2020, to November 23, 2020. Further, the Commission directed Clean Wind Power to provide a bank guarantee having validity for the extended SCOD.

The Commission also noted that the ultimate impact of the delay in commissioning the project is the imposition of liquidated damage on the generator, which includes forfeiting PBG for a delay of six months, and further delay would lead to a reduction in tariff by ₹0.50 (~$0.007)/kWh per day of the delay. Therefore, the exact dates between which the generator is affected by the force majeure events are critical.

The regulatory body directed MSEDCL not to invoke the bank guarantee for not achieving financial closure at this point and allow Clean Wind Power to commission the project by November 23, 2020.

Tags: Aurangabad districtClean Wind PowerDue to COVIDLockdownMaharashtraMSEDCLWind Project
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

by Palak
August 3, 2026
0

HONG KONG - Driven by the rapid iteration of global artificial intelligence (AI) large models, the continuous surge in computing demand...

ASDC CEO Prasanna Pahade

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

by Palak
August 3, 2026
0

New Delhi: The Automotive Skills Development Council (ASDC), India's apex skill development body for the automotive sector, today announced the appointment...

Ather Energy

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

by Palak
August 3, 2026
0

National : Ather Energy reported a strong EBITDA improvement of 1,650 basis points (bps) year-on-year (YoY).The company delivered 83,173 units...

PVV Infra

PVV Infra secures land mark sites from NHLML for developing wayside amenities

by Palak
August 3, 2026
0

Hyderabad : PVV Infra Limited has received two prestigious Letters of Award (LOAs) from National Highways Logistics Management Limited (NHLML), a...

Inox Wind

Inox Wind Secures 200 MW Wind Project Order from NLC India

by Palak
July 31, 2026
0

Inox Wind Limited has secured a repeat 200 MW turnkey order from NLC India Limited. The order covers end-to-end project...

Next Post
SunAlpha Energy enabling job opportunities post lockdown 4.0 amidst ongoing Covid-19 pandemic

SunAlpha Energy enabling job opp post lockdown 4.0 amidst ongoing Covid-19 pandemic

Global Energy Leaders are coming together to celebrate 4th World Energy Storage Day (WESD)

Global Energy Leaders are coming together to celebrate 4th World Energy Storage Day (WESD)

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

August 3, 2026
278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved