Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home Renewable Solar

MNRE Releases Draft Guidelines for Lab Testing of Solar PV Modules

Palak by Palak
May 30, 2025
in Solar
Reading Time: 2 mins read
0
MNRE
Share on FacebookShare on TwitterShare on Linkedin

The Ministry of New and Renewable Energy (MNRE) has issued draft guidelines for the series approval of solar photovoltaic (PV) modules for testing in laboratories under the Solar Systems, Devices and Components Goods Order, 2025. These guidelines aim to support labs and manufacturers in defining product families for compulsory registration with the Bureau of Indian Standards. A product family is defined as a group of modules constructed using a maximum configuration of components or sub-assemblies and the methodology used to build various models from these components. For testing multiple power bins within IEC TS 62915 limits, two modules each must be taken from the lower end, median (or the next higher class, if median does not exist), and higher-end bins. For single power class extension, two modules each from lower and higher bins are required. If extension is only in one direction, modules from that bin are tested. High-capacitance PV modules must meet hysteresis loss limits below 0.5 per cent under IEC 60904-1:2020, or specific data on the time-derivatives of current and voltage must be reported.

Quantitative sample selection is guided by IS 14286:2023, requiring 12 randomly selected modules from production batches. These must be complete, quality-inspected, and carry clear markings laminated inside the glass, including details like manufacturer name, model number, serial number, wattage with ±3 per cent tolerance, and manufacturing date and place. Additional labeling requirements apply to thin-film modules. Test labs are instructed not to accept unmarked modules. Sample submission under IS/IEC 61730-1:2023 must include full bills of materials, fabrication details, and applicable compliance certificates. For safety tests under IS/IEC 61730-2:2023, at least 10 framed and two unframed PV modules are required, with additional modules needed for pollution degree assessments and specific sequence tests. For cemented joints, requirements vary based on the MST test type, including lap shear strength tests with up to 20 extra samples for glass/glass constructions.

RELATED POSTS

IRFC signs Rs 42 billion loan agreement with DVC

GREW Solar Expands South India Presence with Energy Cubez Partnership

In case of any changes to design, materials, components, or processing steps, retesting in line with IS/IEC 62915:2023 must be conducted to maintain type and safety certifications. Manufacturers are responsible for disclosing such changes and submitting data to potentially reduce retesting requirements. Variations that exceed the stated tolerance levels require testing under worst-case conditions. For example, if a 10 per cent reduction in front glass thickness would trigger a re-test, the module must be submitted with the lowest possible thickness. The manufacturer must reference the originally tested dimension or thickness when proposing modifications. All modules submitted for testing must be technically identical and must conform to the relevant standards for design, construction, and quality assurance.

Tags: MNREPV modulessolar
ShareTweetShare
Palak

Palak

Related Posts

IRFC

IRFC signs Rs 42 billion loan agreement with DVC

by Urja Daily
October 1, 2026
0

Indian Railway Finance Corporation Limited (IRFC), a Navratna central public sector enterprise under the Ministry of Railways, has signed a...

Cochin Event

GREW Solar Expands South India Presence with Energy Cubez Partnership

by Urja Daily
October 1, 2026
0

Mumbai / Ahmedabad : GREW Solar announced a new channel partnership with Energy Cubez, Cochin, strengthening its distribution presence in Kerala...

KPI Green

KPI Green Wins Rs 20.25 Billion Solar EPC Contract from NACOF Oorja

by Urja Daily
September 30, 2026
0

KPI Green Energy Limited has secured an engineering, procurement and construction (EPC) order worth approximately Rs 20.25 billion from NACOF...

Sonu Sood, Sarika Bhatia with Channel Partner at Servotech Navaarambh 2026

Servotech Unveils Next-Generation Solar Inverters at ‘Navaarambh 2026’, Celebrates Growing Channel Network

by Urja Daily
September 29, 2026
0

New Delhi : Servotech Renewable Power System Ltd. India’s leading manufacturer of solar and renewable energy solutions, hosted ‘Navaarambh 2026’,...

Waaree Energies

Waaree Energies moves to merge Indosolar into the company

by Urja Daily
September 28, 2026
0

Waaree Energies Limited’s board of directors approved the draft scheme of amalgamation of Indosolar Limited with Waaree Energies Limited and...

Next Post
Reliance Power

Reliance Power Secures 350 MW Solar Project with 700 MWh Energy Storage

RGE and TotalEnergies

RGE and TotalEnergies Partner to Develop Solar and Battery Storage Project in Indonesia

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

MG Indian Super League

ISL 2026-27 to be known as the MG Indian Super League

October 2, 2026
Thousand Trails

TARIL Secures Large Order from Damodar Valley Corporation for 500 MVA and 200 MVA Auto Transformers

October 2, 2026

MOST VIEWED

  • Solar

    When the Sun Began Paying the Electricity Bills: The Story of PM Surya Ghar Muft Bijli Yojana

    0 shares
    Share 0 Tweet 0
  • India’s Emerging Polysilicon Manufacturing Ecosystem: Opportunities and Challenges

    0 shares
    Share 0 Tweet 0
  • KP Group’s Listed Renewable Businesses Post Strong Multi-Year Growth as Portfolio Expands Beyond 9.2 GW

    0 shares
    Share 0 Tweet 0
  • Xpeng Selects u‑blox F9 Centimeter-level Multi-Band GNSS Technology for P7 Smart EV

    0 shares
    Share 0 Tweet 0
  • KP Group & PP Savani University Launches Urjanoor Scholarship

    0 shares
    Share 0 Tweet 0

ISL 2026-27 to be known as the MG Indian Super League

TARIL Secures Large Order from Damodar Valley Corporation for 500 MVA and 200 MVA Auto Transformers

KP Group Unveils KP 3.0 Strategy to Drive Its Next Phase of Growth

ASDC Champions Shine at WorldSkills Shanghai 2026; Secure 5 Medals for Excellence

Honeywell Technologies Partner with Dangote to Accelerate Refinery Development

Yash Highvoltage Expands US Footprint to 22 States with New Midwest Partnership

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved