Adani Green Energy Limited’s (AGEL) subsidiary, Adani Renewable Energy Three Limited, has commissioned a 50 MW solar-wind hybrid power project at Khavda, Gujarat. The commissioning of the hybrid project has increased AGEL’s total operational renewable generation capacity to 15,865.5 MW.
Furthermore, AGEL is developing a 30 GW renewable energy plant on the barren waste land at Khavda. The renewable energy plant is being built across an area of 538 square km.
Earlier in May 2025, AGEL operationalised a solar power project with a capacity of 187.5 MW at Khavda, Gujarat, through its subsidiary Adani Renewable Energy Fifty Seven Limited.