Urja Daily
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe
No Result
View All Result
Urja Daily
No Result
View All Result
Home News

Vistra, LG Energy Expand Californian Battery Facility

Urja Daily by Urja Daily
August 21, 2021
in News
Reading Time: 2 mins read
0
Vistra, LG Energy
Share on FacebookShare on TwitterShare on Linkedin

Vistra Corp., a Texas-based energy firm, and LG Energy Solution, a South Korean battery maker, have completed setting up the 400 MW/1.6 GWh Vistra Moss Landing Energy Storage Facility in Monterey County, California. Vistra recently finished construction on Phase II of the facility.

The battery system is now storing power and releasing it to California’s grid when it is needed. The 100-megawatt expansion as part of Phase II has brought the facility’s total capacity to 400 MW/1.6 GWh, making it the largest of its kind in the world.

RELATED POSTS

Bang & Olufsen Teams Up with Breathe Battery Technologies to Boost Battery Life and Product Longevity

Mobisoft Enhances FleetNXT Platform for Higher Efficiency and Major Cost Savings in Event Transportation

“This facility provides a solution California desperately needs and this expansion was able to come online at the right time – as the summer heat intensifies and demand for electricity is at its highest. It is possible because of the partnership between Vistra and the State of California, Pacific Gas and Electric Company, LG Energy Solution, and Burns & McDonnell,” said Curt Morgan, chief executive officer at Vistra.

Announced just 15 months ago with construction starting in September 2020, the Phase II expansion project was completed in July 2021, ahead of schedule despite the many challenges presented by the COVID-19 pandemic, said Vistra.

Moss Landing is a flagship project in which Vistra developed advanced energy storage capacity, for which LG Energy Solution provided batteries using its latest innovative Transportable Rack (TR1300).

The project is also the world’s largest lithium-ion battery energy storage project, and LG Energy Solution’s innovative product development and effective on-site support reduced installation time and costs, and strengthened customer value, said LG.

Vistra’s recently added facility is co-located on the site of its existing Moss Landing Power Plant in Monterey County, a site that’s been providing electricity to Californians since 1950. Burns & McDonnell provided engineering, procurement, and construction (EPC) expertise for the expansion.

The 100-MW/400-MWh Phase II expansion is operating under a 10-year resource adequacy agreement with Pacific Gas and Electric Company (PG&E). The 300-MW/1,200-MWh Phase I project has a similar 20-year resource adequacy agreement with PG&E.

“As the California blackouts of August 2020 and heat waves in the West Coast gain national and even global attention, the role of battery energy storage in supplying energy and ensuring quality control becomes even more important to us as well,” said Youngjoon Shin, LG Energy Solution’s SVP of ESS Business.

The Moss Landing project will enable the transformation of California’s energy system to more clean renewable resources, reducing greenhouse gas emissions while enhancing reliability of the power grid. With the cooperation between LG Energy Solution and Vistra, emissions-free electricity is being supplied to 300,000 households when it is needed most, said LG.

Tags: BatteryEnergyEnergy StorageLG Energy SolutionVistra Corp.
ShareTweetShare
Urja Daily

Urja Daily

Related Posts

Dr. Ian Campbell

Bang & Olufsen Teams Up with Breathe Battery Technologies to Boost Battery Life and Product Longevity

by Palak
September 1, 2025
0

Disposable tech is out. Bang & Olufsen and BREATHE Battery Technologies are leading the shift towards lasting intelligent design. Together,...

Mr. Nitin Lahoti

Mobisoft Enhances FleetNXT Platform for Higher Efficiency and Major Cost Savings in Event Transportation

by Palak
August 30, 2025
0

Pune – Mobisoft Infotech has announced a significant upgrade to its event transportation platform with the release of FleetNXT 2.0. The enhanced version delivers...

Mukesh Singla

Zypp Electric Names Mukesh Singla as New Chief Financial Officer

by Palak
August 30, 2025
0

Gurugram – Zypp Electric announced the appointment of Mukesh Singla as Chief Financial Officer (CFO) effective from 1st August, 2025.  Mukesh...

Flipkart

Flipkart Expands Supply Chain Network Across India with New Facilities in Key Cities

by Palak
August 30, 2025
0

Bengaluru, Karnataka, India Spanning 35 lakh sq. ft., the expanded network of the Flipkart centers is designed to power festive...

ACME Emerges

ACME Emerges Winner Again in SECI’s Green Ammonia Auction

by Palak
August 26, 2025
0

ACME Cleantech Solutions Private Limited (ACME) has emerged as the winner of Solar Energy Corporation of India’s (SECI) green ammonia...

Next Post
residential-solar

KERC Sweetens Rooftop Solar Tariffs To Rs 4.02/Unit

tesla

Tesla & Local Partners to Build Storage Facility in Japan

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

SAEL

SAEL Commissions 200 MW Solar Project in Rajasthan

September 1, 2025
Meenakshi Energy

Meenakshi Energy Commissions 1,000 MW Thermal Power Plant in Andhra Pradesh

September 1, 2025

MOST VIEWED

  • Hydrom

    Hydrom and Thyssenkrupp Nucera Partner for Green Hydrogen Projects in Oman

    0 shares
    Share 0 Tweet 0
  • SFC India Selected Dassault Systèmes for Indigenization and Digital Transformation of Wastewater Treatment Plants

    0 shares
    Share 0 Tweet 0
  • Juniper Green Energy Secures 1 GW Solar Module Deal with First Solar

    0 shares
    Share 0 Tweet 0
  • PGCIL Wins ISTS Project for Renewable Energy Integration in Karnataka

    0 shares
    Share 0 Tweet 0

SAEL Commissions 200 MW Solar Project in Rajasthan

Meenakshi Energy Commissions 1,000 MW Thermal Power Plant in Andhra Pradesh

NLC India Begins Operations of 300 MW Solar Project’s First Phase in Rajasthan

Power Mech Projects Wins ₹3.71 Billion Contract from Mahan Energen

ACEN Australia Gains Green Light for 900 MW Wind Project

Bang & Olufsen Teams Up with Breathe Battery Technologies to Boost Battery Life and Product Longevity

Latest Magazine

© 2016 – 2025 TechZone Print Media | All Rights Reserved

  • About Us
  • Contact Us
No Result
View All Result
  • News
  • Renewable
    • Solar
    • Rooftop
    • Floating Solar
    • Module
    • Wind
    • Hydrogen
    • Biomass
    • Tenders
    • Sustainibility
  • Storage
  • E-Mobility
  • EV Battery
  • Smart City
  • Power
    • Smart Grid
    • Microgrid
    • Off-Grid
  • Editor’s Pick
    • Articles
    • In Talks
    • E-MAG
    • Market Research
  • On-demand Webinars
  • More
    • Events
    • Contact Us
    • Subscribe

© 2016 - 2025 TechZone Print Media | All Rights Reserved