Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable

Hinduja Group Sets Target of 10 GW Renewable Capacity by 2030

Palak by Palak
August 20, 2025
in Renewable
Reading Time: 1 min read
0
Hinduja Group
Share on FacebookShare on TwitterShare on Linkedin

Reportedly, the Hinduja Group plans to achieve 10 GW of renewable energy capacity, which is more than triple its renewable energy capacity from the current 3 GW to over 10 GW by 2030.

The group will invest between USD3 billion and USD4 billion in solar, wind, hybrid projects, and battery energy storage systems. The capital expenditure will be funded through a mix of debt and equity with a debt-to-equity ratio of nearly 70:30. While scaling up its green portfolio, the group will continue to operate its thermal assets, ensuring a balance between conventional and renewable power sources. The expansion strategy also includes integrating electric vehicle charging infrastructure and deploying digital analytics to enhance performance and reliability. The group is in discussions with global investors to support its renewable energy growth plans.

RELATED POSTS

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

NIRL Secures LoI for 900 MW Solar Project from GUVNL

Tags: Battery EnergyHinduja GrouppowerrenewablesolarWind
ShareTweetShare
Palak

Palak

Related Posts

278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

by Palak
August 3, 2026
0

Bluebird Solar has announced a significant milestone by securing a 278 MW solar PV module supply order from Bridge &...

GUVNL

NIRL Secures LoI for 900 MW Solar Project from GUVNL

by Palak
August 3, 2026
0

NLC India Renewables Limited (NIRL), a wholly-owned subsidiary of NLC India Limited, has received a letter of intent (LoI) from...

Brookfield

Brookfield Launches Renewable Energy Platform Lumara

by Palak
August 3, 2026
0

Brookfield has launched Lumara, a new renewable energy platform focused on accelerating the development and construction of renewable energy projects....

NLC India

NLC India Renewables Wins 900 MW Solar Project from GUVNL

by Palak
August 3, 2026
0

NLC India Renewables Limited, a wholly owned subsidiary of NLC India Limited, has received a letter of intent (LoI) from...

Tata Power

Tata Power begins construction of 800 MW renewable energy project in Andhra Pradesh

by Palak
August 3, 2026
0

Tata Power Renewable Energy Limited (TPREL), a subsidiary of Tata Power, has conducted the groundbreaking ceremony for its 800 MW...

Next Post
Global Trade

How Shipping Containers Are Redefining Global Trade?

AXITEC

AXITEC Expands Solar Presence in Uttar Pradesh, Bihar & North East

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

August 3, 2026
278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved