Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Storage

L&T Bags EPC Contract for Integrated Solar and Storage Project in Bihar

Palak by Palak
August 5, 2025
in Storage
Reading Time: 1 min read
0
Larsen & Toubro’s
Share on FacebookShare on TwitterShare on Linkedin

Larsen & Toubro’s (L&T) renewables unit has won Bihar State Power Generation Company Limited’s engineering, procurement, and construction (EPC) contract to develop a grid-connected solar-plus-storage project in Bihar. The project consists of a 116 MWac solar photovoltaic (PV) plant integrated with a 241 MWh battery energy storage system (BESS) in Kajra, Lakhisarai district of Bihar. 

The estimated cost of the project is Rs 10.64 billion, and it will be completed within 18 months. Furthermore, the project must use solar modules from the Ministry of New and Renewable Energy’s List-I under the Approved List of Models and Manufacturers of solar PV modules. Moreover, the EPC order marks an extension of the earlier phase, thereby taking the total co-located storage capacity of the renewable generation site at Lakhisarai to 495 MWh. 

RELATED POSTS

Sun Drops Energia signs 120 MW/240 MWh BESPA with GUVNL

Ceigall India secures 150 MW standalone BESS projects in Punjab

The deployment of a four-hour BESS alongside intermittent solar generation will enable energy time-shifting, allowing surplus clean energy to be stored and despatched during peak demand periods. Furthermore, the initiative aligns with the government of India’s policy push for co-located renewable energy storage systems and supports the Jal-Jeevan-Hariyali Abhiyan in Bihar.

Tags: Larsen & Toubro’sRenewable EnergysolarStorage
ShareTweetShare
Palak

Palak

Related Posts

Sun Drops Energia

Sun Drops Energia signs 120 MW/240 MWh BESPA with GUVNL

by Palak
May 25, 2026
0

Sun Drops Energia Limited, a subsidiary of KPI Green Energy Limited, has signed a battery energy storage purchase agreement (BESPA)...

Ceigall India

Ceigall India secures 150 MW standalone BESS projects in Punjab

by Palak
May 18, 2026
0

Ceigall India Limited has secured two separate orders from Punjab State Power Corporation Limited for development of standalone battery energy...

POWERGRID

POWERGRID Invites Bids for 300 MWh Battery Storage Project

by Palak
May 17, 2026
0

Power Grid Corporation of India Limited (POWERGRID) has invited tender for design, supply, erection, testing and commissioning of a 150...

GE Vernova

GE Vernova secures order for 1.35 GW Upper Sileru pumped storage project

by Palak
May 7, 2026
0

GE Vernova has secured an order from Megha Engineering & Infrastructures Limited (MEIL) to supply nine 150 MW pumped storage...

LPG

India’s LPG Crisis Signals Urgent Energy Infrastructure Push

by Palak
April 28, 2026
0

New Delhi : The ongoing LPG disruption linked to tensions in West Asia has brought renewed attention to India’s energy security,...

Next Post
Suzlon

Suzlon Secures 381 MW Wind Project Order from Zelestra

OWGP

OWGP Unveils £2 Million Funding Initiative to Strengthen UK Offshore Wind Manufacturing

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Joint solar

Joint Solar sharpens focus on TOPCon and higher-efficiency solar modules

June 3, 2026
Shri V. Packirisamy

V. Packirisamy Appointed Director (Commercial) at Power Finance Corporation Limited

June 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • How proper refurbishment can extend life of pre-owned bikes in India?

    0 shares
    Share 0 Tweet 0
  • ACWA Power Signs Landmark $10 Billion Clean Energy Agreements

    0 shares
    Share 0 Tweet 0

Joint Solar sharpens focus on TOPCon and higher-efficiency solar modules

V. Packirisamy Appointed Director (Commercial) at Power Finance Corporation Limited

Sharika Enterprises Limited Enters SCADA-ADMS Market with Uttarakhand Grid Modernization Project

Cargill Launches Two-Year Livestock Development Initiative to Strengthen Maharashtra’s Dairy Sector

Flip Chip Technology Market Witnesses Rising Demand from Consumer Electronics Sector

Servotech Signs ₹400 Crore MoU for Haryana Manufacturing Expansion

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved