Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Storage

METLEN and Jinko ESS Forge Energy Storage Partnership for Europe and Latin America

Palak by Palak
June 27, 2025
in Storage
Reading Time: 1 min read
0
METLEN
Share on FacebookShare on TwitterShare on Linkedin

Metlen Energy & Metals (METLEN) and Jinko ESS have inked an agreement to establish a partnership for utility-scale battery energy storage systems (BESS). The agreement provides a framework for deploying over 3 GWh of energy storage projects across Chile and European markets.

The partnership builds around the 1.6 GWh project currently underway in Chile. In this project, Jinko ESS is supplying its G2 Utility systems for full delivery of the project by the fourth quarter of 2025. The agreement highlights the commitment of the two companies towards enabling renewable energy adoption through advanced storage solutions.

RELATED POSTS

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Pace Digitek Wins EPC Contract for 250 MW BESS Project from NLC India

Earlier in May 2025, METLEN inked new engineering, procurement, and construction contracts for renewable energy projects in UK with a combined capacity of 313.4 MW. The contracts are for five solar parks and one BESS. Construction on the projects is set to commence at various stages throughout 2025, and all units are expected to be completed by the end of 2026.

Tags: BESSJinko ESSMETLENRenewable EnergyStorage
ShareTweetShare
Palak

Palak

Related Posts

Battery Storage

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

by Palak
August 3, 2026
0

Pace Digitek Limited has secured an engineering, procurement, and construction (EPC) contract from NLC India Limited for the development of...

Energy Storage

Pace Digitek Wins EPC Contract for 250 MW BESS Project from NLC India

by Palak
July 31, 2026
0

Pace Digitek Limited has signed an engineering, procurement, and construction (EPC) contract with NLC India Limited for the development of...

Waaree Renewable

Waaree Renewable signs ECI agreement for solar-BESS project in New Zealand

by Palak
July 30, 2026
0

Waaree Renewable Technologies Limited has signed an early contractor involvement (ECI) agreement with the special purpose vehicle of a leading...

Sodium-ion Battery Market

Sodium-ion Battery Market Outlook 2026–2034: Energy Storage Investments Drive Growth

by Palak
July 28, 2026
0

The global sodium-ion battery market is charging toward a new era of affordable, sodium-abundant energy storage — and the numbers...

Cypress Creek Renewables and Google Break

Cypress Creek Renewables and Google Break Ground on 2.5 GW Solar-Plus-Storage Project in the U.S.

by Palak
July 16, 2026
0

Cypress Creek Energy and Google have commenced construction of the first two phases of the Steel River Energy Center in...

Next Post
Bondada Engineering

Bondada Engineering Establishes GreenBond RE Park to Accelerate Clean Energy Projects

Meta

Meta Signs EAPAs with Adapture Renewables for 360 MW Solar Project in Texas

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Crealights

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

August 3, 2026
278 MW solar PV module supply order

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

August 3, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0
  • StarlinePS Enterprises Invests ₹160 Crore in Celloraa Energy

    0 shares
    Share 0 Tweet 0
  • Business Delegation Signs 66 MoUs During Central Asia Visit to Boost Multi-Sector Collaboration

    0 shares
    Share 0 Tweet 0

Crealights Locks In Forward Supply of 10 Million DSP Chips, Fortifying AI Optical Interconnect Leadership

Bluebird Solar Wins 278 MW PV Module Supply Contract from Bridge & Roof Company Ltd. for SJVN Renewable Energy Projects

ASDC Announces Leadership Transition; Prasanna Pahade Appointed New CEO

Ather Energy Reports 87.2% Revenue Growth, Strong EBITDA Improvement

PVV Infra secures land mark sites from NHLML for developing wayside amenities

Pace Digitek Signs EPC Contract for 250 MW BESS Project with NLC India

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved